[Federal Register: March 7, 2005 (Volume 70, Number 43)]
[Notices]
[Page 11002-11004]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr07mr05-58]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EG05-47-000, et al.]
CER Termobahia, LLC, et al.; Electric Rate and Corporate Filings
February 28, 2005.
The following filings have been made with the Commission. The
filings are listed in ascending order within each docket
classification.
1. CER Termobahia, LLC
[Docket No. EG05-47-000]
Take notice that on February 24, 2005, CER Termobahia, LLC, a
Delaware limited liability company (Applicant), with its principal
executive office at 1930 Burnt Boat Drive, Bismarck, North Dakota,
58503, filed with the Federal Energy Regulatory Commission an
application for determination of exempt wholesale generator status
pursuant to part 365 of the Commission's regulations and section 32 of
the Public Utility Holding Company Act of 1935, as amended.
Applicant states it will own, in part, a 190 MW natural-gas fired,
combined-cycle electrical generating facility located in the State of
Bahia, near Salvador, Brazil (the facility). Applicant further states
that it will be engaged directly and exclusively in the business of
owning and operating an eligible facility and none of the electric
energy produced from the facility will be sold into the United States
either at retail or otherwise.
Comment Date: 5 p.m. Eastern Time on March 17, 2005.
2. Public Service Company of New Mexico
[Docket Nos. ER96-1551-011, ER01-615-008]
Take notice that on February 18, 2005, Public Service Company of
New Mexico (PNM) submitted a filing in response to the Commission's
December 20, 2004 order in the above-captioned proceedings. Public
Service Company of New Mexico, 109 FERC ] 61,296 (2004) (December 20
Order). PNM states that the purpose of its filing is to submit revised
market power analyses and information as required by the Commission in
the December 20 Order.
PNM states that copies of the filing were served on parties on the
official service lists in the above-captioned proceedings.
Comment Date: 5 p.m. Eastern Time on March 11, 2005.
3. Pinnacle West Capital Corporation, Arizona Public Service Company,
Pinnacle West Energy Corporation, APS Energy Services, Inc.
[Docket Nos. ER00-2268-010, EL05-10-000, ER99-4124-008, EL05-11-0000,
ER00-3312-009, EL05-12-000, ER99-4122-011, EL05-13-000]
Take notice that on February 18, 2005, the Pinnacle West Capital
Corporation (PWCC), the Arizona Public Service Company (APS), the
Pinnacle West Energy Corporation (PWEC) and APS Energy Services
Company, Inc. (APSES) (collectively, Pinnacle West Companies) filed
with the Commission a response to the Commission's Order dated December
20, 2004, directing Pinnacle West Companies to provide additional
information to the Commission to supplement its market update for
authorization to sell at market-based rates and various tariff
amendments filed on August 11, 2004.
Comment Date: 5 p.m. Eastern Time on March 11, 2005.
4. Frederickson Power L.P.; EPCOR Merchant and Capital (US) Inc.; EPCOR
Power Development, Inc.; EPDC, Inc.
[Docket Nos. ER01-2262-005, ER02-783-003, ER02-852-003, ER02-855-003]
Take notice that, on February 22, 2005, Frederickson Power L.P.,
EPCOR Merchant and Capital (US), Inc., EPCOR Power Development, Inc.,
and EPDC, Inc. (collectively, the EPCOR Parties) submitted a triennial
updated market-based rate analysis.
The EPCOR Parties state that copies of the filing were served on
parties on the official service lists in the above-referenced
proceedings.
Comment Date: 5 p.m. Eastern Standard Time March 15, 2005.
5. Midwest Independent Transmission System Operator, Inc.; Public
Utilities with Grandfathered Agreements in the Midwest ISO Region
[Docket Nos. ER04-691-027, EL04-104-026 ]
Take notice that on February 23, 2005, the Midwest Independent
Transmission System Operator, Inc. (Midwest ISO) submitted a compliance
filing pursuant to the Commission's January 24, 2005 Order in Midwest
Independent Transmission System Operator, Inc., et al., 110 FERC ]
61,049 (2005). The Midwest ISO has requested an April 1, 2005 effective
date for the tariff pages submitted in the compliance filing.
