[Federal Register: December 11, 2008 (Volume 73, Number 239)]
[Rules and Regulations]
[Page 75307-75312]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr11de08-2]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA-2007-27739; Directorate Identifier 2006-NM-250-AD;
Amendment 39-15760; AD 2008-25-02]
RIN 2120-AA64
Airworthiness Directives; Airbus Model A330 Airplanes; and Model
A340-200 and -300 Airplanes
AGENCY: Federal Aviation Administration (FAA), Department of
Transportation (DOT).
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: We are adopting a new airworthiness directive (AD) for the
products listed above. This AD results from mandatory continuing
airworthiness information (MCAI) originated by an aviation authority of
another country to identify and correct an unsafe condition on an
aviation product. The MCAI describes the unsafe condition as:
* * * * *
The aim of * * * [Special Federal Aviation Regulation (SFAR) 88]
is to require all holders of type certificates * * * to carry out a
definition review against explosion hazards.
The unsafe condition is the potential of ignition sources inside
fuel tanks, which, in combination with flammable fuel vapors, could
result in fuel tank explosions and consequent loss of the airplane. We
are issuing this AD to require actions to correct the unsafe condition
on these products.
DATES: This AD becomes effective January 15, 2009.
The Director of the Federal Register approved the incorporation by
reference of certain publications listed in this AD as of January 15,
2009.
ADDRESSES: You may examine the AD docket on the Internet at http://
www.regulations.gov or in person at the U.S. Department of
Transportation, Docket Operations, M-30, West Building Ground Floor,
Room W12-140, 1200 New Jersey Avenue, SE., Washington, DC.
FOR FURTHER INFORMATION CONTACT: Tim Backman, Aerospace Engineer,
International Branch, ANM-116, FAA, Transport Airplane Directorate,
1601 Lind Avenue, SW., Renton, Washington 98057-3356; telephone (425)
227-2797; fax (425) 227-1149.
SUPPLEMENTARY INFORMATION:
Discussion
We issued a supplemental notice of proposed rulemaking (NPRM) to
amend 14 CFR part 39 to include an AD that would apply to the specified
products. That supplemental NPRM was published in the Federal Register
on June 17, 2008 (73 FR 34228). That supplemental NPRM proposed to
correct an unsafe condition for the specified products. The MCAI
states:
[T]he FAA published SFAR 88 (Special Federal Aviation Regulation
88).
By mail referenced 04/00/02/07/01-L296 of March 4th, 2002 and
04/00/02/07/03-L024 of February 3rd, 2003 the JAA (Joint Aviation
Authorities) recommended to the National Aviation Authorities (NAA)
the application of a similar regulation.
The aim of this regulation is to require all holders of type
certificates for passenger transport aircraft certified after
January 1st, 1958 with a capacity of 30 passengers or more, or a
payload of 3,402 kg or more, to carry out a definition review
against explosion hazards.
Consequently, the following measures [are] rendered mandatory *
* *:
[inspection and] replacement [if necessary] of the
white P-clips by blue P-clips which are more fuel resistant remove
the risks of fuel quantity indicator (FQI) and fuel level sensor
system (FLSS) harnesses chafing against the metallic part of the P-
clip,
Modification of electrical bonding of equipment
installed in fuel tanks in order to re-establish the conformity with
the design definition by introducing additional bonding leads,
electrical bonding points and electrical bonding of a support
bracket for a diffuser assembly installed between Rib 1 and Rib 2 on
the stringers of the Number 1 bottom skin panel,
[[Page 75308]]
Modification of bonding points, installation of
additional bonding leads and other modifications of the Additional
Center Tank (ACT),
Modification to increase the distance between metallic
parts on the THS Trim Tank,
Installation of a bonding lead between the bonding tags
on the Jettison valve actuator and drive assembly.
