[Federal Register: December 31, 2007 (Volume 72, Number 249)]
[Notices]
[Page 74277]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr31de07-37]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP08-35-000]
East Tennessee Natural Gas, LLC; Notice of Request Under Blanket
Authorization
December 19, 2007.
Take notice that on December 13, 2007, East Tennessee Natural Gas,
LLC (East Tennessee), 5400 Westheimer Court, Houston, Texas 77056-5310,
filed in Docket No. CP08-35-000, an application pursuant to sections
157.205, 157.208, and 157.210 of the Commission's Regulations under the
Natural Gas Act (NGA) as amended, to increase the operating pressure on
certain segments of its mainline pipeline system between Smyth County,
Virginia, and Rockingham County, North Carolina, and to install related
facilities to accommodate the increased volumes of natural gas
production by CNX Gas Company LLC (CNX), under East Tennessee's blanket
certificate issued in Docket No. CP82-412-000,\1\ all as more fully set
forth in the application which is on file with the Commission and open
to the public for inspection.
---------------------------------------------------------------------------
\1\ 20 FERC ] 62,413 (1982).
---------------------------------------------------------------------------
East Tennessee proposes to increase the operating pressure on (1)
approximately 5.78 miles of 12-inch diameter Line 3300-2 from 924 psig
to 1150 psig, (2) approximately 26.34 miles of 24-inch diameter Line
3300-2 from 924 psig to 1200 psig, and (3) approximately 113.60 miles
of 24-inch diameter Lines 3300-2 and 3600-1 from 1200 psig to 1440 psig
and install appurtenant values, cross-over piping, pressure monitoring
and overpressure protection equipment, and a heater and filter
separator, all at an estimated cost of $4,774,000. East Tennessee
states that it would finance this project with funds on hand.
Any questions concerning this application may be directed to Garth
Johnson, General Manager, Certificates & Reporting, East Tennessee
Natural Gas, LLC, P.O. Box 1642, Houston, Texas 77251-1642, or via
telephone at (713) 627-5415, or facsimile number (713) 627-5947.
This filing is available for review at the Commission or may be
viewed on the Commission's Web site at http://www.ferc.gov, using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number filed to access the document. For
assistance, please contact FERC Online Support at FERC
OnlineSupport@ferc.gov or call toll-free at (866)206-3676, or, for TTY,
contact (202)502-8659. Comments, protests and interventions may be
filed electronically via the Internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. The Commission strongly encourages
intervenors to file electronically.
Any person or the Commission's staff may, within 60 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to section 157.205 of
the regulations under the NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the time allowed therefore, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the allowed time for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to section 7 of the NGA.
Kimberly D. Bose,
Secretary.
[FR Doc. E7-25328 Filed 12-28-07; 8:45 am]
BILLING CODE 6717-01-P