[Federal Register: September 11, 2008 (Volume 73, Number 177)]
[Notices]               
[Page 52852]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr11se08-59]                         

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

[Certification Notice--217]

 
 Office Electricity Delivery and Energy Reliability; Notice of 
Filing of Self-Certification of Coal Capability Under the Powerplant 
and Industrial Fuel Use Act

AGENCY: Office Electricity Delivery and Energy Reliability, DOE.

ACTION: Notice of filing.

-----------------------------------------------------------------------

SUMMARY: On May 19, 2008, CPV Maryland, LLC, as owner and operator of a 
new base load electric powerplant, submitted a coal capability self-
certification to the Department of Energy (DOE) pursuant to section 
201(d) of the Powerplant and Industrial Fuel Use Act of 1978 (FUA), as 
amended, and DOE regulations in 10 CFR 501.60, 61. Section 201(d) of 
FUA requires DOE to publish a notice of receipt of self-certifications 
in the Federal Register.

ADDRESSES: Copies of coal capability self-certification filings are 
available for public inspection, upon request, in the Office of 
Electricity Delivery and Energy Reliability, Mail Code OE-20, Room 8G-
024, Forrestal Building, 1000 Independence Avenue, SW., Washington, DC 
20585.

FOR FURTHER INFORMATION CONTACT: Ellen Russell at (202) 586-9624.

SUPPLEMENTARY INFORMATION: Title II of FUA, as amended (42 U.S.C. 8301 
et seq.), provides that no new base load electric powerplant may be 
constructed or operated without the capability to use coal or another 
alternate fuel as a primary energy source.
    Pursuant to FUA section 201(d), in order to meet the requirement of 
coal capability, the owner or operator of such a facility proposing to 
use natural gas or petroleum as its primary energy source shall certify 
to the Secretary of Energy (Secretary) prior to construction, or prior 
to operation as a base load electric powerplant, that such powerplant 
has the capability to use coal or another alternate fuel. Such 
certification establishes compliance with FUA section 201(a) as of the 
date it is filed with the Secretary. The Secretary is required to 
publish a notice in the Federal Register reciting that the 
certification has been filed.
    The following owner of a proposed new base load electric powerplant 
has filed a self-certification of coal-capability with DOE pursuant to 
FUA section 201(d) and in accordance with DOE regulations in 10 CFR 
501.60, 61:
    Owner: CPV Maryland, LLC.
    Capacity: 640 megawatts (MW).
    Plant Location: Waldorf, Maryland.
    In-Service Date: Between Summer 2011 and Summer 2012.

    Issued in Washington, DC on September 3, 2008.
Anthony J. Como,
Director, Permitting and Siting, Office of Electricity Delivery and 
Energy Reliability.
[FR Doc. E8-21058 Filed 9-10-08; 8:45 am]