This new AD supersedes EASA AD 2006-0322, taking over its
requirements and:
Mandates SB [service bulletin] A330-28-3082 Revision 04
which introduces an additional work for some bonding points which
were omitted from the center tank at original issue (action n[deg]2
[paragraph (f)(2) of this AD]);
Mandates SB A340-28-4097 Revision 03 which introduces
an additional work by addition of electrical bondings omitted from
previous revisions (action n[deg]2);
Introduces an extension of the required compliance time
to perform action n[deg]4 for those aircraft already compliant with
AIRBUS AOT 55-03 dated 22 August 1996 (``solution A''), mandated by
DGAC [Direction G[eacute]n[eacute]rale de l'Aviation Civile] AD F-
1996-178-049(B) R1 and DGAC AD F-1996-177-038(B) with a compliance
time of November 15th, 1996;
Refers to the latest revision of certain AIRBUS SBs.
The unsafe condition is the potential of ignition sources inside fuel
tanks, which, in combination with flammable fuel vapors, could result
in fuel tank explosions and consequent loss of the airplane. You may
obtain further information by examining the MCAI in the AD docket.
Explanation of New Service Information
Airbus has issued Mandatory Service Bulletin A330-28-3082, Revision
05, including Appendix 1, dated May 27, 2008. We referred to Revision
04 of that service bulletin, dated August 3, 2007, as the appropriate
source of service information for accomplishing certain actions
specified in the supplemental NPRM. Revision 05 of the service bulletin
was issued to delete information relating to the bonding of a bracket
at Stringer 14 between Rib 1 and Rib 2, which is not applicable to the
Model A330 airplanes affected by that service bulletin. Revision 05
also includes additional kits and other minor editorial changes. No
additional work is required for airplanes modified in accordance with
Revision 04.
We have changed Table 1 of this AD to include a reference to
Revision 05, in addition to Revision 04, of Airbus Mandatory Service
Bulletin A330-28-3082 for defining the applicability of certain
paragraphs. We have also changed paragraphs (f)(2)(i) and (f)(2)(iii)
of this AD to specify Revision 05 of the service bulletin as the
appropriate source of service information for doing the actions in
those paragraphs, and we have changed Table 2 of this AD to list
Revision 04 of the service bulletin as acceptable for accomplishment of
the actions before the effective date of this AD. Finally, we have
changed Table 3 of this AD to include Revision 05 of the service
bulletin in the list of related service information.
Comments
We gave the public the opportunity to participate in developing
this AD. We received no comments on the NPRM or on the determination of
the cost to the public.
Conclusion
We reviewed the available data and determined that air safety and
the public interest require adopting the AD with the changes described
previously. We determined that these changes will not increase the
economic burden on any operator or increase the scope of the AD.
Differences Between This AD and the MCAI or Service Information
We have reviewed the MCAI and related service information and, in
general, agree with their substance. But we might have found it
necessary to use different words from those in the MCAI to ensure the
AD is clear for U.S. operators and is enforceable. In making these
changes, we do not intend to differ substantively from the information
provided in the MCAI and related service information.
We might also have required different actions in this AD from those
in the MCAI in order to follow our FAA policies. Any such differences
are highlighted in a NOTE within the AD.
Costs of Compliance
We estimate that this AD will affect 28 products of U.S. registry.
We also estimate that it will take about 670 work-hours per product to
comply with the basic requirements of this AD. The average labor rate
is $80 per work-hour. Required parts will cost about $2,718 per
product. Where the service information lists required parts costs that
are covered under warranty, we have assumed that there will be no
charge for these parts. As we do not control warranty coverage for
affected parties, some parties may incur costs higher than estimated
here. Based on these figures, we estimate the cost of this AD to the
U.S. operators to be $1,576,904, or $56,318 per product.
Authority for This Rulemaking
Title 49 of the United States Code specifies the FAA's authority to
issue rules on aviation safety. Subtitle I, section 106, describes the
authority of the FAA Administrator. ``Subtitle VII: Aviation
Programs,'' describes in more detail the scope of the Agency's
authority.
We are issuing this rulemaking under the authority described in
``Subtitle VII, Part A, Subpart III, Section 44701: General
requirements.'' Under that section, Congress charges the FAA with
promoting safe flight of civil aircraft in air commerce by prescribing
regulations for practices, methods, and procedures the Administrator
finds necessary for safety in air commerce. This regulation is within
the scope of that authority because it addresses an unsafe condition
that is likely to exist or develop on products identified in this
rulemaking action.
