[Federal Register: March 8, 2005 (Volume 70, Number 44)]
[Notices]
[Page 11231-11232]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr08mr05-75]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Exemption Application Accepted for Filing and
Soliciting Motions To Intervene and Protests
March 2, 2005.
Take notice that the following hydroelectric exemption application
has been filed with the Commission and is available for public
inspection.
a. Type of Application: Exemption of a Major Hydropower Project 5
MW or Less.
b. Project: West Valley A&B Hydro Project No. 12053-001.
c. Date Filed: July 18, 2003.
d. Applicant: Mr. Nicholas Josten.
e. Location: On the South Fork of the Pit River in Modoc County,
California. The project would be located on approximated 31 acres of
federal lands, managed by Forest Service and Bureau of Land Management.
f. Filed Pursuant to: Public Utility Regulatory Policies Act of
1978, 16 U.S.C. 2705, 2708.
g. Applicant Contact: Mr. Nicholas Josten, 2742 St Charles Ave,
Idaho Falls, ID 83404.
h. FERC Contact: Susan O'Brien, (202) 502-8449 or
susan.obrien@ferc.gov.
i. Deadline for filing motions to intervene and protests: May 2,
2005.
All documents (original and eight copies) should be filed with:
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
Motions to intervene and protests may be filed electronically via
the Internet in lieu of paper. The Commission strongly encourages
electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions
on the Commission's web site (http://www.ferc.gov) under the ``e-
Filing'' link.
j. This application has been accepted for filing, but is not ready
for environmental analysis at this time.
k. The proposed project would consist of two developments, West
Valley A and West Valley Alternative B-1. Alternative B-2 has been
deleted from the proposed project (applicant's response to
deficiencies, filed October 25, 2004).
West Valley A run-of river development would have a capacity of 1.0
MW and consists of: (1) An existing concrete diversion structure; (2)
an existing intake structure; (3) 11,600 feet of open canal; (4) a
proposed concrete overflow structure; (5) a proposed 2,800 feet of new
canal; (6) a proposed penstock; (7) a proposed powerhouse; (8) a
proposed tailrace pipe; (9) a proposed transmission line; and (10)
appurtenant facilities. The applicant estimates that the total average
annual generation would be 3,300,000 kWh.
West Valley Alternative B-1 run-of-river development would have a
capacity of 1.36 MW and consists of: (1) The existing West Valley Dam
and outlet works; (2) a new bypass valve attached to the existing dam
outlet pipe; (3) a proposed penstock; (4) a proposed powerhouse; (5) a
proposed tailrace canal; (6) a proposed transmission line; and (7)
appurtenant facilities. The applicant estimates that the total average
annual generation would be 4,730,000 kWh.
l. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at http://www.ferc.gov using the ``FERRIS'' link.
Enter the docket number excluding the last three digits in the docket
number field to access the document. For assistance, contact FERC
Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-
3676, or for TTY, (202) 502-8659. A copy is also available for
inspection and reproduction at the address in item g. above.
You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp
to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
m. Anyone may submit a protest or a motion to intervene in
accordance with the requirements of Rules of Practice and Procedure, 18
CFR 385.210, 385.211, and 385.214. In determining the appropriate
action to take, the Commission will consider all protests filed, but
only those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any protests
or motions to intervene must be received on or before the specified
deadline date for the particular application.
All filings must (1) bear in all capital letters the title
``PROTEST'' or ``MOTION TO INTERVENE;'' (2) set forth in the heading
the name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005.
Agencies may obtain copies of the application directly from the
applicant. A copy of any protest or motion to intervene must be served
upon each representative of the applicant specified in the particular
application.
n. Procedural Schedule: The application will be processed according
to the following Hydro Licensing Schedule. Revisions to the schedule
will be made as appropriate.
Issue Scoping Document: April 2005
Scoping Meetings and Site Visit: May 2005
Scoping Comments due: June 2005
Notice that application is ready for environmental analysis: June 2005
Notice of the availability of the EA: October 2005
[[Page 11232]]
Ready for Commission decision on the application: January 2006
Linda Mitry,
Deputy Secretary.
[FR Doc. E5-958 Filed 3-7-05; 8:45 am]
BILLING CODE 6717-01-P