[Federal Register: October 15, 2007 (Volume 72, Number 198)]
[Rules and Regulations]
[Page 58250-58251]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr15oc07-4]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[CGD08-07-025]
Drawbridge Operation Regulations; Charenton Drainage and
Navigation Canal, Baldwin, LA
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, Eighth Coast Guard District, has issued a
temporary deviation from the regulation governing the operation of the
BNSF Railway Company Swing Bridge across the Charenton Drainage and
Navigational Canal, mile 0.4, at Baldwin, St. Mary Parish, LA. This
deviation provides for the bridge to remain closed to navigation for 5
days with three hour openings each day to conduct maintenance repairs
to the drawbridge.
DATES: This deviation is effective from 8 a.m. on October 22, 2007
through 8 p.m. on October 26, 2007.
ADDRESSES: Materials referred to in this document are available for
inspection or copying at the office of the Eighth Coast Guard District,
Bridge Administration Branch, Hale Boggs Federal Building, Room 1313,
500 Poydras Street, New Orleans, Louisiana 70130-3310 between 7 a.m.
and 3 p.m., Monday through Friday, except Federal holidays. The
telephone number is (504) 671-2128. The Bridge Administration Branch
maintains the public docket for this temporary deviation.
FOR FURTHER INFORMATION CONTACT: Bart Marcules, Bridge Administration
Branch, telephone (504) 671-2128.
SUPPLEMENTARY INFORMATION: The BNSF Railway Company has requested a
temporary deviation in order to replace or repair a bent shaft,
bearings, and housing that are integral to the safe operation of the
swing bridge across the Charenton Drainage and Navigational Canal, mile
0.4, at Baldwin, St. Mary Parish, LA. This bridge opens on signal
[[Page 58251]]
in accordance with 33 CFR 117.5, but this temporary deviation will
allow the bridge to remain in the closed-to-navigation position from 8
a.m. on October 22, 2007 through 8 p.m. on October 26, 2007. BNSF will
provide an opening from 8 a.m. till 11 a.m. every day starting October
23, 2007. An alternate route is available through the Berwick Locks.
The bridge provides 10 feet of vertical clearance in the closed-to-
navigation position. Navigation on the waterway consists of tugs with
tows, fishing vessels and recreational craft including sailboats and
powerboats. Due to prior experience, as well as coordination with
waterway users, and an alternate route through Berwick Locks it has
been determined that this closure will not have a significant effect on
these vessels.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: October 2, 2007.
David M. Frank,
Bridge Administrator.
[FR Doc. E7-20207 Filed 10-12-07; 8:45 am]
BILLING CODE 4910-15-P