Regulatory Findings
We determined that this AD will not have federalism implications
under Executive Order 13132. This AD will not have a substantial direct
effect on the States, on the relationship between the national
government and the States, or on the distribution of power and
responsibilities among the various levels of government.
For the reasons discussed above, I certify this AD:
1. Is not a ``significant regulatory action'' under Executive Order
12866;
2. Is not a ``significant rule'' under the DOT Regulatory Policies
and Procedures (44 FR 11034, February 26, 1979); and
3. Will not have a significant economic impact, positive or
negative, on a substantial number of small entities under the criteria
of the Regulatory Flexibility Act.
We prepared a regulatory evaluation of the estimated costs to
comply with this AD and placed it in the AD docket.
Examining the AD Docket
You may examine the AD docket on the Internet at http://
www.regulations.gov; or in person at the Docket Operations office
between 9 a.m. and 5 p.m., Monday through Friday, except Federal
holidays. The AD docket contains the NPRM, the regulatory evaluation,
any comments received, and other information. The street address for
the Docket Operations office (telephone (800) 647-5527) is in the
ADDRESSES section. Comments will be available in the AD docket shortly
after receipt.
[[Page 75309]]
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
reference, Safety.
Adoption of the Amendment
0
Accordingly, under the authority delegated to me by the Administrator,
the FAA amends 14 CFR part 39 as follows:
PART 39--AIRWORTHINESS DIRECTIVES
0
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
0
2. The FAA amends Sec. 39.13 by adding the following new AD:
2008-25-02 Airbus: Amendment 39-15760. Docket No. FAA-2007-27739;
Directorate Identifier 2006-NM-250-AD.
Effective Date
(a) This airworthiness directive (AD) becomes effective January
15, 2009.
Affected ADs
(b) None.
Applicability
(c) This AD applies to all Airbus Model A330, A340-200, and
A340-300 airplanes, all certified models, all serial numbers,
certificated in any category.
Subject
(d) Air Transport Association (ATA) of America Codes 28: Fuel,
and 55: Stabilizers.
Reason
(e) The mandatory continuing airworthiness information (MCAI)
states:
[T]he FAA published SFAR 88 (Special Federal Aviation Regulation
88).
By mail referenced 04/00/02/07/01-L296 of March 4th, 2002 and
04/00/02/07/03-L024 of February 3rd, 2003, the JAA (Joint Aviation
Authorities) recommended to the National Aviation Authorities (NAA)
the application of a similar regulation.
The aim of this regulation is to require all holders of type
certificates for passenger transport aircraft certified after
January 1st, 1958 with a capacity of 30 passengers or more, or a
payload of 3,402 kg or more, to carry out a definition review
against explosion hazards.
Consequently, the following measures [are] rendered mandatory *
* *:
[inspection and] replacement [if necessary] of the
white P-clips by blue P-clips which are more fuel resistant remove
the risks of fuel quantity indicator (FQI) and fuel level sensor
system (FLSS) harnesses chafing against the metallic part of the P-
clip,
Modification of electrical bonding of equipment
installed in fuel tanks in order to re-establish the conformity with
the design definition by introducing additional bonding leads,
electrical bonding points and electrical bonding of a support
bracket for a diffuser assembly installed between Rib 1 and Rib 2 on
the stringers of the Number 1 bottom skin panel,
Modification of bonding points, installation of
additional bonding leads and other modifications of the Additional
Center Tank (ACT),
Modification to increase the distance between metallic
parts on the THS (trimmable horizontal stabilizer) Trim Tank,
Installation of a bonding lead between the bonding tags
on the Jettison valve actuator and drive assembly.
This new AD supersedes EASA AD 2006-0322, taking over its
requirements and:
Mandates SB [service bulletin] A330-28-3082 Revision 04
which introduces an additional work for some bonding points which
were omitted from the center tank at original issue (action n[deg]2
[paragraph (f)(2) of this AD]);
Mandates SB A340-28-4097 Revision 03 which introduces
an additional work by addition of electrical bondings omitted from
previous revisions (action n[deg]2);
Introduces an extension of the required compliance time
to perform action n[deg]4 for those aircraft already compliant with
AIRBUS AOT 55-03 dated 22 August 1996 (``solution A''), mandated by
DGAC [Direction G[eacute]n[eacute]rale de l'Aviation Civile] AD F-
1996-178-049(B) R1 and DGAC AD F-1996-177-038(B) with a compliance
time of November 15th, 1996;
Refers to the latest revision of certain AIRBUS SBs.
