[Federal Register: December 17, 2007 (Volume 72, Number 241)]
[Notices]
[Page 71387-71391]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr17de07-51]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Office of Energy Efficiency and Renewable Energy
Energy Conservation Program for Consumer Products: Decision and
Order Granting a Waiver to Samsung Air Conditioning From the Department
of Energy Residential and Commercial Package Air Conditioner and Heat
Pump Test Procedures [Case No. CAC-009]
AGENCY: Office of Energy Efficiency and Renewable Energy, Department of
Energy.
ACTION: Decision and Order.
-----------------------------------------------------------------------
SUMMARY: This notice publishes the Department of Energy's Decision and
Order in Case No. CAC-009, which grants a waiver to Samsung Air
Conditioning (Samsung) from the existing Department of Energy (DOE)
residential and commercial package air conditioner and heat pump test
procedures for specified Digital Variable Multi (DVM) variable
refrigerant flow multi-split products. As a condition of this waiver,
Samsung must test and rate its DVM multi-split products according to
the alternate test procedure set forth in this notice.
DATES: This Decision and Order is effective December 17, 2007.
FOR FURTHER INFORMATION CONTACT: Dr. Michael G. Raymond, U.S.
Department of Energy, Building Technologies Program, Mailstop EE-2J,
1000 Independence Avenue, SW., Washington, DC 20585-0121. Telephone:
(202) 586-9611. E-mail: Michael.Raymond@ee.doe.gov.
Francine Pinto or Eric Stas, U.S. Department of Energy, Office of
General Counsel, Mail Stop GC-72, 1000 Independence Avenue, SW.,
Washington, DC 20585-0103. Telephone: (202) 586-9507. E-mail:
Francine.Pinto@hq.doe.gov or Eric.Stas@hq.doe.gov.
SUPPLEMENTARY INFORMATION: In accordance with 10 CFR 430.27(l) and 10
CFR 431.401(f)(4), notice is hereby given of the issuance of the
Decision and Order set forth below. In this Decision and Order, DOE
grants Samsung a waiver from the applicable DOE residential and
commercial package air conditioner and heat pump test procedures \1\
for its DVM multi-split products, subject to a condition requiring
Samsung to test and rate its DVM multi-split products pursuant to the
alternate test procedure provided in this notice. Today's decision
requires that Samsung may not make any representations concerning the
energy efficiency of these products unless such product has been tested
in accordance with the DOE test procedure, consistent with the
provisions and restrictions in the alternate test procedure set forth
in the Decision and Order below, and such representation fairly
discloses the results of such testing.\2\ (42 U.S.C. 6293(c))
---------------------------------------------------------------------------
\1\ For residential products, the applicable test procedure is
set forth in 10 CFR part 430, subpart B, Appendix M. For commercial
products, the applicable test procedure is the Air-Conditioning and
Refrigeration Institute (ARI) Standard 340/360-2004, ``Performance
Rating of Commercial and Industrial Unitary Air-Conditioning and
Heat Pump Equipment'' (incorporated by reference at 10 CFR
431.95(b)(2)).
\2\ Consistent with the statute, distributors, retailers, and
private labelers are held to the same standard when making
representations regarding the energy efficiency of these products.
(42 U.S.C. 6293(c))
[[Page 71388]]
---------------------------------------------------------------------------
Issued in Washington, DC, on November 4, 2007.
Alexander A. Karsner,
Assistant Secretary, Energy Efficiency and Renewable Energy.
Decision and Order
In the Matter of: Samsung Air Conditioning (Samsung) (Case No. CAC-
009).
Background
Title III of the Energy Policy and Conservation Act (EPCA) sets
forth a variety of provisions concerning energy efficiency, including
Part B of Title III which establishes the ``Energy Conservation Program
for Consumer Products Other Than Automobiles.'' (42 U.S.C. 6291-6309)
Similar to the Program in Part B, Part C of Title III provides for an
energy efficiency program titled, ``Certain Industrial Equipment,''
which includes commercial air conditioning equipment, package boilers,
water heaters, and other types of commercial equipment. (42 U.S.C.
