[Federal Register: January 24, 2006 (Volume 71, Number 15)]
[Rules and Regulations]
[Page 3763-3764]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr24ja06-8]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[CGD05-06-004]
RIN 1625-AA-09
Drawbridge Operation Regulations; Elizabeth River, Eastern
Branch, VA
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, Fifth Coast Guard District, has approved a
temporary deviation from the regulations governing the operation of the
Berkley Bridge, at mile 0.4, across the Eastern Branch of the Elizabeth
River in Norfolk, Virginia. To facilitate electrical repairs, this
deviation allows the drawbridge to remain closed-to-navigation from 7
a.m. on February 7, 2006, to 7 a.m. on February 8, 2006 and from 7 a.m.
on February 14, 2006, to 7 a.m. on February 15, 2006.
DATES: This deviation is effective from 7 a.m. on February 7, 2006, to
7 a.m. on February 15, 2006.
FOR FURTHER INFORMATION CONTACT: Gary Heyer, Bridge Management
Specialist, Fifth Coast Guard District, at (757) 398-6629.
SUPPLEMENTARY INFORMATION: The Berkley Bridge, a lift-type drawbridge,
has a vertical clearance in the closed position to vessels of 48 feet,
at mean high water.
The bridge owner, the Virginia Department of Transportation, has
requested a temporary deviation from the current operating regulation
set out in 33 CFR 117.1007, to effect electrical repairs of the draw
span.
To facilitate the repairs, the drawbridge will be closed to
navigation from 7 a.m. on February 7, 2006, to 7 a.m. on February 8,
2006 and from 7 a.m. on February 14, 2006, to 7 a.m. on February 15,
2006. During these periods, the repairs require immobilizing the
operation of the lift span in the closed-to-navigation position. At all
other times, the drawbridge will operate in accordance with the current
operating regulations outlined in 33 CFR 117.1007.
The Coast Guard has informed the known users of the waterway so
that they can arrange their transits to minimize any impact caused by
the temporary deviation.
In accordance with 33 CFR 117.35(c), this work will be performed
with all due speed in order to return the bridge to
[[Page 3764]]
normal operation as soon as possible. This deviation from the operating
regulations is authorized under 33 CFR 117.35.
Dated: January 17, 2006.
Waverly W. Gregory, Jr.,
Chief, Bridge Administration Branch, Fifth Coast Guard District.
[FR Doc. 06-584 Filed 1-23-06; 8:45 am]
BILLING CODE 4910-15-P