[Federal Register: November 9, 2007 (Volume 72, Number 217)]
[Notices]
[Page 63579-63580]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr09no07-64]
[[Page 63579]]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6692-7]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/
Weekly receipt of Environmental Impact Statements
Filed 10/29/2007 Through 11/02/2007
Pursuant to 40 CFR 1506.9.
EIS No. 20070464, Final EIS, FHW, VA, Harrisonburg Southeast Connector
Location Study, Transportation Improvements from U.S. Route 11 to U.S.
Route 33, Funding and US Army COE Section 404 Permit, City of
Harrisonburg, Rockingham County, VA, Wait Period Ends: 12/10/2007,
Contact: John Simkins 804-775-3342.
EIS No. 20070465, Final EIS, FRA, CA, Los Angeles to San Diego (LOSSAN)
Rail Corridor, Proposed Rail Corridor Improvement Studies, Increase of
Intercity Travel for Faster, Safer, and Reliable Passenger Rail System,
Los Angeles, Orange and San Diego Counties, CA, Wait Period Ends: 12/
10/2007, Contact: Richard Dial 202-493-6368.
EIS No. 20070466, Final EIS, FHW, WI, TIER 1-FEIS--United States
Highway 8 Project, Construction from Wis 35 (N) to USH 53, Selected the
Preferred Segment Alternative, Funding and Right-of-Way Permit, Polk
and Barron Counties, WI, Wait Period Ends: 12/10/2007, Contact: Peter
M. Garcia 608-829-7513.
EIS No. 20070467, Final EIS, BLM, NM, Special Status Species Resource
Management Plan Amendment, Managing Public Land and Federal Minerals in
Portions of Chaves, Eddy, Lea and Roosevelt Counties, NM, Wait Period
Ends: 12/10/2007, Contact: Howard Parman 505-627-0212.
EIS No. 20070468, Final Supplement, SFW, CA, Coachella Valley, Revision
to the Multiple Species Habitat Conservation Plan (MSHCP), Natural
Community Conservation Plan, Santa Rosa and San Jacinto Mountains
Trails Plan, Issuance of Incidental Take Permit, Riverside County, CA,
Wait Period Ends: 12/10/2007, Contact: Therese O'Rourke 760-431-9440.
EIS No. 20070469, Draft EIS, NOA, 00, Snapper Grouper Amendment 15B,
Fishery Management Plan, To Analyze the Effects of Updating Management
Reference Points for Golden Tilefish (Lopholatilus chamaeleonticeps);
Snowy Grouper (Epinephelus niveatus) and Red Porgy (Pagrus pagrus), NC,
SC, FL and GA, Comment Period Ends: 01/11/2008, Contact: Dr. Roy E.
Crabtree 727-824-5301 .
EIS No. 20070470, Draft Supplement, AFS, ID, North Sheep Allotments--
Sheep and Goat Allotment Management Plans, Additional Information on
Analyses Concerning Management Indicator Species, Capable and Suitable
Grazing Lands, and Adaptive Management Strategies, Authorization of
Continued Sheep Grazing for Fisher Creek, Smiley Creek, North Fork-
Boulder and Baker Creek Sheep and Goat Grazing Allotments, Sawtooth
National Forest, Ketchum Ranger District, Sawtooth National Recreation
Area, Blaine and Custer Counties, ID, Comment Period Ends: 12/24/2007,
Contact: Carol Brown 208-727-5000 .
EIS No. 20070471, Draft EIS, DOE, MN, Mesaba Energy Project, Proposes
to Design, Construct and Operate a Coal-Based Integrated Gasification
Cycle(IGCC) Electric Power Generating Facility, Located in the Taconite
Tax Relief Area (TTRA), Itasca and St. Louis Counties, MN, Comment
Period Ends: 01/11/2008, Contact: Richard A. Hargis 412-386-4604.
EIS No. 20070472, Final EIS, DOE, WV, Western Greenbrier Co-Production
Demonstration Project, Construction and Demonstration of a 98 megawatt
(MWe) Net Power Plant and Ash Byproduct Manufacturing Facility,
Rainelle, WV, Wait Period Ends: 12/10/2007, Contact: Roy Spears 304-
285-5460.
EIS No. 20070473, Draft EIS, FHW, MT, US-212 Reconstruction Project,
from Rockvale to Laurel, Proposes to Improve Safety for Local and
Regional Traffic Area, Yellowstone and Carbon Counties, MT, Comment
Period Ends: 12/26/2007, Contact: Theordore G. Burch 406-449-5302.
EIS No. 20070474, Final EIS, COE, TN, Center Hill Dam and Lake Project,
Changes to Operational Guide Curves Pool Elevations, Chancey Fork River
and Cumberland River, Dekalb County, TN, Wait Period Ends: 12/10/2007,
Contact: Joy Broach 615-736-7956.