6311-6317)
Today's notice involves residential products under Part B, as well
as commercial equipment under Part C. Under both parts, the statute
specifically includes definitions, test procedures, labeling
provisions, energy conservation standards, and the authority to require
information and reports from manufacturers. With respect to test
procedures, both parts generally authorize the Secretary of Energy (the
Secretary) to prescribe test procedures that are reasonably designed to
produce results which reflect energy efficiency, energy use, and
estimated annual operating costs, and that are not unduly burdensome to
conduct. (42 U.S.C. 6293(b)(3), 6314(a)(2))
Relevant to the current Petition for Waiver, the test procedure for
residential central air conditioning and heat pump products is set
forth in 10 CFR part 430, subpart B, Appendix M. For commercial package
air conditioning and heating equipment, EPCA provides that ``the test
procedures shall be those generally accepted industry testing
procedures or rating procedures developed or recognized by the Air-
Conditioning and Refrigeration Institute [ARI] or by the American
Society of Heating, Refrigerating and Air-Conditioning Engineers
[ASHRAE], as referenced in ASHRAE/IES Standard 90.1 and in effect on
June 30, 1992.'' (42 U.S.C. 6314(a)(4)(A)) Under 42 U.S.C.
6314(a)(4)(B), the statute further directs the Secretary to amend the
test procedure for a covered commercial product if the industry test
procedure is amended, unless the Secretary determines that such a
modified test procedure does not meet the statutory criteria set forth
in 42 U.S.C. 6314(a)(2) and (3).
On December 8, 2006, DOE published a final rule adopting test
procedures for commercial package air conditioning and heating
equipment, effective January 8, 2007. 71 FR 71340. DOE adopted ARI
Standard 210/240-2003 for commercial package air conditioning and
heating equipment with capacities < 65,000 British thermal units per
hour (Btu/h) and ARI Standard 340/360-2004 for commercial package air
conditioning and heating equipment with capacities >=65,000 Btu/h and
< 240,000 Btu/h. Id. at 71371. Pursuant to this rulemaking, DOE's
regulations at 10 CFR 431.95(b)(2) incorporate by reference the
relevant ARI standards, and 10 CFR 431.96 directs manufacturers of
commercial package air-conditioning and heating equipment to use the
appropriate procedure when measuring energy efficiency of those
products. (The cooling capacities of Samsung's DVM multi-split products
fall in the ranges covered by ARI Standard 340/360-2004 and the DOE
test procedure for residential products referred to above.)
In addition, DOE's regulations contain provisions allowing a person
to seek a waiver from the test procedure requirements for covered
consumer products, when the petitioner's basic model contains one or
more design characteristics that prevent testing according to the
prescribed test procedures, or when the prescribed test procedures may
evaluate the basic model in a manner so unrepresentative of its true
energy consumption as to provide materially inaccurate comparative
data. 10 CFR 430.27(a)(1). The waiver provisions for commercial
equipment are substantively identical to those for covered consumer
products and are found at 10 CFR 431.401. Petitioners must include in
their petition any alternate test procedures known to evaluate the
basic model in a manner representative of its energy consumption. 10
CFR 430.27(b)(1)(iii); 10 CFR 431.401(b)(1)(iii).
The Assistant Secretary for Energy Efficiency and Renewable Energy
(the Assistant Secretary) may grant a waiver subject to conditions,
including adherence to alternate test procedures. 10 CFR 430.27(l); 10
CFR 431.401(f)(4). In general, a waiver terminates on the effective
date of a final rule which prescribes amended test procedures
appropriate to the model series manufactured by the petitioner, thereby
eliminating any need for the continuation of the waiver. 10 CFR
430.27(m); 10 CFR 430.401(g).
The waiver process also allows any interested person who has
submitted a Petition for Waiver to file an Application for Interim
Waiver of the applicable test procedure requirements. 10 CFR
430.27(a)(2); 10 CFR 431.401(a)(2). An Interim Waiver remains in effect
for a period of 180 days or until DOE issues its determination on the
Petition for Waiver, whichever occurs first, and may be extended by DOE
for 180 days, if necessary. 10 CFR 430.27(h); 10 CFR 431.401(e)(4).
