[Federal Register: September 26, 2008 (Volume 73, Number 188)]
[Notices]
[Page 55827]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr26se08-40]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13254-000]
City of Aspen; Notice of Preliminary Permit Application Accepted
for Filing and Soliciting Comment and Motions To Intervene
September 19, 2008.
On July 10, 2008, the City of Aspen filed an application, pursuant
to section 4(f) of the Federal Power Act, proposing to study the
feasibility of the Castle Creek Hydroelectric Project, to be located on
Castle Creek in Pitkin County, Colorado.
The proposed Castle Creek Hydroelectric Project consists of: (1)
The City of Aspen's ``Thomas Reservoir'', a small impoundment
constructed in 1964 as a part of Aspen's Water Treatment Facilities,
(2) a single underground penstock that would replace two (out of
service) underground penstocks (3) a proposed powerhouse with a single
vertical shaft Pelton turbine coupled to a synchronous generator having
a total installed capacity of 1.05 megawatts, (4) a new tailrace from
the powerhouse that will deliver flows to Castle Creek just above the
existing bridge, and (5) appurtenant facilities. The project would have
an annual generation of 7.7 million kilowatt-hours that would be
delivered to the City system.
Applicant Contact: Mr. Phil Overyender, Director of Public Works,
City of Aspen, 130 South Galena St., Aspen, CO 81611; phone: (970) 920-
5111.
FERC Contact: Alyssa Dorval, (202) 502-6735.
Deadline for filing comments, motions to intervene: 60 days from
the issuance of this notice. Comments, motions to intervene, notices of
intent, and competing applications may be filed electronically via the
Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the
Commission's Web site under the ``e-Filing'' link. If unable to be
filed electronically, documents may be paper-filed. To paper-file, an
original and eight copies should be mailed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426. For more information on how to submit these types
of filings please go to the Commission's Web site located at http://
www.ferc.gov/filing-comments.asp. More information about this project
can be viewed or printed on the ``eLibrary'' link of Commission's Web
site at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket
number (P-13254) in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-22622 Filed 9-25-08; 8:45 am]
BILLING CODE 6717-01-P