[Federal Register: October 28, 2008 (Volume 73, Number 209)]
[Notices]
[Page 63955-63956]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr28oc08-47]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2413-109]
Georgia Power Company; Notice of Application for Amendment of
License and Soliciting Comments, Motions To Intervene, and Protests
October 21, 2008.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Non-Project Use of Project Lands and Waters.
b. Project No: 2413-109.
c. Date Filed: August 14, 2008.
d. Applicant: Georgia Power Company.
e. Name of Project: Wallace Dam Project.
f. Location: The proposal would be located at The Ritz-Carlton and
Gabby Restaurant facilities, 6 miles south of the Georgia Highway 44
bridge as it crosses Richland Creek, on the Richland Creek section of
Lake Oconee, in Greene County, Georgia.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Mr. Lee Glenn, Lake Resources Manager, 125
Wallace Dam Road NE, Eatonton, GA 31024, (706) 485-8704.
i. FERC Contact: Rebecca Martin at 202-502-6012, or e-mail
rebecca.martin@ferc.gov.
j. Deadline for filing comments and or motions: November 21, 2008.
All documents (original and eight copies) should be filed with:
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426. Please include the project number (P-2413-109) on
any comments or motions filed.
The Commission's Rules of Practice require all interveners filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervener files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency. A copy of any motion to intervene must also be
served upon each representative of the Applicant specified in the
particular application.
k. Description of Request: Georgia Power Company filed an
application seeking Commission approval to permit Linger Longer
Development Company, in conjunction with The Ritz-Carlton and Gabby
Restaurant facilities, to construct an additional 10-slip group dock
and re-locate an existing 4-slip dock on Lake Oconee. The docks are to
be used by guests of The Ritz-Carlton and Gabby Restaurant. The
expansion of current dock facilities would include relocating 900.68
square feet of decking, constructing 1,238.78 square feet of decking,
and constructing 162.35 square feet of boardwalk. The proposed impacted
shoreline is estimated at 322.66 linear feet.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street, NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at http://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. You may also
register online at http://www.ferc.gov/docs-filing/esubscription.asp to
be notified via e-mail of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3372 or e-mail
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Any filings must bear in all capital letters the title
``COMMENTS'', ``PROTEST'', or ``MOTION TO
[[Page 63956]]
INTERVENE'', as applicable, and the Project Number of the particular
application to which the filing refers.
p. Agency Comments: Federal, State, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
q. Comments, protests and interventions may be filed electronically
via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's Web site at http://www.ferc.gov
under the ``e-Filing'' link.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-25623 Filed 10-27-08; 8:45 am]
BILLING CODE 6717-01-P