On October 7, 2003, Samsung filed a Petition for Waiver and an
Application for Interim Waiver from the test procedures applicable to
its DVM line of residential and commercial multi-split air conditioning
and heating equipment. Samsung's petition requested a waiver from both
the residential and commercial test procedures. The applicable
residential test procedures are contained in 10 CFR part 430, subpart
B, Appendix M, and the applicable commercial test procedures are
contained in ARI Standard 340/360-2004 \3\ (incorporated by reference
at 10 CFR 431.95(b)(2)). Samsung seeks a waiver from the applicable
test procedures because the design characteristics of its DVM systems
prevent testing according to the currently prescribed test procedures.
---------------------------------------------------------------------------
\3\ In its petition, Samsung also requested a waiver from ARI
Standard 210/240-2003 (incorporated by reference at 10 CFR
431.95(b)(1)). However, based on a review of the products listed by
Samsung in its petition, DOE has determined that none of these
products has the combined features (i.e., three-phase power and
rated capacity less than 65,000 Btu/h) as would necessitate a waiver
from ARI Standard 210/240-2003.
---------------------------------------------------------------------------
On February 28, 2005, DOE published Samsung's Petition for Waiver
and granted the Application for Interim Waiver. 70 FR 9630. In a
similar and relevant case, DOE published a Petition for Waiver from
Mitsubishi Electric and Electronics USA, Inc. (MEUS) for products very
similar to Samsung's DVM products. 71 FR 14858 (March 24, 2006). In the
March 24, 2006 Federal Register notice, DOE also published and
requested comment on an alternate test procedure for the MEUS products
at issue. DOE stated that if it specified an alternate test procedure
for MEUS in the subsequent Decision and Order, DOE would consider
applying the same procedure to similar waivers for residential and
commercial central air conditioners and heat pumps, including such
products for which waivers had previously been granted. Most of the
comments responded favorably to DOE's
[[Page 71389]]
proposed alternate test procedure. Also, there was general agreement
that an alternate test procedure is necessary while a final test
procedure for these types of products is being developed. The MEUS
Decision and Order, including the alternate test procedure, was
published in the Federal Register on April 9, 2007. 72 FR 17528.
DOE received comments on the Samsung Petition from Carrier
Corporation (Carrier), Daikin U.S. Corporation, and Fujitsu General.
These comments are discussed below.
Assertions and Determinations
Samsung's Petition for Waiver
On October 7, 2003, Samsung submitted a Petition for Waiver and an
Application for Interim Waiver from the test procedures applicable to
residential and commercial package air-conditioning and heating
equipment for its new DVM multi-split products. Samsung's petition
presented several arguments in support of its claim that the design
characteristics of its DVM multi-split systems prevent testing
according to the currently prescribed test procedures. Specifically,
Samsung claimed that no other product currently available for sale in
the U.S. offers the ability of a direct expansion system to vary its
capacity every 20 seconds between 10 percent and 100 percent of the
building design load, and argued that no existing test procedure can
provide a method for rating at those capacity points. Samsung also
asserted that existing test procedures do not require calculating
integrated part-load values in the heating mode and do not account for
either the benefits of the DVM system's zoned cooling or the inherent
benefits of eliminating duct loss in a ductless system.
Therefore, the Samsung Petition requested that DOE grant a waiver
from existing test procedures until such time as a representative test
procedure is developed and adopted for this class of products. Samsung
did not include an alternate test procedure in its Petition for Waiver.
(However, DOE understands that Samsung is actively working with ARI to
develop test procedures that accurately reflect the operation and
energy consumption of these particular product designs.)
