[Federal Register Volume 73, Number 247 (Tuesday, December 23, 2008)]
[Rules and Regulations]
[Pages 78599-78616]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: E8-30054]



========================================================================
Rules and Regulations
                                                Federal Register
________________________________________________________________________

This section of the FEDERAL REGISTER contains regulatory documents 
having general applicability and legal effect, most of which are keyed 
to and codified in the Code of Federal Regulations, which is published 
under 50 titles pursuant to 44 U.S.C. 1510.

The Code of Federal Regulations is sold by the Superintendent of Documents. 
Prices of new books are listed in the first FEDERAL REGISTER issue of each 
week.

========================================================================


Federal Register / Vol. 73, No. 247 / Tuesday, December 23, 2008 / 
Rules and Regulations

[[Page 78599]]



NUCLEAR REGULATORY COMMISSION

10 CFR Parts 30, 40, 50, 60, 61, 63, 70, 72, 75, 76, 95, 110, and 
150

RIN 3150-AH38
[NRC-2008-0543]


Regulatory Changes To Implement the Additional Protocol to the 
US/IAEA Safeguards Agreement

AGENCY: Nuclear Regulatory Commission.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is amending its 
regulations to implement the Protocol Additional to the Agreement 
Between the United States of America and the International Atomic 
Energy Agency for the Application of Safeguards in the United States of 
America (Additional Protocol). The Additional Protocol requires the 
U.S. to report additional information on various nuclear fuel cycle-
related activities and to provide the International Atomic Energy 
Agency (IAEA) with access to those locations beyond the information 
currently reported for nuclear facilities under the existing Agreement 
Between the United States of America and the International Atomic 
Energy Agency for the Application of Safeguards in the United States of 
America (Safeguards Agreement). The amended regulations codify the 
requirement for certain NRC and Agreement State licensees to report 
information and provide access under the Additional Protocol that are 
currently not subject to inspections or reporting under the Safeguards 
Agreement. These amendments enable the U.S. Government to meet its 
obligations related to the Safeguards Agreement and the Additional 
Protocol.

DATES: Effective Date: This final rule is effective December 23, 2008.

FOR FURTHER INFORMATION CONTACT: Naiem S. Tanious, Office of Federal 
and State Materials and Environmental Management Programs, U.S. Nuclear 
Regulatory Commission, Washington, DC 20555-0001, telephone (301) 415-
6103; e-mail Naiem.Tanious @nrc.gov.

SUPPLEMENTARY INFORMATION: 

Background

    The ``United States Additional Protocol Implementation Act'' (Title 
II of Pub. L. 109-401) assigns the President responsibility for 
implementing the Act and the U.S. Additional Protocol. Executive Order 
13458 assigned the U.S. Departments of State, Defense (DOD), Commerce 
(DOC), and Energy (DOE), the Attorney General, and the NRC 
responsibility for implementing the Additional Protocol. The NRC is 
assigned specific responsibility for implementing the Additional 
Protocol at NRC and Agreement State licensees (except at those 
facilities for which the DOE or DOD are assigned lead agency 
responsibility). The DOC is responsible for reportable commercial 
activities conducted outside of NRC-related activities. The Additional 
Protocol, on which the U.S. Senate provided its consent to ratification 
on March 31, 2004, is a legal document that requires the United States 
to report information on various nuclear fuel cycle-related activities 
to the IAEA and, upon request, to provide the IAEA with access to these 
locations in the U.S. Locations, information, and activities determined 
by the U.S. government to be of direct national security significance 
are excluded.
    The Additional Protocol augments the existing Safeguards Agreement 
by requiring the United States to provide the IAEA with information on 
civil nuclear and nuclear-related items, materials, and activities not 
presently covered, including but not limited to the following:
    a. Information about and IAEA inspector access to nuclear fuel 
cycle-related locations for which access is not already provided under 
the Safeguards Agreement (e.g., uranium mines and ore concentrate 
storage installations);
    b. Information on, and IAEA short-notice access to, all buildings 
on the sites of facilities selected by the IAEA from the U.S. Eligible 
Facilities List;
    c. Access for IAEA collection of environmental samples at locations 
where such sampling is specifically authorized by the U.S. Government;
    d. Information on research and development and manufacturing 
activities related to the nuclear fuel cycle; and
    e. Expanded reporting of exports and imports of specific equipment 
and non-nuclear material.
    The NRC is establishing these requirements to enable the United 
States to collect the information necessary to prepare the U.S. 
declaration to the IAEA.

