[Federal Register: August 17, 2007 (Volume 72, Number 159)]
[Notices]
[Page 46217-46218]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr17au07-59]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6689-9]
Environmental Impacts Statements; Notice of Availability.
Responsible Agency: Office of Federal Activities, General
Information, (202) 564-7167 or http://www.epa.gov/
[[Page 46218]]
compliance/nepa/. Weekly receipt of Environmental Impact Statements
Filed 08/06/2007 Through 08/10/2007. Pursuant to 40 CFR 1506.9.
EIS No. 20070345, Final EIS, BLM, OR, North Steens Ecosystem
Restoration Project, To Reduce Juniper-Related Fuels and Restore
Various Plant Communities, Implementation, Andrews Resource Area,
Cooperative Management and Protection Area (CMPA), Harney County, OR.
Wait Period Ends: 09/17/2007. Contact: Douglas Linn, 541-573-4543.
EIS No. 20070346, Draft Supplement, AFS, CA, Brown Project, Revised
Proposal to Improve Forest Health by Reducing Overcrowded Forest Stand
Conditions, Trinity River Management Unit, Shasta-Trinity National
Forest, Weaverville Ranger District, Trinity County, CA. Comment Period
Ends: 10/01/2007. Contact: J. Sharon Heywood, 530-226-2500.
EIS No. 20070347, Final EIS, FRC, TX, Calhoun Point Comfort Liquefied
Natural Gas (LNG) Project, (Docket Nos. CP05-91-000 and CP06-380-00)
Construction of New Pipeline on 73 acres, Port of Port Lavaca, Calhoun
and Jackson Counties, TX. Wait Period Ends: 09/17/2007. Contact: Andy
Black, 1-866-208-3372.
EIS No. 20070348, Final EIS, NPS, NM, Bandelier National Monument,
Ecological Restoration Plan, Reestablish Healthy, Sustainable
Vegetative Conditions within the Pinon-Juniper Woodland, Los Alamos and
Sandoval Counties, NM. Wait Period Ends: 09/17/2007. Contact: John
Mack, 505-672-3861 Ext. 540.
EIS No. 20070349, Draft EIS, NAS, 00, PROGRAMMATIC--Constellation
Program, Develop the Flight Systems and Earth-based Ground
Infrastructure for Future Missions, International Space Station, The
Moon, Mars, and Beyond, Brevard and Volusia Counties, FL; Hancock
County, MS; Orleans Parish, LA; Harris County, TX; Madison County, AL;
Cuyahoga and Erie Counties, OH; Hampton, VA; Santa Clara County, CA;
Dona Ana and Otero Counties, NM; and Box Elder and Davis Counties, UT.
Comment Period Ends: 10/01/2007. Contact: Kathleen Callister, 202-358-
1953.
EIS No. 20070350, Final EIS, NPS, PA, Valley Forge National Historical
Park, General Management Plan, Implementation, King of Prussia, PA.
Wait Period Ends: 09/17/2007. Contact: Deirdre Gibson, 610-783-1047.
EIS No. 20070351, Draft EIS, NSP, 00, PROGRAMMATIC--Integrated Ocean
Drilling Program-United States Implementing Organizations Participation
in the Development of Scientific Ocean Drilling, IODP-USIO, Comment
Period Ends: 10/01/2007. Contact: James Allan, 703-292-8144.
EIS No. 20070352, Final EIS, AFS, WY, Thunder Basin Analysis Area
Vegetation Management, To Implement Best Management Grazing Practices
and Activities, Douglas Ranger District, Medicine Bow-Routt National
Forests and Thunder Basin National Grassland, Campbell, Converse, and
Weston Counties, WY. Wait Period Ends: 09/17/2007. Contact: Kyle
Schmit, 307-358-4960.
EIS No. 20070353, Final EIS, NOA, 00, Atlantic Large Whale Take
Reduction Plan, Proposed Amendments to Implement Specific Gear
Modifications for Trap/Pot and Gillnet Fisheries, Broad-Based Gear
Modifications, Exclusive Economic Zone (EEZ), ME, CT and RI. Wait
Period Ends: 09/17/2007. Contact: Diane Borggaard, 978-281-9300 Ext.
6503.
EIS No. 20070354, Final EIS, AFS, CO, Deer Creek Shaft and E Seam
Methane Drainage Wells Project, Construct, Operate and Reclaim up to
137 Methane Drainage Well, Federal Coal lease, Paonia Ranger District,
Grand Mesa, Uncompahgre and Gunnison National Forests, Delta and
Gunnison Counties, CO. Wait Period Ends: 09/17/2007. Contact: Niccole
Mortenson, 970-874-6616.
EIS No. 20070355, Final EIS, FRC, 00, Southeast Supply Header Project,
Construction and Operation of Natural Gas Pipeline Facilities, Located
in various Counties and Parishes in LA, MS and AL. Wait Period Ends:
09/17/2007. Contact: Andy Black, 1-866-208-3372.
EIS No. 20070356, Draft EIS, FRC, CO, High Plains Expansion Project,
(Docket No. CP07-207-000) Natural Gas Pipeline Facility, Construction
and Operation, U.S. Army COE 404, Weld, Adams, and Morgan Counties, CO.
Comment Period Ends: 10/01/2007. Contact: Andy Black, 1-866-208-3322.
Amended Notices
EIS No. 20070209, Draft EIS, FHW, NY, Long Island Truck-Rail Intermodal
(LITRIM) Facility, Construction and Operation, Right-of-Way
Acquisition, Town of Islip, Suffolk County, NY. Comment Period Ends:
09/24/2007. Contact: Robert Arnold, 518-431-4127. Revision of FR Notice
Published 06/01/2007: Extending Comment Period from 7/25/2007 to 09/24/
2007.
EIS No. 20070278, Draft EIS, FHW, CA, Tier 1--Placer Parkway Corridor
Preservation Project, Select and Preserve a Corridor for the Future
Construction from CA-70/99 to CA 65, Placer and Sutter Counties, CA.
Comment Period Ends: 09/10/2007. Contact: Cesar Perez, 916-498-5065.
Revision of FR Notice Published 07/06/2007: Extending Comment Period
from 08/20/2007 to 09/10/2007.
Dated: August 14, 2007.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities.
[FR Doc. E7-16257 Filed 8-16-07; 8:45 am]
BILLING CODE 6560-50-P