[Federal Register: November 29, 2007 (Volume 72, Number 229)]
[Notices]
[Page 67602]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr29no07-30]
[[Page 67602]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No.: 2801-027]
Littleville Power Company, Inc.; Notice of Application Tendered
for Filing With the Commission, Soliciting Additional Study Requests,
and Establishing Procedual Schedule for Licensing and Deadline for
Submission of Final Amendments
November 21, 2007.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Subsequent Minor License.
b. Project No.: 2801-027.
c. Date Filed: October 31, 2007.
d. Applicant: Littleville Power Company, Inc.
e. Name of Project: Glendale Hydroelectric Project.
f. Location: On the Housatonic River in the Town of Stockbridge,
Berkshire County, Massachusetts. The project does not affect Federal
lands.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Kevin M. Webb, Environmental Affairs
Coordinator, Littleville Power Company, Inc., One Tech Drive, Suite
220, Andover, MA 01810, (978) 681-1900 ext. 809,
kevin.webb@northamerica.enel.it.
i. FERC Contact: Kristen Murphy, (202) 502-6236 or
kristen.murphy@ferc.gov.
j. Cooperating agencies: We are asking Federal, state, local, and
tribal agencies with jurisdiction and/or special expertise with respect
to environmental issues to cooperate with us in the preparation of the
environmental document. Agencies who would like to request cooperating
status should follow the instructions for filing such requests
described in item l below. Cooperating agencies should note the
Commission's policy that agencies that cooperate in the preparation of
the environmental document cannot also intervene. See, 94 FERC ] 61,076
(2001).
k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian Tribe, or person believes
that an additional scientific study should be conducted in order to
form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian Tribe, or person
must file a request for a study with the Commission not later than 60
days from the date of filing of the application, and serve a copy of
the request on the applicant.
l. Deadline for filing additional study requests and requests for
cooperating agency status: December 30, 2007.
All documents (original and eight copies) should be filed with:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
Additional study requests and requests for cooperating agency
status may be filed electronically via the Internet in lieu of paper.
The Commission strongly encourages electronic filings. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
(http://www.ferc.gov) under the ``eFiling'' link.
m. This application is not ready for environmental analysis at this
time.
n. The existing Glendale Project consists of: (1) A 250-foot-long,
30-foot-high gravity dam with a 182-foot-long spillway; (2) a 23-acre
reservoir; (3) two manually-operated 10 by 10-foot intake gates; (4) a
1,500-foot-long, 40-foot-wide intake canal; (5) a forebay structure and
a 250-foot-long, 12-foot-diameter steel penstock; (6) a powerhouse with
four turbines with a combined installed capacity of 1,140-kilowatts;
(7) a 300-foot-long tailrace channel; (8) a step-up transformer and
13.8 kV transmission line; and (9) appurtenant facilities.
The applicant proposes to install a new 165-kW turbine that would
pass a minimum flow into the bypassed channel. The applicant estimates
that the total average annual generation, with the proposed additional
turbine, would be 5,800 megawatthours. The applicant proposes to
continue to operate the project in run-of-river mode with an increase
in minimum flow in the bypass reach from 10 cfs to 90 cfs or inflow,
whichever is less. The purpose of the project is to produce electrical
power for sale to the Groton, MA Municipal Light Department.
o. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at http://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-
866-208-3676, or for TTY, (202) 502-8659. A copy is also available for
inspection and reproduction at the address in item h above.
You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp
to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
p. With this notice, we are initiating consultation with the
Massachusetts State Historic Preservation Officer (SHPO), as required
by Sec. 106, National Historic Preservation Act, and the regulations
of the Advisory Council on Historic Preservation, 36, CFR, at 800.4.
q. Procedural schedule and final amendments: The application will
be processed according to the following Hydro Licensing Schedule.
Revisions to the schedule will be made as appropriate. The Commission
staff proposes to issue one environmental assessment rather than issue
a draft and final EA. Comments, terms and conditions, recommendations,
prescriptions, and reply comments, if any, will be addressed in an EA.
Staff intents to give at least 30 days for entities to comment on the
EA, and will take into consideration all comments received on the EA
before final action is taken on the license application.
Issue Acceptance letter/ Additional:
Information Requests.................. January 2008.
Issue Scoping Document................ February 2008.
Additional Information Response due... April 2008.
Notice of application is ready for May 2008.
environmental analysis.
Comments, recommendations, July 2008.
prescriptions due.
Notice of availability of the EA...... January 2009.
Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Kimberly D. Bose,
Secretary.
[FR Doc. E7-23147 Filed 11-28-07; 8:45 am]
BILLING CODE 6717-01-P