[Federal Register: March 9, 2007 (Volume 72, Number 46)]
[Notices]
[Page 10749-10750]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr09mr07-69]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6684-7]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 02/26/2007 through 03/02/2007 pursuant to 40 CFR 1506.9.
EIS No. 20070072, Second Draft Supplement, FHW, NC, NC 12 Replacement
of Herbert C. Bonner Bridge (Bridge No. 11 ) Revisions and Additions,
over Oregon Inlet Construction, Funding, U.S. Coast Guard Permit,
Special-Use-Permit, Right-of-Way Permit, U.S. Army COE Section 10 and
404 Permit, Dare County, NC , Comment Period Ends: 04/23/2007, Contact:
John F. Sullivan 919-856-4346.
EIS No. 20070073, Draft EIS, IBR, CO, Colorado River Interim Guidelines
for Lower Basin Shortages and and Coordinated Operations for Lake
Powell and Lake Mead, Implementation, Colorado River, CO, Comment
Period Ends: 04/30/2007, Contact: Nan Yoder 702-293-8500.
EIS No. 20070074, Final EIS, SFW, CA, East Contra Costa County Habitat
Conservation Plan and Natural Community Conservation Plan,
Implementation, Incidental Take Permit, Cities of Brentwood, Clayton,
Oakley and Pittsburg, Contra Costa County, CA, Wait Period Ends: 04/09/
2007, Contact: Lori Rinek 916-444-6600.
EIS No. 20070075, Draft Supplement, APH, 00, Importation of Solid Wood
Packing Material, To Reevaluate and Refine Estimates of Methyl Bromide
Usage in the Treatment, Implementation, United States, Comment Period
Ends: 04/23/2007, Contact: David A. Bergston 301-734-6103.
EIS No. 20070076, Final EIS, AFS, WI, Boulder Project, Timber
Harvesting, Vegetation and Road Management, U.S. Army COE Section 404
Permit, Chequamegon-Nicolet National Forest, Lakewood-Laona Ranger
District, Oconto and Langlade Counties, WI, Wait Period Ends: 04/09/
2007, Contact: Paul Sweeney 715-276-6333.
EIS No. 20070077, Draft EIS, AFS, SD, Mitchell Project Area, To
Implement Multiple Resource Management Actions, Mystic Ranger District,
Black Hills National Forest, Pennington County, SD, Comment Period
Ends: 04/23/2007, Contact: Roberts. J. Thompson 605-343-1567.
EIS No. 20070078, Draft EIS, NPS, NY, Sagamore Hill National Historic
Site, General Management Plan, Implementation, Oyster Bay, Nassau
County, NY, Comment Period Ends: 05/08/2007, Contact: Greg A. Marshall
516-922-4452.
EIS No. 20070079, Draft Supplement, AFS, WA,. School Fire Salvage
Recovery Project, To Clarify Definitions of Live and Dead Trees,
Implementation, Pomeroy Ranger District, Umatilla National Forest,
Columbia and Garfield Counties, WA, Comment Period Ends: 04/23/2007,
Contact: Dean R. Millett 509-843-4644.
EIS No. 20070080, Draft EIS, NIG, CA, Graton Rancheria Casino and Hotel
Project, Transfer of Land into Trust, Implementation, Federated Indians
of Graton Rancheria (Tribe), Sonoma County, CA, Comment Period Ends:
04/23/2007, Contact: Brad Meharry 202-632-7003.
EIS No. 20070081, Final EIS, JUS, TX, Laredo Detention Facility,
Proposed Contractor-Owned/Contractor-Operated Detention Facility,
Implementation, Webb County, TX, Wait Period Ends: 04/09/2007, Contact:
Scott P. Stermer 202-353-4601.
EIS No. 20070082, Final EIS, GSA, VA, Federal Bureau of Investigation
(FBI) Central Records Complex, Alternative 4--Sempeles Site,
Winchester, Frederick County, VA, Wait Period Ends: 04/09/2007,
Contact: Katrina Scarpato 215-446-4651.
EIS No. 20070083, Draft EIS, SFW/COE, CA, PROGRAMMATIC--South Bay Salt
Pond Restoration Project, Restored Tidal Marsh, Managed Ponds, Flood
Control Measures and Public Access Features, Don Edward San Francisco
Bay National Wildlife Refuge, Alameda, Santa Clara and San Mateo
Counties, CA, Comment Period Ends: 04/23/2007, Contact: Clyde Morris
510-792-0222 (SFW); and Yvonne LeTellier, 415-503-6744 (COE).
EIS No. 20070084, Draft EIS, BPA, WA, Port Angeles--Juan de Fuca
Transmission Project, Construct a 550-Megawatt Direct Current Cable
from Victoria, British Columbia, across the Strait of Juan de Fuca to
Port Angeles, Presidential Permit, Clallam County, WA, Comment Period
Ends: 04/24/2007, Contact: Stacy Mason 503-230-5455.
EIS No. 20070085, Draft EIS, USN, GU, Kilo Wharf Extension (MILCON P-
52), To Provide Adequate Berthing Facilities for Multi-Purpose Dry
Cargo/Ammunition Ship (the T-AKE), Apra Harbor Naval Complex, Mariana
Island, GU, Comment Period Ends: 04/23/2007, Contact: Nora Macariola
808-472-1402.
EIS No. 20070086, Final EIS, USA, VA, Fort Lee, Virginia and Fort A. P.
Hill, Virginia Project, Implementation of Base Closure and Realignment
(BRAC)
[[Page 10750]]
Recommendations and Other Army Actions, Prince George County,
Petersburg, Virginia Hopewell, Virginia; Caroline County, Essex County,
VA, Wait Period Ends: 04/09/2007, Contact: Karen Wilson 703-602-2861.
EIS No. 20070087, Final EIS, FTA, FL, Miami North Corridor Project,
Build Alternative is Selected, Transit Improvement between NW 62 Street
at Dr. Martin Luther King Jr. Station and NW 215th Street at the Dade/
Broward Counties Line, Funding, Dade County, FL, Wait Period Ends: 04/
09/2007, Contact: James Garland 404-562-3512.
Dated: March 6, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E7-4247 Filed 3-8-07; 8:45 am]
BILLING CODE 6560-50-P