[Federal Register: January 5, 2006 (Volume 71, Number 3)]
[Rules and Regulations]               
[Page 538-541]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr05ja06-3]                         

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 165

[COTP San Francisco Bay 05-011]
RIN 1625-AA00

 
Safety Zone; Mission Creek Waterway, China Basin, San Francisco 
Bay, CA

AGENCY: Coast Guard, DHS.

ACTION: Temporary final rule; request for comments.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has established a temporary safety zone in the 
navigable waters of the Mission Creek Waterway in China Basin 
surrounding the construction site of the Fourth Street Bridge, San 
Francisco, California. This temporary safety zone is necessary to 
protect persons and vessels from hazards associated with ongoing bridge 
construction activities scheduled to continue through September 1, 
2006. The safety zone temporarily prohibits use of the Mission Creek 
Waterway surrounding the Fourth Street Bridge, unless authorized by the 
Captain of the Port, or his designated representative.

DATES: This rule is effective from 12:01 a.m. on January 1, 2006 to 
11:59 p.m. on September 1, 2006. Comments and related material must 
reach the Coast Guard on or before March 1, 2006.

ADDRESSES: Comments and material received from the public, as well as 
documents indicated in this preamble as being available in the docket, 
are part of docket COTP 05-011 and are available for inspection or 
copying at the Waterways Safety Branch of Sector San Francisco, Coast 
Guard Island, Alameda, California, 94501, between 9 a.m. and 4 p.m., 
Monday through Friday, except Federal holidays.

FOR FURTHER INFORMATION CONTACT: Lieutenant Eric Ramos, U.S. Coast 
Guard Sector San Francisco, at (510) 437-2770.

SUPPLEMENTARY INFORMATION:

Regulatory Information

    We did not publish a notice of proposed rulemaking (NPRM) for this 
regulation. Under 5 U.S.C. 553(b)(3)(B),

[[Page 539]]

the Coast Guard finds that good cause exists for not publishing an 
NPRM. A delay in the effective date of this rule would expose mariners 
to undue hazards associated with bridge construction operations. For 
the same reason, under 5 U.S.C. 553(d)(3), the Coast Guard finds that 
good cause exists for making this rule effective less than 30 days 
after publication in the Federal Register. Although the Coast Guard has 
good cause to issue this effective temporary rule without first 
publishing a proposed rule, you are invited to submit comments and 
related material regarding this rule on or before March 1, 2006. We may 
change the temporary final rule based on your comments.

Background and Purpose

    The San Francisco Department of Public Works requested a temporary 
closure of the Mission Creek waterway for the purpose of performing 
significant work to the Fourth Street Bridge. The Fourth Street Bridge 
was erected across the Mission Creek Waterway at the China Basin in 
1917, and was determined eligible for listing in the National Register 
of Historic Places in 1985 as part of the California Department of 
Transportation (Caltrans) Historic Bridge Inventory. Caltrans, Division 
of Structures, evaluated the Fourth Street Bridge and recommended that 
the bridge be brought up to current seismic safety standards. The three 
objectives of the rehabilitation project are to: (i) Seismically 
retrofit the structure while not significantly altering the historical 
appearance of the bridge; (ii) repair the damage to the concrete 
approaches and several steel and concrete members of the movable span, 
and (iii) reinitiate light rail service across the bridge. The Federal 
Highway Administration, the State of California and the City of San 
Francisco are funding the Fourth Street Bridge Retrofit Project.
    The first phase of this project included the removal of the lift 
span, and took place between May 1 and July 28, 2003. During that 
period, the channel was closed at the Fourth Street Bridge to boating 
traffic by a temporary final rule that was published in the Federal 
Register on May 13, 2003 (68 FR 25500) and a subsequent change in 
effective period temporary final rule that was published on July 9, 
2003 (68 FR 40772). Those two rules established a safety zone that 
extended 100 yards on either side of the Fourth Street Bridge. The 
second phase of the construction project included rebuilding the north 
and south approaches and the new counterweight and its enclosing pit; 
but did not require that the waterway be closed to boating traffic. A 
temporary final rule was published in the Federal Register on the March 
31, 2005 (70 FR 16413) which established a safety zone that extended 
100 yards on either side of the Fourth Street Bridge during the final 
phase of construction. However, the final phase has been extended due 
to construction delays.
    The safety zone established in this particular rule is for the 
final stages of construction, which includes replacing the lift span 
and aligning the bridge to accept the light rail track system. Due to 
unforeseen conditions which have delayed the complicated installation 
of the bridge counterweights, mechanical and electrical systems, 
miscellaneous connections and adjustments, and the completion of the 
final balancing and alignment of the bridge to accept the light rail 
tracks system, the completion date has been extended to September 1, 
2006. A safety zone of 100 yards on either side of the Fourth Street 
Bridge is needed during this period to protect boating traffic public 
from the dangers posed by the construction operations and to allow the 
construction operations to be completed.
    There are two major environmental issues that affect the scheduling 
of construction in the channel, namely the annual pacific herring 
spawning season that runs from December 1 to March 31, and noise 
constraints for steelhead from December 1 to June 1. Any demolition, 
pile driving and excavation in the water during those time periods will 
be monitored and restricted for possible impacts on these species.
    The Fourth Street Bridge Project is related to the larger Third 
Street Light Rail Project, and many public presentations on the 
project's components, channel closure schedules, impacts to surrounding 
uses and project duration have been made by the City and Port of San 
Francisco. The Third Street Light Rail Advisory Group was created as a 
forum to keep the public informed on the progress being made on the 
Third Street Light Rail Project. Also, this project has been presented 
at many Mission Bay Citizen Advisory Committee meetings. At these 
meetings, the public was notified of the project components, impacts 
and the need to temporarily close the waterway. Specific to the Fourth 
Street Bridge project, an Environmental Assessment, required by the 
Federal Highway Administration and Caltrans, (under the National 
Environmental Protection Act) was conducted by the City of San 
Francisco. A public hearing regarding the Environmental Assessment was 
held on January 17, 2002 at San Francisco Arts College, Timken Lecture 
Hall, 1111 8th Street in San Francisco California, and was well 
attended.
    In addition, the City of San Francisco advised the Coast Guard 
Captain of the Port in January of 2003 that two channel closures would 
be necessary in order to accomplish the Fourth Street Bridge project. 
The Coast Guard met with various City and Port officials to ensure that 
there would be minimal impacts on area boaters and other involved 
entities.