Regardless of their accuracy, DOE believes that these assertions
are inapposite to the present case for the reasons that follow. First,
for commercial systems at or above 65,000 Btu/h and less than 135,000
Btu/h, EPCA mandates use of the full load energy efficiency ratio (EER)
descriptor, and the relevant energy performance is the peak-load
efficiency, not the seasonal energy savings. (42 U.S.C. 6313(a)(1)(C))
A waiver can only be granted if a test procedure does not fairly
represent the peak-load energy consumption characteristics, which EER
measures. For Samsung's residential models, the seasonal energy
efficiency ratio (SEER) captures some of the benefits of the DVM multi-
split products' part-load efficiency. Nevertheless, there are
deficiencies in the current DOE test methods and calculation algorithms
when applied to multi-split systems. DOE has previously acknowledged
these limitations in its current test procedure, and accordingly, MEUS
was granted a waiver on the following grounds:
1. No existing test procedure provides a method for testing and
rating a system that utilizes one outdoor unit and sixteen indoor
units.
2. No existing test procedure can provide a method for rating
systems where the type and capacity of the indoor unit can be mixed in
the same system. The DVM system can mix together six different indoor
models with seven different capacities, resulting in over 1,000
combinations.
Given the present situation, Samsung can make the same claims
regarding its DVM multi-split products. Therefore, the bases for
Samsung's Petition for Waiver involve: (1) The problem of being
physically unable to test most of the complete systems in a laboratory;
(2) difficulties associated with the regulatory requirement to test the
highest-sales-volume combination; and (3) the lack of a method for
predicting the performance of untested combinations.
Of the three comments on the Samsung petition, only Carrier
Corporation (Carrier) expressed opposition. Carrier claimed that
Samsung's DVM multi-split systems could be tested using the calorimeter
air enthalpy test method set forth in ASHRAE Standard 37, ``Methods of
Testing for Rating Unitary Air-Conditioning and Heat Pump Equipment.''
Although DOE believes that use of this test, as Carrier recommends, is
theoretically possible and would likely provide more accurate results
in the cooling mode, it is not a practical solution because existing
calorimeter test rooms are too small to test Samsung's DVM multi-split
systems with more than three or four indoor units. DOE believes that
its alternate test procedure (discussed below) effectively addresses
these objections.
As mentioned above, DOE recently addressed a situation regarding
multi-split products that is relevant to the Samsung products at issue
here. Specifically, on March 24, 2006, DOE published in the Federal
Register a Petition for Waiver from MEUS relating to its R410A CITY
MULTI VRFZ products, which are very similar to Samsung's DVM multi-
split products. 71 FR 14858. In that publication, DOE stated:
To provide a test procedure from which manufacturers can make
valid representations, the Department is considering setting an
alternate test procedure for MEUS in the subsequent Decision and
Order. Furthermore, if DOE specifies an alternate test procedure for
MEUS, DOE is considering applying the alternate test procedure to
similar waivers for residential and commercial central air
conditioners and heat pumps. Such cases include Samsung's petition
for its DVM products (70 FR 9629, February 28, 2005), Fujitsu's
petition for its Airstage variable refrigerant flow (VRF) products
(70 FR 5980, February 4, 2005), and MEUS's petition for its R22 CITY
MULTI VRFZ products (69 FR 52660 (August 27, 2004).
71 FR 14858, 14861 (March 24, 2006).
Since that time, DOE has developed such an alternate test
procedure. Thus, in order to enable Samsung to make energy efficiency
representations for its specified DVM multi-split products, DOE has
decided to require use of the alternate test procedure described below,
as a condition of Samsung's waiver. This alternate test procedure is
substantially the same as the one that DOE applied to the MEUS waiver.
DOE's Alternate Test Procedure
The alternate test procedure has two basic components. First, it
permits Samsung to designate a ``tested combination'' for each model of
outdoor unit. The indoor units designated as part of the tested
combination must meet specific requirements. For example, the tested
combination must have from two to five indoor units so that it can be
tested in available test facilities. The tested combination must be
tested according to the applicable DOE test procedure, as modified by
the provisions of the alternate test procedure. Second, having a DOE
test procedure that can be applied to its product allows Samsung to
represent the energy efficiency of that product, because any such
representation must fairly disclose the results of such testing. The
DOE test procedure, as modified by the alternate test procedure
provided in this Decision and Order, provides for testing of a non-
tested combination in two ways: (1) at an energy efficiency level
determined under a DOE-approved alternative rating method; or (2) if
the first method is not available, then at the efficiency level of
[[Page 71390]]
the tested combination utilizing the same outdoor unit. Until an
alternative rating method is developed, all combinations with a
particular outdoor unit may use the rating of the combination tested
with that outdoor unit.