The unsafe condition is the potential of ignition sources inside
fuel tanks, which, in combination with flammable fuel vapors, could
result in fuel tank explosions and consequent loss of the airplane.
Actions and Compliance
(f) Unless already done, do the actions in paragraphs (f)(1),
(f)(2), (f)(3), (f)(4), and (f)(5) of this AD for the applicable
airplanes identified in Table 1 of this AD.
Table 1--Applicable Paragraphs by Model
------------------------------------------------------------------------
Are affected by
These airplane models-- Except airplanes-- these paragraphs
of this AD--
------------------------------------------------------------------------
Model A330, A340-200, and A340- On which Airbus (f)(1).
330 airplanes. Modification
47634 has been
embodied in
production.
On which (f)(2)(i), except
both Airbus as provided by
Modifications paragraphs
49135 and 49630 (f)(2)(ii) and
have been (f)(2)(iii) of
embodied in this AD.
production.
Both
Airbus
Modifications
51825 and 55118
have been
embodied in
production.
That have
been modified in-
service in
accordance with
both Airbus
Mandatory Service
Bulletin A330-28-
3082, Revision
04, including
Appendix 01,
dated August 3,
2007, or Revision
05, including
Appendix 1, dated
May 27, 2008; and
Airbus Mandatory
Service Bulletin
A330-28-3101,
Revision 01,
dated October 11,
2006.
That have
been modified in-
service in
accordance with
both Airbus
Mandatory Service
Bulletin A340-28-
4097, Revision
03, including
Appendix 01,
dated July 3,
2007; and Airbus
Mandatory Service
Bulletin A340-28-
4118, Revision
02, dated July
10, 2007.
[[Page 75310]]
Model A330 airplanes on which On which (f)(2)(ii) and
the actions specified in Airbus both Airbus (f)(2)(iii).
Service Bulletin A330-28-3082, Modifications
dated June 14, 2004, have been 49135 and 49630
accomplished before the have been
effective date of this AD; and embodied in
Model A340-200 and A340-300 production.
airplanes on which the actions Both
specified in Airbus Service Airbus
Bulletin A340-28-4097, dated Modifications
June 14, 2004, Revision 01, 51825 and 55118
dated March 3, 2005, or Airbus have been
Mandatory Service Bulletin A340- embodied in
28-4097, Revision 02, dated production.
August 16, 2006, have been That have
accomplished before the been modified in-
effective date of this AD. service in
accordance with
both Airbus
Mandatory Service
Bulletin A330-28-
3082, Revision
04, including
Appendix 01,
dated August 3,
2007, or Revision
05, including
Appendix 1, dated
May 27, 2008; and
Airbus Mandatory
Service Bulletin
A330-28-3101,
Revision 01,
dated October 11,
2006.
That have
been modified in-
service in
accordance with
both Airbus
Mandatory Service
Bulletin A340-28-
4097, Revision
03, including
Appendix 01,
dated July 3,
2007, and Airbus
Mandatory Service
Bulletin A340-28-
4118, Revision
02, dated July
10, 2007.
Model A340-200 and A340-300 That have been (f)(3).
airplanes that have the ACT modified in
embodied in production or in service by Airbus
service (Airbus Modification Mandatory Service
42612, 44002, or 44005). Bulletin A340-28-
4078, Revision
01, dated January
25, 2007.
Model A340-200 and A340-300 On which (f)(4)(i), except
airplanes. Airbus as provided by
Modification paragraph
44252 has been (f)(4)(ii) of
embodied in this AD.
production.
That have
been modified in-
service in
accordance with
Airbus Service
Bulletin A340-55-
4017, dated
August 20, 1996;
Revision 1, dated
February 12,
2007; or Revision
02, dated March
16, 2007.
