DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 1951-151]
Georgia Power Company; Notice of Application for Amendment of
License and Soliciting Comments, Motions To Intervene, and Protests
January 29, 2008.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Non-Project Use of Project Lands and Waters.
b. Project No: 1951-151.
c. Date Filed: October 1, 2007.
d. Applicant: Georgia Power Company.
e. Name of Project: Sinclair Hydroelectric Project.
f. Location: On the Oconee River, in Hancock, Baldwin, and Putnam
counties, Georgia.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Lee Glenn, Lake Resources Manager, 125
Wallace Dam Road NE., Eatonton, GA 31024; (706) 485-8704.
i. FERC Contact: Gina Krump, Telephone (202) 502-6704, and e-mail:
Gina.Krump@ferc.gov.
j. Deadline for filing comments, motions to intervene, and protest:
February 29, 2008.
All documents (original and eight copies) should be filed with:
Kimberly
[[Page 6955]]
D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency. A copy
of any motion to intervene must also be served upon each representative
of the Applicant specified in the particular application.
k. Description of Request: Georgia Power Company is seeking
Commission approval to issue a permit to Sinclair Development, LLC for
the construction of a boat ramp, three docks, totaling 30 slips, and
100 feet of seawall on approximately 0.25 acre of project lands along
the shore of Lake Sinclair. The proposed facilities would serve the
residents of a residential development outside the project boundary.
The proposal would require dredging of up to 500 cubic yards of
material within the affected coves and shoreline. All proposed work is
consistent with GPC's current permitting requirements and U.S. Army
Corps of Engineers permits.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street, NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at http://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. You may also
register online at http://www.ferc.gov/docs-filing/esubscription.asp to
be notified via e-mail of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or e-mail
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Any filings must bear in all capital letters the title
``COMMENTS'', ``PROTEST'', or ``MOTION TO INTERVENE'', as applicable,
and the Project Number of the particular application to which the
filing refers.
p. Agency Comments: Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
q. Comments, protests and interventions may be filed electronically
via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's Web site at http://www.ferc.gov
under the ``e-Filing'' link.
Kimberly D. Bose,
Secretary.