[Federal Register: February 9, 2007 (Volume 72, Number 27)]
[Notices]
[Page 6237-6238]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr09fe07-44]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6683-8]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 01/29/2007 through 02/02/2007
Pursuant to 40 CFR 1506.9.
EIS No. 20070027, final EIS, FRC, CA, Lake Elsinore Advanced Pumped
Storage (LEAPS) Project, Construction and Operation, Application for
Hydroelectric License, Special-Use-Permit, FERC No. 11858, City of Lake
Elsinore, Riverside County, CA, Wait Period Ends: 03/12/2007, Contact:
Andy Black 1-866-208-3372
EIS No. 20070028, draft EIS, COE, CA, PROGRAMMATIC--Los Angeles River
Revitalization Master Plan (LARRMP) Project, Implementation, Improving
Natural Habitat, Water Quality, Recreation, Economic Values and Open
Space, Owensmoth Avenue in Canoga Park (at the Confluence of Bell Creek
and Arroyo Calabasas) and continues down stream to Washington Boulevard
near the northern boundary of the City of Vernon, City of Los Angeles,
Los Angeles County, CA, Comment Period Ends: 03/26/2007, Contact:
Catherine Shuman 213-452-3797
EIS No. 20070029, final EIS, GSA, ME, Madawaska Border Station Project,
Replacement of Existing Border Station in Madawaska, Selected the Build
Alternative, International Border between United States and Canada,
Aroostook County, ME, Wait Period Ends: 03/12/2007, Contact: David M.
Drevinsky 617-565-6596
EIS No. 20070030, draft EIS, IBR, ND, Red River Valley Water Supply
Project, Development and Delivery of a Bulk Water Supply to meet Long-
Term Water Needs of the RedRiver Valley, Implementation, ND and MN,
Comment Period Ends: 03/26/2007, Contact: Signe Snortland 701-250-4242
Ext 3619
EIS No. 20070031, final EIS, AFS, CA, Lake Davis Pike Eradication
Project,
[[Page 6238]]
To Eradicate Pike and Re-Establish Trout Fishery in the Tributaries,
Special-Use-Permit, Plumas National Forest, Plumas County, CA, Wait
Period Ends: 03/12/2007, Contact: Angela Dillingham 530-283-7761
EIS No. 20070032, final EIS, AFS, CA, Commercial Pack Station and Pack
Stock Outfitter/ Guide Permit Issuance, Implementation, Special-Use-
Permit to Twelve PackStation and Two Outfitter/Guides, Inyo National
Forest, CA, Wait Period Ends: 03/12/2007 Contact: Erin Lutrick 760-873-
2545
EIS No. 20070033, draft EIS, FTA, 00, Access to the Region's Core
Project, To Increase Trans-Hudson Commuter Rail Capacity, Improve
System Safety and Reliability between Secaucus Junction Station in NJ
and midtown Manhattan, Funding, Hudson County, NJ and New York County,
NY, Comment Period Ends: 04/10/2007, Contact: James Goveia 212-668-2170
EIS No. 20070034, final EIS, SFW, WY, Bison and Elk Management Plan,
Implementation, National Elk Refuge/Grand Teton National Park/John D.
Rockefeller, Jr. Memorial Parkway, Teton County, WY, Wait Period Ends:
03/12/2007, Contact: Laurie Shannon 303-236-4317
EIS No. 20070035, final EIS, RUS, MT, Highwood Generating Station, 250-
megawatt Coal Fired Power Plant and 6MW of Wind Generation at a Site
near Great Falls,Construction and Operation, Licenses Permit, U.S. Army
COE Section 10 Permit, Cascade County, MT, Wait Period Ends: 03/12/
2007, Contact: Richard Fristik 202-720-5093
EIS No. 20070036, final EIS, AFS, NV, Heavenly Mountain Resort Master
Plan Amendment 2005 (MPA 05), Improve and Enhance the Resorts Over
Winter and SummerRecreation Opportunities, Special-Use-Permit, Lake
Tahoe Basin, El Dorado County, CA and Douglas County, NV, Wait Period
Ends: 03/12/2007, Contact: Matt Dickerson 530-543-2769
EIS No. 20070037, final EIS, FHW, MT, U.S. Highway 89, Improvements,
from Browning to Hudson Bay Divide, Endangered Species Act, NPDES
Permit and U.S. Army COESection 404 Permit, Glacier County, MT, Wait
Period Ends: 03/12/2007, Contact: Bob Seliskar 406-449-5302 Ext 244
Dated: February 6, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E7-2184 Filed 2-8-07; 8:45 am]
BILLING CODE 6560-50-P