Model A330-301, -321, -322, - On which (f)(4)(i), except
341, -342 airplanes. Airbus as provided by
Modification paragraph
44252 has been (f)(4)(ii) of
embodied in this AD.
production.
That have
been modified in-
service in
accordance with
Airbus Service
Bulletin A330-55-
3016, dated
August 20, 1996;
Revision 1 dated
February 12,
1997; or Revision
02, dated March
16, 2007.
Model A330-301, -321, -322, - On which the (f)(4)(ii).
341, -342 airplanes; and Model improvement of
A340-200 and A340-300 airplanes. the THS lightning
strike protection
has already been
performed before
the effective
date of this AD
in accordance
with Airbus A330/
A340 All
Operators Telex
55-03, dated
August 22, 1996
(``solution A''),
mandated by
Direction
G[eacute]n[eacute
]rale de
l'Aviation Civile
(DGAC)
Airworthiness
Directive F-1996-
178-049(B) R1,
and DGAC
Airworthiness
Directive F-1996-
177-038(B), with
a compliance time
of November 15,
1996.
Model A340-200 and A340-300 On which (f)(5).
airplanes. Airbus
Modification
46142 has been
embodied in
production.
That have
been modified in-
service in
accordance with
Airbus Mandatory
Service Bulletin
A340-28-4073,
Revision 02,
dated March 8,
2007.
------------------------------------------------------------------------
(1) Within 24 months after the effective date of this AD, do a
detailed visual inspection of the P-clips in the wings and center
fuel tanks, and apply the applicable corrective actions, in
accordance with the applicable instructions of Airbus Mandatory
Service Bulletin A330-28-3092, Revision 01, dated December 14, 2005;
or Airbus Mandatory Service Bulletin A340-28-4107, Revision 01,
dated December 14, 2005.
(2) Do the requirements of paragraphs (f)(2)(i), (f)(2)(ii), and
(f)(2)(iii) of this AD, as applicable, at the times specified in
those paragraphs.
(i) For airplanes affected by this paragraph, as specified in
Table 1 of this AD: Within 24 months after the effective date of
this AD, modify the electrical bonding of the equipment installed in
fuel tanks, in accordance with both Airbus Mandatory Service
Bulletin A330-28-3082, Revision 05, including Appendix 1, dated May
27, 2008, and Airbus Mandatory Service Bulletin A330-28-3101,
Revision 01, dated October 11, 2006; or both Airbus Mandatory
Service Bulletin A340-28-4097, Revision 03, including Appendix 01,
dated July 3, 2007, and Airbus Mandatory Service Bulletin A340-28-
4118, Revision 02, dated July 10, 2007; as applicable.
(ii) For airplanes affected by this paragraph, as specified in
Table 1 of this AD: Within 24 months after the effective date of
this AD, modify the electrical bonding of the equipment installed in
fuel tanks, in accordance with Airbus Mandatory Service Bulletin
A330-28-3101, Revision 01, dated October 11, 2006; or Airbus
Mandatory Service Bulletin A340-28-4118, Revision 02, dated July 10,
2007; as applicable.
(iii) For airplanes affected by this paragraph, as specified in
Table 1 of this AD:
[[Page 75311]]
Within 48 months after the effective date of this AD, do the
additional work specified in Airbus Mandatory Service Bulletin A330-
28-3082, Revision 05, including Appendix 1, dated May 27, 2008; or
Airbus Mandatory Service Bulletin A340-28-4097, Revision 03,
including Appendix 01, dated July 3, 2007; in accordance with the
accomplishment instructions of those service bulletins, as
applicable.
(3) Within 24 months after the effective date of this AD, modify
the electrical bonding in the ACT in accordance with the
Accomplishment Instructions of Airbus Mandatory Service Bulletin
A340-28-4078, Revision 01, dated January 25, 2007.
(4) Within 24 months after the effective date of this AD, do the
requirements of paragraphs (f)(4)(i) and (f)(4)(ii), as applicable.
(i) For airplanes affected by this paragraph, as specified in
Table 1 of this AD: Within 24 months after the effective date of
this AD, increase the distance between metallic parts on the THS
trim tank in accordance with the Accomplishment Instructions of
Airbus Mandatory Service Bulletin A330-55-3016, Revision 02, March
16, 2007; or Airbus Mandatory Service Bulletin A340-55-4017,
Revision 02, dated March 16, 2007; as applicable.
