[Federal Register: August 25, 2005 (Volume 70, Number 164)]
[Notices]
[Page 49918-49919]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr25au05-36]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application Accepting for Filing and Soliciting Motions
To Intervene, Protests and Comments
August 18, 2005.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Preliminary Permit.
b. Project No.: 12582-000.
c. Date filed: April 11, 2005.
d. Applicant: Clover Creek Hydro, LLC.
e. Name of Project: Byram Hydroelectric Project.
f. Location: On the Clover Creek portion of the Main Canal of the
North Side Canal Company and Little Wood River, near Gooding, in
Gooding County, ID.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. David A. O'Day, P.E., Clover Creek Hydro,
LLC, P.O. Box 603, Boise, ID 83701-0603, (208) 861-1788.
i. FERC Contact: Etta Foster, (202) 502-8769.
j. Deadline for filing comments, protests, and motions to
intervene: 60 days from the issuance date of this notice.
All documents (original and eight copies) should be filed with
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426. Please include the project
number (P-12582-000) on any comments, protests, or motions filed.
k. Description of Project: The proposed project would consist of:
(1) A diversion canal of undetermined dimensions (depending on depth to
rock); (2) an overflow weir; (3) a 96-inch, 400-foot-long penstock; (3)
a powerhouse containing three to four turbines with an installed
capacity of 1.0 MW; (4) a 12.5 kV transmission line, approximately \1/
4\-mile-long interconnected to the local distribution lines of the
local utility; and (5) appurtenant facilities.
The project would have an estimated annual generation of 4,888,000
kWh. The applicant plans to negotiate a power sales agreement with the
Idaho Power Company.
l. Location of Application: A copy of the application is available
for inspection and reproduction at the Commission in the Public
Reference Room, located at 888 First Street, NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at http://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
h. above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Competing Preliminary Permit--Anyone desiring to file a
competing application for preliminary permit for a proposed project
must submit the competing application itself, or a notice of intent to
file such an application, to the Commission on or before the specified
comment date for the particular application (see 18 CFR 4.36).
Submission of a timely notice of intent allows an interested person to
file the competing preliminary permit application no later than 30 days
after the specified comment date for the particular application. A
competing preliminary permit application must conform with 18 CFR
4.30(b) and 4.36.
o. Competing Development Application--Any qualified development
applicant desiring to file a competing development application must
submit to the Commission, on or before a specified comment date for the
particular application, either a competing development application or a
notice of intent to file such an application. Submission of a timely
notice of intent to file a development application allows an interested
person to file the competing application no later than 120 days after
the specified comment date for the particular application. A competing
license application must conform with 18 CFR 4.30(b) and 4.36.
p. Notice of Intent--a notice of intent must specify the exact
name, business address, and telephone number of the prospective
applicant, and must include an unequivocal statement of intent to
submit, if such an application may be filed, either a preliminary
permit application or a development application (specify which type of
application). A notice of intent must be served on the applicant(s)
named in this public notice.
q. Proposed Scope of Studies under Permit--A preliminary permit, if
issued, does not authorize construction. The term of the proposed
preliminary permit would be 36 months. The work proposed under the
preliminary permit would include economic analysis, preparation of
preliminary engineering plans, and a study of environmental impacts.
Based on the results of these studies, the Applicant would decide
whether to proceed with the preparation of a development application to
construct and operate the project.
r. Comments, Protests, or Motions to Intervene--Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all
[[Page 49919]]
protests or other comments filed, but only those who file a motion to
intervene in accordance with the Commission's Rules may become a party
to the proceeding. Any comments, protests, or motions to intervene must
be received on or before the specified comment date for the particular
application.
Comments, protests and interventions may be filed electronically
via the Internet in lieu of paper; See 18 CFR 385.2001 (a)(1)(iii) and
the instructions on the Commission's Web site under ``e-filing'' link.
The Commission strongly encourages electronic filing.
s. Filing and Service of Responsive Documents--Any filings must
bear in all capital letter the title ``COMMENTS'', ``RECOMMENDATIONS
FOR TERMS AND CONDITIONS'', ``PROTEST'', ``MOTION TO INTERVENE'',
``NOTICE OF INTENT'', or ``COMPETING APPLICATION'', as applicable, and
the Project Number of the particular application to which the filing
refers. Any of the above-named documents must be filed by providing the
original and the number of copies provided by the Commission's
regulations to: The Secretary, Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC 20426. A copy of any motion to
intervene must also be served upon each representative of the Applicant
specified in the particular application.
t. Agency Comments--Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
Linda Mitry,
Deputy Secretary.