Discussion of the Rule

    The Coast Guard has established a safety zone that consists of a 
portion of the navigable waters located at the Fourth Street Bridge in 
the Mission Creek Waterway in China Basin, San Francisco, California. 
This safety zone is to affect a waterway closure during periods of 
reconstruction of the Fourth Street Bridge and would be effective 24 
hours a day between January 1, 2006 and September 1, 2006.
    This safety zone is necessary to protect persons and vessels from 
hazards, injury and damage associated with bridge construction 
activities. No vessel or person may come within 100 yards of either 
side of the bridge, or pass beneath the bridge during construction.
    This safety zone encompasses the navigable waters, from the surface 
to the bottom, within two lines; one line drawn from a point on the 
north shore of Mission Creek extending southeast to a point on the 
opposite shore, 100 yards west of the bridge, and the other line drawn 
from a point on the north shore of Mission Creek extending southeast to 
a point on the opposite shore, 100 yards east of the bridge.
    Vessels and people may be allowed to enter an established safety 
zone on a case-by-case basis with authorization from the Captain of the 
Port or a designated representative thereof. Section 165.23 of Title 
33, Code of Federal Regulations, prohibits any unauthorized person or 
vessel from entering or remaining in this safety zone.
    Coast Guard personnel will enforce this regulation and the Captain 
of the Port may be assisted by other Federal, State, or local agencies 
in the patrol and enforcement of the regulation.

Regulatory Evaluation

    This rule is not a ``significant regulatory action'' under section 
3(f) of Executive Order 12866, Regulatory Planning and Review, and does 
not require an assessment of potential costs and benefits under section 
6(a)(3) of that Order. The Office of Management and Budget has not 
reviewed it under that Order. It is not ``significant'' under the 
regulatory policies and procedures of

[[Page 540]]

the Department of Homeland Security (DHS).
    Although this rule restricts access to the waters encompassed by 
the safety zone, the effect of this rule is not significant because: 
(i) Owners of boats located within Mission Creek have been advised of 
the planned waterway closures at several Mission Bay Citizen Advisory 
Committee meetings, (ii) the San Francisco Department of Public Works 
and the Port of San Francisco have consulted with the Mission Creek 
Harbor Association to address the impacts of temporarily closing the 
channel to local boaters, (iii) the Department of Public works has made 
arrangements to accommodate the requests of owners that have asked to 
temporarily moor their house boats or pleasure boats at the head of the 
channel, (iv) the channel closure will not impact land access to the 
houseboats west of the bridge during the waterway closure and (v) the 
zone is not permanent.
    The size of the zone is the minimum necessary to provide adequate 
protection for the boating public and an adequate distance to ensure 
vessel wakes to not interfere with construction operations. The 
entities most likely to be affected are pleasure craft engaged in 
recreational activities and sightseeing.