DOE believes that adopting this alternate test procedure as
described above (thereby allowing Samsung to make energy efficiency
representations for non-tested combinations) is reasonable because the
outdoor unit is the principal efficiency driver. The current test
procedures tend to rate these products conservatively. The multi-zoning
feature of these products, which enables them to cool only those
portions of the building that require cooling, would be expected to use
less energy than if the unit is operated to cool the entire home or a
comparatively larger area of a commercial building in response to a
single thermostat. This feature would not be captured by the test
procedure, which requires full-load testing. Under full load, the
entire building would require cooling. Additionally, the current test
procedure for commercial equipment requires full-load testing, which
disadvantages these products because they are optimized for best
efficiency when operating with less than full loads. In fact, these
products normally operate at part-load conditions. Therefore, the
alternate test procedure will provide a conservative basis for
assessing the energy efficiency for such products.
The alternate test procedure applies to both residential and
commercial multi-split products. However, some provisions are specific
to residential or commercial products. For example, section (A) of the
alternate test procedure has different provisions for residential and
commercial products. In contrast, section (B), which defines the
combinations of indoor and outdoor units to test, and section (C),
which sets forth the requirements for making representations, are the
same for residential and commercial products.
Section (A) distinguishes between residential and commercial
products for two reasons. First, 10 CFR 430.24, used for residential
products, already has requirements for selecting split-system
combinations based on the highest sales volume. However, 10 CFR part
431, which applies to commercial products, has no comparable
requirements. Therefore, section (A) of the alternate test procedure
modifies the existing residential and commercial requirements so that
both residential and commercial products can use the same definition of
a ``tested combination,'' which is set forth in section (B). Second,
section (A) requires several test procedure revisions to determine the
SEER and heating seasonal performance factor (HSPF) for the tested
combination of residential products. No test procedure revisions are
introduced for commercial products, because EPCA directs DOE to adopt
generally accepted industry test standards for these commercial
products (unless amendments to those industry test procedures are
determined by clear and convincing evidence not to meet the
requirements of the statute) (42 U.S.C. 6314(a)(4)). In contrast, for
residential products, DOE develops its own test procedures, and the
changes to the test procedure for residential products resulting from
this notice relate to: (1) The requirement that all indoor units
operate during all tests; (2) the restriction on using only one indoor
test room; (3) the selection of the modulation levels (maximum,
minimum, and a specified intermediate speed) used when testing; and (4)
the algorithm for estimating performance over the intermediate speed
operating range. DOE proposed these changes in its July 20, 2006 notice
of proposed rulemaking. 71 FR 41320.
For today's Decision and Order, the changes made by the final rule
published in the Federal Register on October 22, 2007 (72 FR 59906) to
test procedure sections 2.1, 2.2.3, 2.4.1, 3.2.4 (including Table 6),
3.6.4 (including Table 12), 4.1.4.2, and 4.2.4.2 constitute mandatory
elements of the alternate test procedure. These changes allow indoor
units to cycle off, allow the manufacturer to specify the compressor
speed used during certain tests, and introduce a new algorithm for
estimating power consumption.
With regard to the laboratory testing of both residential and
commercial products, some of the difficulties associated with the
existing test procedure are avoided by the alternate test procedure's
requirements for choosing the indoor units to be used in the
manufacturer-specified tested combination. For example, in addition to
limiting the number of indoor units, another requirement is that all of
the indoor units must be subject to meeting the same minimum external
static pressure. This requirement allows the test lab to manifold the
outlets from each indoor unit into a common plenum that supplies air to
a single airflow measuring apparatus. This requirement eliminates
situations in which some of the indoor units are ducted and some are
non-ducted. Without this requirement, the laboratory must evaluate the
capacity of a subgroup of indoor coils separately, and then sum the
separate capacities to obtain the overall system capacity. This would
require that the test laboratory be equipped with multiple airflow
measuring apparatuses (which is unlikely), or that the test laboratory
connect its one airflow measuring apparatus to one or more common
indoor units until the contribution of each indoor unit has been
measured.