(ii) For airplanes affected by this paragraph, as specified in
Table 1 of this AD: At the first THS removal from the aircraft done
for any reason after the effective date of this AD (e.g., fuselage
stress jacking, and repair) when the airplane is on a support tool
(lifting and resting point fittings must be installed), or at the
time of the first maintenance task that requires the use of THS
lifting and resting point fittings, whichever occurs earlier,
increase the distance between metallic parts on the THS trim tank in
accordance with the Accomplishment Instructions of Airbus Mandatory
Service Bulletin A330-55-3016, Revision 02, March 16, 2007; or
Airbus Mandatory Service Bulletin A340-55-4017, Revision 02, dated
March 16, 2007; as applicable.
(5) Within 24 months after the effective date of this AD,
install a bonding lead between the bonding tags on the jettison
valve actuator and drive assembly in accordance with the
instructions of Airbus Mandatory Service Bulletin A340-28-4073,
Revision 02, dated March 8, 2007.
(6) Actions done before the effective date of this AD in
accordance with the service bulletins listed in Table 2 of this AD
are acceptable for compliance with the corresponding requirements of
this AD.
Table 2--Credit Service Bulletins
----------------------------------------------------------------------------------------------------------------
Airbus Service information Revision level Date Corresponding paragraphs
----------------------------------------------------------------------------------------------------------------
Mandatory Service Bulletin A330-28- 02........................ August 11, 2006...... (f)(2)(i) of this AD.
3082.
Mandatory Service Bulletin A330-28- 03........................ November 15, 2006.... (f)(2)(i) and (f)(2)(iii)
3082. of this AD.
Mandatory Service Bulletin A330-28- 04........................ August 3, 2007....... (f)(2)(i) and (f)(2)(iii)
3082. of this AD.
Mandatory Service Bulletin A330-28- Original.................. June 5, 2006......... (f)(2)(i) and (f)(2)(ii)
3101. of this AD.
Mandatory Service Bulletin A340-28- Original.................. June 5, 2006......... (f)(2)(i) and (f)(2)(ii)
4118. of this AD.
Mandatory Service Bulletin A340-28- 01........................ October 11, 2006..... (f)(2)(i) and (f)(2)(ii)
4118. of this AD.
Service Bulletin A330-28-3082..... 01........................ March 2, 2005........ (f)(2)(i) of this AD.
Service Bulletin A330-55-3016..... Original.................. August 20, 1996...... (f)(4)(i) and (f)(4)(ii)
of this AD.
Service Bulletin A330-55-3016..... 1......................... February 12, 1997.... (f)(4)(i) and (f)(4)(ii)
of this AD.
Service Bulletin A340-28-4073..... Original.................. May 14, 1998......... (f)(5) of this AD.
Service Bulletin A340-28-4073..... 01........................ October 9, 1998...... (f)(5) of this AD.
Service Bulletin A340-28-4078..... Original.................. March 17, 2000....... (f)(3) of this AD.
Service Bulletin A340-55-4017..... Original.................. August 20, 1996...... (f)(4)(i) and (f)(4)(ii)
of this AD.
Service Bulletin A340-55-4017..... 1......................... February 12, 1997.... (f)(4)(i) and (f)(4)(ii)
of this AD.
----------------------------------------------------------------------------------------------------------------
FAA AD Differences
Note 1: This AD differs from the MCAI and/or service information
as follows: No differences.
Other FAA AD Provisions
(g) The following provisions also apply to this AD:
(1) Alternative Methods of Compliance (AMOCs): The Manager, ANM-
116, International Branch, Transport Airplane Directorate, FAA, has
the authority to approve AMOCs for this AD, if requested using the
procedures found in 14 CFR 39.19. Send information to ATTN: Tim
Backman, Aerospace Engineer, ANM-116, International Branch,
Transport Airplane Directorate, FAA, 1601 Lind Ave. SW., Renton,
Washington, 98057-3356, telephone (425) 227-2797; fax (425) 227-
1149. Before using any approved AMOC on any airplane to which the
AMOC applies, notify your appropriate principal inspector (PI) in
the FAA Flight Standards District Office (FSDO), or lacking a PI,
your local FSDO.