Small Entities

    Under the Regulatory Flexibility Act (5 U.S.C. 601-612), we have 
considered whether this rule would have a significant economic impact 
on a substantial number of small entities. The term ``small entities'' 
comprises small businesses, not-for-profit organizations that are 
independently owned and operated and are not dominant in their fields, 
and governmental jurisdictions with populations of less than 50,000.
    The Coast Guard certifies under 5 U.S.C. 605(b) that this rule will 
not have a significant economic impact on a substantial number of small 
entities. The effect of this rule on small entities is not expected to 
be significant because: (i) Owners of boats located within Mission 
Creek have been advised of the planned waterway closures at several 
Mission Bay Citizen Advisory Committee meetings, (ii) the San Francisco 
Department of Public Works and the Port of San Francisco have consulted 
with the Mission Creek Harbor Association to address the impacts of 
temporarily closing the channel to local boaters, (iii) the Department 
of Public works has made arrangements to accommodate the requests of 
owners that have asked to temporarily moor their house boats or 
pleasure boats at the head of the channel, (iv) the channel closure 
will not impact land access to the houseboats west of the bridge during 
the waterway closure and (v) the zone is not permanent. However, a 
small number of sailboats that moor in the harbor may be impacted. 
Small entities and the maritime public will be advised of this safety 
zone via public notice to mariners.

Assistance for Small Entities

    Under section 213(a) of the Small Business Regulatory Enforcement 
Fairness Act of 1996 (Pub. L. 104-121), we offered to assist small 
entities in understanding the rule so that they could better evaluate 
its effects on them and participate in the rulemaking process. If the 
rule will affect your small business, organization, or government 
jurisdiction and you have questions concerning its provisions or 
options for compliance, please contact the person listed under FOR 
FURTHER INFORMATION CONTACT for assistance in understanding this rule.
    Small businesses may send comments on the actions of Federal 
employees who enforce, or otherwise determine compliance with, Federal 
Regulations to the Small Business and Agriculture Regulatory 
Enforcement Ombudsman and the Regional Small Business Regulatory 
Fairness Boards. The Ombudsman evaluates these actions annually and 
rates each agency's responsiveness to small business. If you wish to 
comment on actions by employees of the Cast Guard, call 1-800-REG-FAIR 
(1-888-734-3247).

Collection of Information

    This rule calls for no new collection of information under the 
Paperwork Reduction Act of 1995 (44 U.S.C. 3501-3520).

Federalism

    A rule has implications for federalism under Executive Order 13132, 
Federalism, if it has a substantial direct effect on State or local 
governments and would either preempt State law or impose a substantial 
direct cost of compliance on them. We have analyzed this rule under 
that Order and have determined that it does not have implications for 
federalism.

Unfunded Mandates Reform Act

    The Unfunded Mandates Reform Act of 1995 (2 U.S.C. 1531-1538) 
requires Federal agencies to assess the effects of their discretionary 
regulatory actions. In particular, the Act addresses actions that may 
result in the expenditure by a State, local, or tribal government, in 
the aggregate, or by the private sector of $100,000,000 or more in any 
one year. Though this rule does not result in such expenditure, we do 
discuss the effects of this rule elsewhere in this preamble.

Taking of Private Property

    This rule does not affect a taking of private property or otherwise 
have taking implications under Executive Order 12630, Governmental 
Actions and Interference with Constitutionally Protected Property 
Rights.

Civil Justice Reform

    This rule meets applicable standards in sections 3(a) and 3(b)(2) 
of Executive Order 12988, Civil Justice Reform, to minimize litigation, 
eliminate ambiguity, and reduce burden.

Protection of Children

    We have analyzed this rule under Executive Order 13045, Protection 
of Children from Environmental Health Risks and Safety Risks. This rule 
is not an economically significant rule and does not create an 
environmental risk to health or risk to safety that might 
disproportionately affect children.

Indian Tribal Governments

    This rule does not have tribal implications under Executive Order 
13175, Consultation and Coordination with Indian Tribal Governments, 
because it does not have a substantial direct effect on one or more 
Indian tribes, on the relationship between the Federal Government and 
Indian tribes, or on the distribution of power and responsibilities 
between the Federal Government and Indian tribes.

Energy Effects

    We have analyzed this rule under Executive Order 13211, Actions 
Concerning Regulations That Significantly Affect Energy Supply, 
Distribution, or Use. We have determined that it is not a ``significant 
energy action'' under that order because it is not a ``significant 
regulatory action'' under Executive Order 12866 and is not likely to 
have a significant adverse effect on the supply, distribution, or use 
of energy. The Administrator of the Office of Information and 
Regulatory Affairs has not designated it as a significant energy 
action. Therefore, it does not require a Statement of Energy Effects 
under Executive Order 13211.

