[Federal Register: September 2, 2005 (Volume 70, Number 170)]
[Notices]               
[Page 52375-52377]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr02se05-58]                         

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. CP05-83-000, CP05-84-000, CP05-85-000, CP05-86-000]

 
Port Arthur LNG, L.P.; Port Arthur Pipeline, L.P.; Notice of 
Availability of the Draft Environmental Impact Statement and Draft 
General Conformity Determination for the Port Arthur LNG Project

August 26, 2005.
    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) has prepared this draft Environmental Impact Statement 
(EIS) for the construction and operation of the liquefied natural gas 
(LNG) import terminal and natural gas pipeline facilities (referred to 
as the Port Arthur LNG Project or Project) as proposed by Port Arthur 
LNG, L.P. and Port Arthur Pipeline, L.P. (collectively Sempra) in the 
above-referenced dockets.
    The draft EIS was prepared to satisfy the requirements of the 
National Environmental Policy Act (NEPA). The staff concludes that 
approval of the Port Arthur LNG Project, with appropriate mitigating 
measures as recommended, would have limited adverse environmental 
impact. The draft EIS evaluates alternatives to the proposal,

[[Page 52376]]

including system alternatives, alternative sites for the LNG import 
terminal, and pipeline alternatives. The draft EIS also contains our 
draft General Conformity Analysis and Essential Fish Habitat Analysis.
    The purpose of the Port Arthur LNG Project is to allow access to 
LNG supplies and thus provide a new, stable source of between 1.5 and 
3.0 billion cubic feet per day of natural gas to supplement the 
diminishing supplies while utilizing, to the extent practicable, the 
existing natural gas pipeline infrastructure within the Gulf of Mexico 
region of the U.S.; and allow natural gas delivery to markets in the 
Midwestern and Northeastern markets by use of existing interstate 
natural gas pipeline systems. Sempra's proposed facilities would be 
constructed in two phases and would ultimately provide an average of 
3.0 billion cubic feet per day of natural gas to the existing pipeline 
infrastructure in Texas and Louisiana, and to potential other end-users 
in the Midwestern and Northeastern natural gas markets.
    The draft EIS addresses the potential environmental effects of the 
construction and operation of the following facilities in Jefferson and 
Orange Counties, Texas, and Cameron, Calcasieu, and Beauregard 
Parishes, Louisiana:
     A protected LNG unloading slip with ship maneuvering area 
(turning basin);
     LNG ship unloading system consisting of two berths each 
consisting of four 16-inch unloading arms and one 16-inch vapor return 
arm, mooring and breasting dolphins, gangway tower, firewater monitors, 
service utilities and associated valves and piping. LNG transfer from 
the ship to the on-shore storage system would be through two 36-inch-
diameter unloading lines, one per berth. Each berth would be sized for 
an unloading rate of 17,500 cubic meters per hour (m\3\/hr); although, 
only one ship would be unloaded at a time during Phase I;
     LNG storage system consisting of a total of six full-
containment LNG storage tanks each with a nominal capacity of 160,000 
cubic meters (m\3\) (1,006,000 barrels). Each tank would be equipped 
with three can-type, fully submerged LNG in-tank pumps sized for 2,976 
gallons per minute (gpm) each;
     Boil-off gas (BOG) recovery system consisting of 4 
reciprocating BOG compressors each sized for 13,887 pounds per hour 
(lb/hr), four integrally geared return gas blowers, each sized for 
32,228 lb/hr, and one direct-contact recondenser;
     LNG transfer system to transfer LNG from the recondenser 
to the send-out LNG vaporizers. The transfer system would consist of 16 
pot-mounted LNG booster pumps (two being spares) each sized for 1,964 
gpm;
     LNG vaporization system consisting of 12 shell-and-tube 
LNG vaporizers (two being spares) each sized for 0.305 Bcf/d. The heat 
source to the vaporizers would be heated water;
     Hot water heating system consisting of 8 gas-fired hot 
water heaters each sized for 348 million British thermal units per hour 
(MMBtu/hr) and 6 centrifugal hot water circulation pumps (two being 
spares) each sized for 11,727 gpm;
     Emergency vent system; LNG spill containment system; fire 
water system; fuel gas, nitrogen, instrument/plant air and service 
water utility systems; various hazard detection, control, and 
prevention systems; and cryogenic piping, electrical, and 
instrumentation systems;
     Utilities, buildings and support facilities; facilities 
for pig launchers and receivers; and metering facilities; and
     Approximately 73 miles of 36-inch-diameter natural gas 
pipeline and associated ancillary pipeline facilities.