EIS No. 20070475, Final EIS, FHW, KS, ADOPTION--Kansas Highway10
(commonly known as South Lawrence Trafficway) Relocation, Issuance or
Denial of Section 404 Permit Request, Lawrence City, Douglas County,
KS, Wait Period Ends: 12/10/2007, Contact: John Knowles 785-228-2544
Ext 211 Department of Transportation's, Federal Highway Administration,
has adopted the Corp of Engineers's , FEIS 20030010, filed 01/
07/2003. FHW was not a Cooperating Agency on the above FEIS. Under
Section 1506.3(b) of the CEQ Regulations, the FEIS must be Recirculated
for a 30-day Wait Period.
EIS No. 20070476, Draft EIS, FRC, 00, Gulf Crossing Project,
Construction and Operation of Natural Gas Pipeline to Facilitate the
Transport of up to 1.73 Billion Cubic Feet Per Day of Natural Gas,
Located in various Counties and Parishes in OK, TX, LA and MS, Comment
Period Ends: 12/24/2007, Contact: Andy Black 1-866-208-3372.
EIS No. 20070477, Final EIS, MMS, 00, PROGRAMMATIC--Alternative Energy
Development and Production and Alternate Use of Facilities on the Outer
Continental Shelf, Implementation, Atlantic, Gulf of Mexico, Pacific
and Alaska, Wait Period Ends: 12/10/2007, Contact: Mary Boatman 703-
787-1662.
EIS No. 20070478, Final EIS, AFS, AK, Helicopter Access to Conduct
Forest Inventory and Analysis (FIA) in Wilderness, Implementation,
Selected Preferred Alternative, 1 Tongass and Chugach National Forest,
AK, Wait Period Ends: 12/10/2007, Contact: Ken Post 907-586-8796.
EIS No. 20070479, Final EIS, GSA, DC, Armed Forces Retirement Home
(AFRH-W), Proposed Master Plan for Campus Located 3700 North Capitol
Street, NW., AFRH Trust Fund, Washington, DC, Wait Period Ends: 12/10/
2007, Contact: Joe Woo 202-730-3445.
Amended Notices
EIS No. 20070344, Draft EIS, FHW, VT, Circ-Williston Transportation
Project, Improvements between I-89 and the Towns Williston and Essex
and the Village of Essex Junction, City of Burlington, Chittenden
County, VT, Comment Period Ends: 11/21/2007, Contact: Kenneth R.
Sikora, Jr. 802-828-4424 . Revision of FR Published 08/10/2007:
Extending Comment Period from 11/08/2007 to 11/21/2007.
EIS No. 20070388, Draft EIS, FHW, MI, Blue Water Bridge Plaza Study and
Improve to the I-94/1-69 Corridor, To Provide Safe, Efficient and
Secure Movement of People and Goods across the Canadian--U.S. Border,
Port Huron Area, St. Clair County, MI, Comment Period Ends: 12/10/2007,
Contact: Ryan Rizzo 517-702-1833 . Revision to FR Published 09/21/2007:
Extending Comment Period from 11/05/2007 to 12/10/2007.
[[Page 63580]]
EIS No. 20070422, Draft EIS, FHW, TN, US 127/ TN 28 Improvements, from
1-40 at Crossville to TN 62 at Clarkrange, Funding, U.S. Army COE
Section 10 and 404 Permits, Cumberland and Fentress Counties, TN,
Comment Period Ends: 12/11/2007, Contact: Leigh Ann Tribble 615-781-
5760 . Revision of FR Published 10/12/2007: Correction to Comment
Period from 11/26/2007 to 12/11/2007.
EIS No. 20070441, Draft Supplement, IBR, CA, Environmental Water
Account (EWA) Project, Updated Information to Provide an Evaluation of
2004 Final EIS/EIR Environmental Water Account (EWA) and Effects
Associated with Extending the Current EWA's through 2011, CA, Comment
Period Ends: 12/10/2007, Contact: Ms. Sammie Cervantes 916-978-5189.
Revision of FR Published 10/26/2007: Correction to Title and Contact
Telephone Number.
EIS No. 20070449, Final EIS, BLM, ID, Smoky Canyon Mine Panels F & G,
Proposed Mine Expansion, Caribou County, ID, Wait Period Ends: 12/26/
2007, Contact: Bill Stout 208-478-6367. Revision of FR Published 10/26/
2007: Extending Comment Period from 11/26/2007 to 12/26/2007.
Dated: November 6, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E7-22038 Filed 11-8-07; 8:45 am]
BILLING CODE 6560-50-P