Technical Standards

    The National Technology Transfer and Advancement Act (NTTAA) (15 
U.S.C. 272 note) directs agencies to use voluntary consensus standards 
in their regulatory activities unless the agency

[[Page 541]]

provides Congress, through the Office of Management and Budget, with an 
explanation of why using these standards would be inconsistent with 
applicable law or otherwise impractical. Voluntary consensus standards 
are technical standards (e.g., specifications of materials, 
performance, design, or operation; test methods; sampling procedures; 
and related management systems practices) that are developed or adopted 
by voluntary consensus standards bodies.
    This rule does not use technical standards. Therefore, we did not 
consider the use of voluntary consensus standards.

Environment

    We have analyzed this rule under Commandant Instruction M16475.1D, 
which guides the Coast Guard in complying with the National 
Environmental Policy Act of 1969 (NEPA)(42 U.S.C. 4321-4370f), and have 
concluded that there are no factors in this case that would limit the 
use of a categorical exclusion under section 2.B.2 of the Instruction. 
Therefore, this rule is categorically excluded, under figure 2-1, 
paragraph (34)(g), of the Instruction, from further environmental 
documentation because it establishes a safety zone.
    A draft ``Environmental Analysis Check List'' and a draft 
``Categorical Exclusion Determination'' (CED) will be available in the 
docket where indicated under ADDRESSES.

List of Subjects in 33 CFR Part 165

    Harbors, Marine safety, Navigation (water), Reporting and 
recordkeeping requirements, Security measures, Waterways.


0
For the reasons discussed in the preamble, the Coast Guard amends 33 
CFR part 165 as follows:

PART 165--REGULATED NAVIGATION AREAS AND LIMITED ACCESS AREAS

0
1. The authority citation for part 165 continues to read as follows:

    Authority: 33 U.S.C. 1226, 1231; 46 U.S.C. Chapter 701; 50 
U.S.C. 191, 195; 33 CFR 1.05-1(g), 6.04-1, 6.04-6, and 160.5; Pub. 
L. 107-295, 116 Stat. 2064; Department of Homeland Security 
Delegation No. 0170.1.

0
2. Add Sec.  165.T11-056 to read as follows:


Sec.  165.T11-056  Safety Zone; Mission Creek Waterway, China Basin, 
San Francisco Bay, California.

    (a) Location. One hundred yards to either water-side of the Fourth 
Street Bridge, encompassing the navigable waters, from the surface to 
the sea floor, bounded by two lines; one line drawn from a point on the 
north shore of Mission Creek [37[deg]46[min]29[sec] N, 
122[deg]23[min]36[sec] W] extending southeast to a point on the 
opposite shore [37[deg]46[min]28[sec] N, 122[deg]23[min]34[sec] W], and 
the other line drawn from a point on the north shore of Mission Creek 
[37[deg]46[min]34[sec] N, 122[deg]23[min]30[sec] W] extending southeast 
to a point on the opposite shore [37[deg]46[min]33[sec] N, 
122[deg]23[min]28] [Datum: NAD 83].
    (b) Regulations. In accordance with the general regulations in 
Sec.  165.23, entry into, transit through, or anchoring within this 
zone by all vessels is prohibited, unless specifically authorized by 
the Captain of the Port San Francisco, or his designated 
representative.
    (c) Effective period. The safety zone will be in effect from 12:01 
a.m. on January 1, 2006, to 11:59 p.m. on September 1, 2006. If the 
need for this safety zone ends before the scheduled termination time, 
the Captain of the Port will cease enforcement of the safety zone and 
will announce that fact via Broadcast Notice to Mariners.
    (d) Enforcement. The Captain of the Port will enforce this zone and 
may enlist the aid and cooperation of any Federal, State, county, or 
municipal agency to assist in the enforcement of the regulation. All 
persons and vessels shall comply with the instructions of the Coast 
Guard Captain of the Port, or the designated on-scene patrol personnel. 
Patrol personnel comprise commissioned, warrant, and petty officers of 
the Coast Guard onboard Coast Guard, Coast Guard Auxiliary, federal, 
state, and local law enforcement vessels. Upon being hailed by U.S. 
Coast Guard patrol personnel by siren, radio, flashing light, or other 
means, the operator of a vessel shall proceed as directed.

    Dated: December 21, 2005.
William J. Uberti,
Captain, U.S. Coast Guard, Captain of the Port, San Francisco, 
California.
[FR Doc. 06-83 Filed 1-4-06; 8:45 am]

BILLING CODE 4910-15-P