Furthermore, DOE stated in the notice publishing the MEUS Petition
for Waiver that if the Department decides to specify an alternate test
procedure for MEUS, it would consider applying the procedure to waivers
for similar residential and commercial central air conditioners and
heat pumps produced by other manufacturers. 71 FR 14858, 14861 (March
24, 2006). Most of the comments received by DOE in response to the
March 2006 notice favored the proposed alternate test procedure.
Commenters generally agreed that an alternate test procedure is
appropriate for an interim period while a final test procedure for
these products is being developed.
Based on the discussion above, DOE believes that the testing
problems described above would prevent testing of Samsung's DVM basic
models according to the test procedures currently prescribed in 10 CFR
part 430, Subpart B, Appendix M, and ARI Standard 340/360-2004. After
reviewing and considering all of the comments submitted regarding the
proposed alternate test procedure, DOE has decided to adopt the
proposed alternate test procedure, with the clarifications discussed
above. DOE will also consider applying the same alternate test
procedure to waivers for similar residential and commercial central air
conditioners and heat pumps.
Consultations With Other Agencies
DOE consulted with the Federal Trade Commission (FTC) concerning
the Samsung Petition for Waiver. The FTC did not have any objections to
the issuance of a waiver to Samsung.
Conclusion
After careful consideration of all the material that was submitted
by Samsung, the comments received, and consultation with the FTC, it is
ordered that:
(1) The Petition for Waiver submitted by Samsung Air Conditioning
(Samsung) (Case No. CAC-009) is hereby granted as set forth in the
paragraphs below.
(2) Samsung shall not be required to test or rate its Digital
Variable Multi (DVM) products listed below on the basis of the
currently applicable test
[[Page 71391]]
procedures (contained in 10 CFR part 430, Subpart B, Appendix M, and
ARI Standard 340/360-2004 (incorporated by reference in 10 CFR
431.95(b)(2)), but shall be required to test and rate such products
according to the alternate test procedure as set forth in paragraph
(3).
Commercial Systems: Any product using these outdoor units:
RVMH100FAMOU, RVMC100FAMOU, RVMC070FAM0U.
For these products, the applicable test procedure is ARI 340/360-
2004, as amended by the alternate test procedure as set forth in
paragraph (3).
Residential Systems: Any product using these outdoor units:
RVMH050CBM0U, RVMC050CBM0U.
For these products, the applicable test procedure is the
residential test procedure contained in 10 CFR part 430, subpart B,
appendix M, as amended by the alternate test procedure as set forth in
paragraph (3).
DVM indoor units:
AVMKH020CAOU, AVMKC020CAOU, AVMKH032CAOU, AVMKC032CA0U, AVMKH040CA0U,
AVMKC040CAOU, AVMCH052CAOU, AVMCC052CA0U, AVMCH072CAOU, AVMCC072CAOU,
AVMCH105CAOU, AVMCC105CA0U, AVMBH020CAOU, AVMBC020CA0U, AVMBH032CAOU,
AVMBC032CA0U, AVMBH040CAOU, AVMBC040CA0U, AVMBH052CAOU, AVMBC052CA0U,
AVMBH072CAOU, AVMBC072CA0U, AVMHH105CAOU, AVMHC105CAOU, AVMHH128CAOU,
AVMHC105CAOU, AVMDH052CA0U, AVMDC052CA0U, AVMDH072CA0U, AVMDC072CA0U,
AVMWH020CAOU, AVMWCH020CAOU, AVMWH032CAOU, AVMWC032CAOU, AVMWH040CAOU,
AVMWC040CAOU, AVMWH052CAOU, AVMWC052CAOU, AVMWH072CAOU, AVMWC072CAOU.
(3) Alternate test procedure.