The Midwest ISO has requested waiver of the service requirements
set forth in 18 CFR 385.2010. The Midwest ISO states that it has
electronically served a copy of this filing, with attachments, upon all
Midwest ISO Members, Member representatives of Transmission Owners and
Non-Transmission Owners, the Midwest ISO Advisory Committee
participants, as well as all state commissions within the region. In
addition, Midwest states that the filing has been electronically posted
on the Midwest ISO's Web site at http://www.midwestiso.org under the
heading ``Filings to FERC'' for other interested parties in this
matter. The Midwest ISO will provide hard copies to any interested
parties upon request.
Comment Date: 5 p.m. Eastern Time on March 16, 2005.
6. New England Power Pool
[Docket No. ER04-1255-001]
Take notice that on February 18, 2005 ISO New England Inc. (the
ISO) and the New England Power Pool (NEPOOL) Participants Committee
submitted a compliance filing, including a report entitled The Costs
and Benefits of Implementing a Day-Ahead Load Response Program and
revisions to Appendix E to Section III of the ISO's Transmission,
Markets and Services Tariff (the Tariff), in response to the
requirements of the Commission's December 21, 2004 order in Docket No.
ER04-1255-000. NEPOOL and the ISO requested a June 1, 2005 effective
date for the revisions to the tariff.
The ISO and the NEPOOL Participants Committee state that copies of
the compliance filing were sent to the NEPOOL Participants and the New
England state governors and regulatory commissions, as well as all
parties on the official service lists in the above-captioned
proceeding.
Comment Date: 5 p.m. Eastern Time on March 11, 2005.
7. Unitil Energy Systems, Inc.
[Docket No. ER05-320-001]
Take notice that on February 23, 2005, Unitil Energy Systems, Inc.
(UES) submitted a compliance filing pursuant to the Commission's order
issued on February 2, 2005 in Docket No. ER05-320-000, Unitil Energy
Systems, Inc., 110 FERC ] 61,089 (2005).
[[Page 11003]]
UES states that copies of the filing were served on parties on the
official service list in the above-captioned proceeding and on the New
Hampshire Public Utility Commission.
Comment Date: 5 p.m. Eastern Time on March 16, 2005.
8. Hot Spring Power Company, LP
[Docket No. ER05-570-001]
Take notice that on February 23, 2005, Hot Spring Power Company, LP
(Hot Spring) filed a supplement to its application filed February 11,
2005 in Docket No. ER05-570-000 for authorization to make wholesale
sales of electric energy, capacity, and ancillary services at market-
based rates, to reassign transmission capacity, and to resell firm
transmission rights.
Comment Date: 5 p.m. Eastern Time on March 16, 2005.
9. Puget Sound Energy, Inc.
[Docket No. ER05-609-000]
Take notice that on February 18, 2005, Puget Sound Energy Inc.
(PSE) submitted revised tariff sheets to its open access transmission
tariff incorporating the changes directed by the Commission in Order
No. 2003-B, Standardization of Generator Interconnection Agreements and
Procedures, 109 FERC ] 61,287 (2004).
PSE states that electronic copies of the filing were served on the
Washington Utilities and Transportation Commission and PSE's
jurisdictional customers.
Comment Date: 5 p.m. Eastern Time on March 11, 2005.
10. PSI Energy, Inc.
[Docket No. ER05-634-000]
Take notice that on February 22, 2005, PSI Energy, Inc. (PSI)
tendered for filing the transmission and local facilities agreement for
calendar year 2003 reconciliation between PSI and Wabash Valley Power
Association, Inc., and between PSI and Indiana Municipal Power Agency,
designated as PSI's Rate Schedule FERC No. 253.
Comment Date: 5 p.m. Eastern Time on March 15, 2005.
11. American Electric Power Service Corporation
[Docket No. ER05-635-000]
Take notice that on February 22, 2005, the American Electric Power
Service Corporation (AEPSC), tendered for filing an Interconnection and
Local Delivery Service Agreement for Blue Ridge Power Association (Blue
Ridge), designated as Substitute Service Agreement No. 181, to the
Operating Companies of the American Electric Power System FERC Electric
Tariff Third Revised Volume No. 6. AEPSC requests an effective date of
February 1, 2005.
