SUMMARY: The Commander, First Coast Guard District, has issued a 
temporary deviation from the regulation governing the operation of the 
Amtrak Bridge across Shaw Cove, mile 0.0., at New London, Connecticut. 
Under this temporary deviation, an advance notice shall be required for 
bridge openings during designated bridge opening time periods each day 
from January 5, 2007 through March 30, 2007; however, bridge openings 
shall be provided at any time for DDLC Energy, if at least a 24-hour 
advance notice is given. This deviation is necessary to facilitate 
scheduled bridge maintenance.

DATES: This deviation is effective from January 5, 2007 through March 
30, 2007.

ADDRESSES: Materials referred to in this document are available for 
inspection or copying at the First Coast Guard

[[Page 1289]]

District, Bridge Branch Office, One South Street, New York, New York, 
1004, between 7 a.m. and 3 p.m., Monday through Friday, except Federal 
holidays. The telephone number is (212) 668-7165. The First Coast Guard 
District Bridge Branch Office maintains the public docket for this 
temporary deviation.

FOR FURTHER INFORMATION CONTACT: Judy Leung-Yee, Project Officer, First 
Coast Guard District, at (212) 668-7195.

SUPPLEMENTARY INFORMATION: The Amtrak Bridge, across Shaw Cove at mile 
0.0, at New London, Connecticut, has a vertical clearance in the closed 
position of 3 feet at mean high water and 6 feet at mean low water. The 
existing drawbridge operation regulations are listed in 33 CFR 117.223.
    The owner of the bridge, the National Railroad Passenger 
Corporation, (Amtrak), requested a temporary deviation to facilitate 
scheduled bridge maintenance, replacement of the rail lifting 
equipment. The bridge will not be able to open while the bridge 
maintenance is underway.
    The normal waterway users are predominantly recreational vessels 
that do not operate during the winter months this deviation will be in 
effect. The only oil facility, DDLC Energy, and the few local fishing 
vessel operators that operate during the winter were contacted 
regarding this deviation and have agreed to this temporary bridge 
opening schedule.
    Under this temporary deviation, the Amtrak Bridge shall operate as 
follows:
    The bridge shall open on signal from January 5, 2007 through 
February 23, 2007, between 5 a.m. and 5:20 a.m. and between 12:45 p.m. 
and 1:05 p.m., daily after at least a 4-hour advance notice is given.
    From February 24, 2007 through February 25, 2007, the draw shall 
open at any time after at least an 8-hour advance notice is given.
    The bridge shall open on signal from February 26, 2007 through 
March 30, 2007, between 5 a.m. and 5:20 a.m., 12:45 p.m. and 1:05 p.m. 
and between 5:15 p.m. and 5:35 p.m., daily after at least a 4-hour 
advance notice is given.
    The bridge shall open at any time for DDLC Energy oil delivery 
vessels after at least a 24-hour advance notice is given.
    The contact information for providing the advance notice for bridge 
openings shall be via marine radio channel 123 or by calling (860) 446-
3959/3943.
    In accordance with 33 CFR 117.35(c), this work will be performed 
with all due speed in order to return the bridge to normal operation as 
soon as possible.
    Should the bridge maintenance authorized by this temporary 
deviation be completed before the end of the effective period published 
in this notice, the Coast Guard will rescind the remainder of this 
temporary deviation, and the bridge shall be returned to its normal 
operating schedule. Notice of the above action shall be provided to the 
public in the Local Notice to Mariners and the Federal Register, where 
practicable.
    This deviation from the operating regulations is authorized under 
33 CFR 117.35.

    Dated: January 3, 2007.