(2) Airworthy Product: For any requirement in this AD to obtain
corrective actions from a manufacturer or other source, use these
actions if they are FAA-approved. Corrective actions are considered
FAA-approved if they are approved by the State of Design Authority
(or their delegated agent). You are required to assure the product
is airworthy before it is returned to service.
(3) Reporting Requirements: For any reporting requirement in
this AD, under the provisions of the Paperwork Reduction Act, the
Office of Management and Budget (OMB) has approved the information
collection requirements and has assigned OMB Control Number 2120-
0056.
Related Information
(h) Refer to MCAI European Aviation Safety Agency (EASA)
Airworthiness Directive 2007-0278, dated November 5, 2007
[Corrected: November 8, 2007], and the service bulletins in Table 3
of this AD, for related information.
Table 3--Related Service Bulletins
----------------------------------------------------------------------------------------------------------------
Airbus Mandatory Service Bulletin Revision level Date
----------------------------------------------------------------------------------------------------------------
A330-28-3082, including Appendix 1........... 05 May 27, 2008.
A330-28-3092, excluding Appendix 01.......... 01 December 14, 2005.
A330-28-3101................................. 01 October 11, 2006.
A330-55-3016................................. 02 March 16, 2007.
A340-28-4073................................. 02 March 8, 2007.
A340-28-4078................................. 01 January 25, 2007.
A340-28-4097, including Appendix 01.......... 03 July 3, 2007.
A340-28-4107, excluding Appendix 01.......... 01 December 14, 2005.
A340-28-4118................................. 02 July 10, 2007.
A340-55-4017................................. 02 March 16, 2007.
----------------------------------------------------------------------------------------------------------------
[[Page 75312]]
Material Incorporated by Reference
(i) You must use the service information specified in Table 4 of
this AD to do the actions required by this AD, unless the AD
specifies otherwise.
(1) The Director of the Federal Register approved the
incorporation by reference of this service information under 5
U.S.C. 552(a) and 1 CFR part 51.
(2) For service information identified in this AD, contact
Airbus SAS--Airworthiness Office--EAL, 1 Rond Point Maurice
Bellonte, 31707 Blagnac Cedex, France; fax +33 5 61 93 45 80, e-mail
airworthiness.A330-A340@airbus.com; Internet http://www.airbus.com.
(3) You may review copies of the service information that is
incorporated by reference at the FAA, Transport Airplane
Directorate, 1601 Lind Avenue, SW., Renton, Washington. For
information on the availability of this material at the FAA, call
425-227-1221 or 425-227-1152.
(4) You may also review copies of the service information at the
National Archives and Records Administration (NARA). For information
on the availability of this material at NARA, call (202) 741-6030,
or go to: http://www.archives.gov/federal-register/cfr/ibr-
locations.html.
Table 4--Material Incorporated by Reference
----------------------------------------------------------------------------------------------------------------
Airbus Mandatory Service Bulletin Revision level Date
----------------------------------------------------------------------------------------------------------------
A330-28-3082, including Appendix 1........... 05 May 27, 2008.
A330-28-3092, excluding Appendix 01.......... 01 December 14, 2005.
A330-28-3101................................. 01 October 11, 2006.
A330-55-3016................................. 02 March 16, 2007.
A340-28-4073................................. 02 March 8, 2007.
A340-28-4078................................. 01 January 25, 2007.
A340-28-4097, including Appendix 01.......... 03 July 3, 2007.
A340-28-4107, excluding Appendix 01.......... 01 December 14, 2005.
A340-28-4118................................. 02 July 10, 2007.
A340-55-4017................................. 02 March 16, 2007.
----------------------------------------------------------------------------------------------------------------
Issued in Renton, Washington, on November 26, 2008.
Ali Bahrami,
Manager, Transport Airplane Directorate, Aircraft Certification
Service.
[FR Doc. E8-29076 Filed 12-10-08; 8:45 am]
BILLING CODE 4910-13-P