[Federal Register: December 9, 2005 (Volume 70, Number 236)]
[Notices]               
[Page 73233-73234]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr09de05-76]                         

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6670-01]

 
Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/.


Weekly receipt of Environmental Impact Statements
Filed November 28, 2005 Through December 2, 2005
Pursuant to 40 CFR 1506.9.

EIS No. 20050501, Draft EIS, NRS, AR, Walnut Bayou Irrigation Project, 
Natural Resource Plan for the Little Red River Watershed, Little River 
County, AR, Comment Period Ends: January 23, 2006, Contact: Kalven L. 
Trice 501-301-3100.
EIS No. 20050502, Final EIS, AFS, MT, Fishtrap Project, Proposed Timber 
Harvest, Prescribed Burning, Road Construction and Other Restoration 
Activities, Lolo National Forest, Plains/Thompson Falls Ranger 
District, Sanders County, MT, Wait Period Ends: January 9, 2006, 
Contact: Randy Hojem 406-826-4308.
EIS No. 20050503, Draft EIS, GSA, WA, Peace Arch Port of Entry 
Redevelopment Project, Improvements to Security, Safety and 
Functionality, Canadian Border in Blaine, Whatcom County, WA, Comment 
Period Ends: January 23, 2006, Contact: Michael Levine 253-931-7263.
EIS No. 20050504, Draft Supplement, COE, MO, St. Johns Bayou and New 
Madrid Floodway Project, Channel Enlargement and Improvement, Revised 
Information to Clarify and Address Issues of Concern, Flood Control 
National Economic Development (NED), New Madrid, Mississippi and Scott 
Counties, MO, Comment Period Ends: January 23, 2006, Contact: Danny 
Ward 901-544-0709.
EIS No. 20050505, Final EIS, AFS, 00, Caribou Travel Plan Revision, 
Determine the Motorized Road and Trail System, Implementation, Caribou-
Targhee National Forest, Westside, Soda Spring and Montpeller Ranger 
Districts, Bannock, Bear River, Bonneville, Caribou, Franklin, Oneida 
and Power Counties, ID; Box Elder and Cache Counties, UT and Lincoln 
County, WY, Wait Period Ends: January 9, 2006, Contact: Deb Tiller 208-
557-5779.
EIS No. 20050506, Final EIS, NOA, 00, Pacific Coast Groundfish Fishery 
Management Plan, To Conserve and Enhance Essential Fish Habitat (EFH) 
Designation and Minimization of Advise Impacts, Coast Exclusive 
Economic Zone, WA, OR and CA, Wait Period Ends: January 9, 2006, 
Contact: Dr. Robert Lohn 206-526-6150.
EIS No. 20050507, Draft EIS, BLM, NV, Sheep Complex, Big Springs and 
Owyhee Grazing Allotments Sensitive Bird Species Project, Determine 
Impacts of Livestock Grazing, Elko County, NV, Comment Period Ends: 
January 23, 2006, Contact: Lorrie West 775-753-0200.
EIS No. 20050508, Final EIS, NPS, IN, Lincoln Boyhood National Memorial 
General Management Plan, Implementation, Lincoln City Spencer County, 
IN, Wait Period Ends: January 9, 2006, Contact: Nick Chevance 402-661-
1844.
EIS No. 20050509, Final Supplement, COE, FL, Central and Southern 
Florida Project, Tamiami Trail Modifications, Modified Water Deliveries 
to Everglades National Park, Authorized Flow of Water from WCA-38 and 
the L-29 Canal North of the Tamiami Trail, Dade County, FL, Wait Period 
Ends: January 9, 2006, Contact: Dr. Jonathan Moulding 904-232-2286.
EIS No. 20050510, Draft EIS, FHW, 00, I-81 Corridor Improvement Study 
in Virginia , Transportation Improvements from the Tennessee Border to 
the West Virginia Border, (Tier 1), Several Counties, VA and WV, 
Comment Period Ends: February 17, 2006, Contact: John Simkins 804-775-
3342.
EIS No. 20050511, Draft EIS, DOE, PA, Gilberton Coal-to-Clean Fuels and 
Power Project, Construction and Operation a New Demonstration Plant, 
Schuylkill County, PA, Comment Period Ends: February 8, 2006, Contact: 
Janice L. Bell 1-866-576-8240.
EIS No. 20050512, Final EIS, NPS, DC, Rock Creek Park and the Rock 
Creek and Potomac Parkway Project, General Management Plan, 
Implementation, Washington, DC, Wait Period Ends: January 9, 2006,

[[Page 73234]]

Contact: Patrick Gregerson 202-619-7277.
EIS No. 20050513, Final EIS, AFS, AR, Ozark-St. Francis National 
Forests Proposed Revised Land and Resource Management Plan, 
Implementation, Several Counties, AR, Wait Period Ends: January 9, 
2006, Contact: Gary Knudsen 479-964-7200.
EIS No. 20050514, Final EIS, NIH, ME, National Emerging Infectious 
Laboratories, Selected the Preferred Alternative, Construction of 
National Biocontainment Laboratory, BioSquare Research Park, Boston 
University Medical Center Campus, Boston, MA, Wait Period Ends: January 
9, 2006, Contact: Valerie Nottingham 301-496-7775.

Amended Notices

EIS No. 20050469, Draft EIS, NOA, 00, Programmatic--Towards an 
Ecosystem Approach for the Western Pacific Region: From Species Based 
Fishery Management Plans to Place-Based Fishery Ecosystem Plans, 
Realignment, Implementation, Western Pacific Region (America Samoa, 
Guam, Hawaii, Commonwealth of the Northern Mariana Islands), and U.S. 
Pacific Remote Island Areas, Comment Period Ends: December 27, 2005, 
Contact: William L. Robinson 808-944-2200.

    Revision of FR Notice Published November 10, 2005: Correction to 
Comment Period from December 26, 2005 to December 27, 2005. Also, this 
document is available on the Internet at: http://swr.nmfs.noaa.gov/pir.


    Dated: December 6, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E5-7120 Filed 12-8-05; 8:45 am]

BILLING CODE 6560-50-P