(A) Samsung shall be required to test the products listed in
paragraph (2) above according to the test procedures for central air
conditioners and heat pumps prescribed by DOE at 10 CFR parts 430 and
431, except that:
(i) For products covered by 10 CFR part 430 (consumer products),
Samsung shall not be required to comply with: (1) The first sentence in
10 CFR 430.24(m)(2), which refers to ``that combination manufactured by
the condensing unit manufacturer likely to have the largest volume of
retail sales;'' and (2) the third sentence in 10 CFR 430.24(m)(2),
including the provisions of 10 CFR 430.24(m)(2)(i) and (ii). Instead of
testing the combinations likely to have the highest volume of retail
sales, Samsung may test a ``tested combination'' selected in accordance
with the provisions of subparagraph (B) of this paragraph.
Additionally, instead of following the provisions of 10 CFR
430.24(m)(2)(i) and (ii) for every other system combination using the
same outdoor unit as the tested combination, Samsung shall make
representations concerning the DVM multi-split products covered in this
waiver according to the provisions of subparagraph (C) below.
(ii) For products covered by 10 CFR part 430 (consumer products),
Samsung shall be required to comply with 10 CFR 430, subpart B,
appendix M as amended by the final rule published in the Federal
Register on October 22, 2007. 72 FR 59906. The test procedure changes
applicable to multi-split products are in sections: 2.1, 2.2.3, 2.4.1,
3.2.4 (including Table 6), 3.6.4 (including Table 12), 4.1.4.2, and
4.2.4.2.
(iii) For products covered by 10 CFR part 431 (commercial
products), Samsung shall test a ``tested combination'' selected in
accordance with the provisions of subparagraph (B) of this paragraph.
For every other system combination using the same outdoor unit as the
tested combination, Samsung shall make representations concerning the
DVM multi-split products covered in this waiver according to the
provisions of subparagraph (C) below.
(B) Tested combination. The term ``tested combination'' means a
sample basic model comprised of units that are production units, or are
representative of production units, of the basic model being tested.
For the purposes of this waiver, the tested combination shall have the
following features:
(i) The basic model of a variable refrigerant flow system used as a
tested combination shall consist of an outdoor unit that is matched
with between two and five indoor units.
(ii) The indoor units shall:
(a) Represent the highest sales volume type models;
(b) Together, have a capacity between 95 percent and 105 percent of
the capacity of the outdoor unit;
(c) Not, individually, have a capacity greater than 50 percent of
the capacity of the outdoor unit;
(d) Have a fan speed that is consistent with the manufacturer's
specifications; and
(e) All have the same external static pressure.
(C) Representations. In making representations about the energy
efficiency of its DVM multi-split products, for compliance, marketing,
or other purposes, Samsung must fairly disclose the results of testing
under the DOE test procedure, doing so in a manner consistent with the
provisions outlined below:
(i) For DVM combinations tested in accordance with this alternate
test procedure, Samsung must disclose these test results.
(ii) For DVM combinations that are not tested, Samsung must make a
disclosure based on the testing results for the tested combination and
which are consistent with either of the two following methods, except
that only method (a) may be used, if available:
(a) Representation of non-tested combinations according to an
Alternative Rating Method (ARM) approved by DOE; or
(b) Representation of non-tested combinations at the same energy
efficiency level as the tested combination with the same outdoor unit.
(4) This waiver shall remain in effect from the date of issuance of
this Order until the effective date of a DOE final rule prescribing
amended test procedures appropriate to the model series manufactured by
Samsung listed above. This expiration date is April 21, 2008 for the
Samsung residential products only, for which such DOE final rule was
published on October 22, 2007 (72 FR 59906).
(5) This waiver is conditioned upon the presumed validity of
statements, representations, and documentary materials provided by the
petitioner. This waiver may be revoked or modified at any time upon a
determination that the factual basis underlying the petition is
incorrect, or DOE determines that the results from the alternate test
procedure are unrepresentative of the basic models' true energy
consumption characteristics.
Issued in Washington, DC, on November 4, 2007.
Alexander A. Karsner,
Assistant Secretary, Energy Efficiency and Renewable Energy.
[FR Doc. E7-24439 Filed 12-14-07; 8:45 am]