[Federal Register: September 7, 2006 (Volume 71, Number 173)]
[Rules and Regulations]
[Page 52743-52744]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr07se06-7]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[CGD01-06-111]
Drawbridge Operation Regulations; Housatonic River, Stratford, CT
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, First Coast Guard District, has issued a
temporary deviation from the regulation governing the operation of the
U.S. 1 Bridge, across the Housatonic River, mile 3.5, at Stratford,
Connecticut. Under this temporary deviation, only one of the two
moveable bascule spans will be opened for the passage of vessel
traffic. This deviation is necessary to facilitate scheduled bridge
maintenance.
DATES: This deviation is effective from September 18, 2006 through
November 16, 2006.
ADDRESSES: Materials referred to in this document are available for
inspection or copying at the First Coast Guard District, Bridge Branch
Office, One South Street, New York, New York 10004, between 7 a.m. and
3 p.m., Monday through Friday, except Federal holidays. The First Coast
Guard District Bridge Branch Office maintains the public docket for
this temporary deviation.
FOR FURTHER INFORMATION CONTACT: Judy Leung-Yee, Project Officer, First
Coast Guard District, at (212) 668-7165.
SUPPLEMENTARY INFORMATION: The U.S. 1 Bridge across the Housatonic
River, mile 3.5, at Stratford, Connecticut, has a vertical clearance in
the closed position of 32 feet at mean high water and 37 feet at mean
low water. The existing operating regulations are listed at 33 CFR
117.207(a).
The bridge owner, Connecticut Department of Transportation,
requested a temporary deviation to allow opening only one of the two
moveable bascule spans for the passage of vessel traffic from September
18, 2006 through November 16, 2006, in order to facilitate scheduled
bridge maintenance.
Under this temporary deviation, the U.S. 1 Bridge need only open
one of the two movable bascule spans for the passage of vessel traffic
from September 18, 2006 through November 16, 2006. Two-span, full
bridge, openings shall be provided upon request, if at least a three-
day advance notice is given, by calling the number posted at the
bridge. Otherwise, the bridge will continue to open during this
temporary deviation in accordance with the schedule specified in 33 CFR
117.207(a).
In accordance with 33 CFR 117.35(c), this work will be performed
with all due speed in order to return the bridge to normal operation as
soon as possible.
Should the bridge maintenance authorized by this temporary
deviation be completed before the end of the effective period published
in this notice, the Coast Guard will rescind the remainder of this
temporary deviation, the bridge shall be returned to its normal
operating schedule, and notice will be provided to the public.
[[Page 52744]]
This deviation from the operating regulations is authorized under
33 CFR 117.35.
Dated: August 28, 2006.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. E6-14834 Filed 9-6-06; 8:45 am]
BILLING CODE 4910-15-P