Comment Procedures and Public Meetings

    Any person wishing to comment on the draft EIS may do so. To ensure 
consideration prior to a Commission decision on the proposal, it is 
important that we receive your comments before the date specified 
below. Please carefully follow these instructions to ensure that your 
comments are received in time and properly recorded:
     Send an original and two copies of your comments to: 
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 
First Street, NE., Room 1A, Washington, DC 20426.
     Reference Docket No. CP05-83-000 et al.;
     Label one copy of the comments for the attention of Gas 
Branch 2, PJ11.2; and
     Mail your comments so that they will be received in 
Washington, DC on or before October 17, 2005.
    Please note that we are continuing to experience delays in mail 
deliveries from the U.S. Postal Service. As a result, we will include 
all comments that we receive within a reasonable time frame in our 
environmental analysis of this Project. However, the Commission 
strongly encourages electronic filing of any comments or interventions 
to this proceeding. See 18 CFR 385.2001(a)(1)(iii) and the instructions 
on the Commission's Web site at http: //http://www.ferc.gov under the ``e-

Filing'' link and the link to the User's Guide. Before you can file 
comments you will need to create a free account, which can be created 
by clicking on ``Login to File'' and then ``New User Account.''
    In addition to or in lieu of sending written comments, we invite 
you to attend the public comment meetings we have scheduled as follows:

October 4, 2005, 7 p.m. (CST); VFW Post 9854, 222 Highway 109 S, 
Vinton, Louisiana, Telephone: (337) 589-5832.
October 5, 2005, 7 p.m. (CST); Holiday Inn Park Central, 2929 Jimmy 
Johnson Blvd., Port Arthur, Texas, Telephone: (409) 724-5000.

    Interested groups and individuals are encouraged to attend and 
present oral comments on the environmental impact described in the 
draft EIS. Transcripts of the meeting will be prepared.
    After these comments have been reviewed, any significant new issues 
are investigated, and modifications are made to the draft EIS, a final 
EIS will be published and distributed by the staff. The final EIS will 
contain the staff's responses to timely comments received on the draft 
EIS.
    Comments will be considered by the Commission but will not serve to 
make the commentor a party to the proceeding. Any person seeking to 
become a party to the proceeding must file a motion to intervene 
pursuant to Rule 214 of the Commission's Rules of Practice and 
Procedures (18 CFR 385.214). Anyone may intervene in this proceeding 
based on this draft EIS. You must file your request to intervene as 
specified above.\1\ You do not need intervener status to have your 
comments considered.
---------------------------------------------------------------------------

    \1\ Interventions may also be filed electronically via the 
Internet in lieu of paper. See the previous discussion on filing 
comments electronically.
---------------------------------------------------------------------------

    The draft EIS has been placed in the public files of the FERC and 
is available for public inspection at: Federal Energy Regulatory 
Commission, Public Reference and Files Maintenance Branch, 888 First 
Street, NE., Room 2A, Washington, DC 20426, (202) 502-8371.
    A limited number of copies of the draft EIS are available from the 
Public Reference and Files Maintenance Branch identified above. In 
addition, copies of the draft EIS have been mailed to Federal, State, 
and local agencies; elected officials; public interest groups; 
individuals and affected landowners who requested a copy of the draft 
EIS; and parties to these proceedings.
    Additional information about the Project is available from the 
Commission's Office of External Affairs,

[[Page 52377]]

at 1-866-208-FERC or on the FERC Internet Web site (http://www.ferc.gov
) using the eLibrary link. Click on the ``eLibrary'' link, 

click on ``General Search'' and enter the docket number excluding the 
last three digits in the Docket Number field. Be sure you have selected 
an appropriate date range. For assistance, please contact FERC Online 
Support at: FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676, 
or for TTY at (202) 502-8659. The eLibrary link on the FERC Internet 
Web site also provides access to the texts of formal documents issued 
by the Commission, such as orders, notices, and rulemakings.
    In addition, the Commission now offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to the eSubscription link on the FERC Internet Web 
site.

Magalie R. Salas,
Secretary.
[FR Doc. E5-4811 Filed 9-1-05; 8:45 am]

BILLING CODE 6717-01-P