[Federal Register: December 14, 2007 (Volume 72, Number 240)]
[Notices]
[Page 71130]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr14de07-36]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Certification Notice-215]
Office Electricity Delivery and Energy Reliability; Notice of
Filings of Self-Certifications of Coal Capability Under the Powerplant
and Industrial Fuel Use Act
AGENCY: Office Electricity Delivery and Energy Reliability, DOE.
ACTION: Notice of Filings.
-----------------------------------------------------------------------
SUMMARY: On October 23, 2007, The WCM Group, Inc., on behalf of three
owners and operators of new base load electric powerplants, submitted
coal capability self-certifications to the Department of Energy (DOE)
pursuant to section 201(d) of the Powerplant and Industrial Fuel Use
Act of 1978 (FUA), as amended, and DOE regulations in 10 CFR 501.60,
61. Section 201(d) of FUA requires DOE to publish a notice of receipt
of self-certifications in the Federal Register.
ADDRESSES: Copies of coal capability self-certification filings are
available for public inspection, upon request, in the Office of
Electricity Delivery and Energy Reliability, Mail Code OE-20, Room 8G-
024, Forrestal Building, 1000 Independence Avenue, SW., Washington, DC
20585.
FOR FURTHER INFORMATION CONTACT: Ellen Russell at (202) 586-9624.
SUPPLEMENTARY INFORMATION: Title II of FUA, as amended (42 U.S.C. 8301
et seq.), provides that no new base load electric powerplants may be
constructed or operated without the capability to use coal or another
alternate fuel as a primary energy source. Pursuant to FUA section
201(d), in order to meet the requirement of coal capability, the owner
or operator of such facilities proposing to use natural gas or
petroleum as its primary energy source shall certify to the Secretary
of Energy (Secretary) prior to construction, or prior to operation as a
base load electric powerplant, that such powerplant has the capability
to use coal or another alternate fuel. Such certification establishes
compliance with FUA section 201(a) as of the date it is filed with the
Secretary. The Secretary is required to publish a notice in the Federal
Register reciting that the certification has been filed.
The following owners of proposed new base load electric powerplants
have filed self-certifications of coal-capability with DOE pursuant to
FUA section 201(d) and in accordance with DOE regulations in 10 CFR
501.60, 61:
Owner: Nueces Bay WLE, LP
Capacity: 700 MW
Plant Location: Corpus Christi, Nueces County, Texas
In-Service Date: June, 2009
Owner: Laredo WLE, LP
Capacity: 200 MW
Plant Location: Laredo, Webb County, Texas
In-Service Date: June, 2008
Owner: Barney M. Davis, LP
Capacity: 700 MW
Plant Location: Corpus Christi, Nueces County, Texas
In-Service Date: June, 2009
Issued in Washington, DC, on December 3, 2007.
Anthony J. Como,
Director, Permitting and Siting, Office of Electricity Delivery and
Energy Reliability.
[FR Doc. E7-24232 Filed 12-13-07; 8:45 am]
BILLING CODE 6450-01-P