AEPSC states that a copy of the filing was served upon the Party
and the Virginia Public Service Commission.
Comment Date: 5 p.m. Eastern Time on March 15, 2005.
12. Midwest Independent Transmission System Operator, Inc.
[Docket No. ER05-636-000]
Take notice that on February 23, 2005, the Midwest Independent
Transmission System Operator, Inc. (Midwest ISO) submitted a Large
Generator Interconnection Agreement among Columbia Community Windpower
LLC, American Transmission Company LLC and the Midwest ISO.
Midwest ISO states that a copy of this filing was served on the
parties to this Interconnection Agreement.
Comment Date: 5 p.m. Eastern Time on March 16, 2005.
13. Wisconsin Public Service Corporation
[Docket No. ER05-637-000]
Take notice that on February 23, 2005, Wisconsin Public Service
Corporation (WPSC) tendered for filing, the actual 2004 values for
billing for post-employment benefits (PEB) and post-employment benefits
other than pensions (PBOP) in its formula rates for: (1) The W-1A
tariff for full requirements service; (2) the W-2A tariff for partial
requirements service; and (3) Rate Schedule No. 51 for partial
requirements service for the City of Marshfield. WPSC has also requests
waiver of the notice requirements to allow it to apply the 2004 PEB and
PBOP values to the true-up of these wholesale customers' estimated
capacity rate billings for service during 2004 and for estimated
billing as of April 1, 2005.
WPSC states that copies of the filing were served upon WPSC's
affected wholesale customers, the Public Service Commission of
Wisconsin and the Michigan Public Service Commission.
Comment Date: 5 p.m. Eastern Time on March 16, 2005.
14. Illinois Power Company
[Docket No. ER05-638-000]
Take notice that on February 23, 2005, Illinois Power Company
(Illinois Power) submitted a Market-Based Rate Tariff authorizing
AmerenIP to engage in the sale of electric energy, capacity and firm
rights at market-based rates and to reassign transmission capacity
rights at negotiated rates. Illinois Power requests an effective date
of the later of April 1, 2005, or the first day of the Midwest ISO's
Day 2 markets (currently expected to be April 1, 2005).
Comment Date: 5 p.m. Eastern Time on March 16, 2005.
15. Brascan Power Piney & Deep Creek LLC
[Docket No. ER05-639-000]
Take notice that on February 23, 2005, Brascan Power Piney & Deep
Creek LLC (Brascan Power PDC) submitted for filing an application for
market-based rate authorization to sell energy, capacity, and ancillary
services, and reassign transmission capacity and resell firm
transmission rights. Brascan Power PDC also requests the waivers and
exemptions from regulation typically granted to the holders of market-
based rate authorization. In addition, Brascan Power PDC requests
waiver of the 60-day prior notice requirement and requests expedited
consideration of its application for market-based rate authorization.
Comment Date: 5 p.m. Eastern Time on March 16, 2005.
16. Cinergy Services, Inc.
[Docket No. ER05-640-000]
Take notice that on February 23, 2005, Cinergy Services, Inc.
(Cinergy Services), on behalf of The Cincinnati Gas & Electric Company
(CG&E), PSI Energy, Inc. (PSI) and Cinergy Power Investments, Inc.
submitted for filing a revised Joint Generation Dispatch Agreement
between PSI and CG&E.
Cinergy Services states that copies of the filing were served upon
the Indiana Utility Regulatory Commission.
Comment Date: 5 p.m. Eastern Time on March 16, 2005.
Standard Paragraph
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Applicant and all parties to this proceeding.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at http://www.ferc.gov.
Persons unable to file electronically should submit an
original and 14 copies
[[Page 11004]]
of the protest or intervention to the Federal Energy Regulatory
Commission, 888 First Street, NE., Washington, DC 20426.
This filing is accessible on-line at http://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5-904 Filed 3-4-05; 8:45 am]
BILLING CODE 6717-01-P