Section-by-Section Analysis

Section 30.8 Information Collection Requirements: Office of Management 
and Budget (OMB) Approval

    This section is amended to include the approved OMB information 
collection control numbers for DOC/NRC Forms AP-1, AP-A, and associated 
forms.

Section 30.34 Terms and Conditions of Licenses

    In Sec.  30.34, paragraph (k) is added to require byproduct 
material licensees to file location information described in Sec.  
75.11, to permit verification of information by the IAEA, and to take 
other actions as necessary to implement the Additional Protocol.

Section 40.8 Information Collection Requirements: OMB Approval

    This section is amended to include the approved OMB information 
collection control numbers for DOC/NRC Forms AP-1, AP-A, and associated 
forms.

Section 40.31 Application for Specific Licenses

    In Sec.  40.31, paragraph (g) is amended to require both applicants 
for and recipients of a license to possess and use source material in a 
uranium or thorium processing plant and any other applicants for a 
license to possess source material to provide facility information 
described in new Sec.  75.10. The section is also amended to require 
ore processing plants or facilities using or storing ore concentrates 
or impure source material to provide location information described in 
Sec.  75.11.

[[Page 78600]]

Section 50.8 Information Collection Requirements: OMB Approval

    This section is amended to include the approved OMB information 
collection control numbers for DOC/NRC Forms AP-1, AP-A, and associated 
forms.

Section 50.78 Facility Information and Verification

    This section heading is amended. The codified text is also amended 
to require that both applicants for a construction permit or license, 
and recipients of a license submit information described in new Sec.  
75.10 and Sec.  75.11. The section also permits verification of 
information by the IAEA and requires applicants for a construction 
permit or license and recipients of a license to take other actions as 
necessary to implement the Safeguards Agreement and Additional Protocol 
as described in 10 CFR Part 75.

Section 60.8 Information Collection Requirements: OMB Approval

    This section is amended to include the approved OMB information 
collection control numbers for DOC/NRC Forms AP-1, AP-A, and associated 
forms.
    A new heading has been added after Sec.  60.46 to read, ``US/IAEA 
Safeguards Agreement.''

Section 60.47 Facility Information and Verification

    Section 60.47 is added to require applicants for a construction 
authorization or license and recipients of a license to submit 
information described in new Sec.  75.10 upon a written request by the 
Commission. The section also permits verification of information by the 
IAEA and requires applicants for a construction authorization or 
license, and recipients of a license to take other actions as necessary 
to implement the Safeguards Agreement and Additional Protocol as 
described in Part 75.

Section 61.8 Information Collection Requirements: OMB Approval

    This section is amended to include the approved OMB information 
collection control numbers for DOC/NRC Forms AP-1, AP-A, and associated 
forms.

Section 61.31 The heading of Sec.  61.31 has been amended to read, 
``US/IAEA Safeguards Agreement.''

Section 61.32 Facility Information and Verification

    Section 61.32 is added to require applicants for a license and 
recipients of a license to submit information described in new Sec.  
75.10 and Sec.  75.11. The section also permits verification of 
information by the IAEA and requires applicants for a license, and 
recipients of a license to take other actions as necessary to implement 
the Safeguards Agreement as described in Part 75.

Section 63.8 Information Collection Requirements: OMB Approval

    This section is amended to include the approved OMB information 
collection control numbers for DOC/NRC Forms AP-1, AP-A, and associated 
forms.

Section 63.46 The heading of Sec.  63.46 is amended to read, ``US/IAEA 
Safeguards Agreement.''

Section 63.47 Facility Information and Verification

    Section 63.47 is added to require applicants for a construction 
authorization or license and recipients of a license to submit 
information described in new Sec.  75.10 and Sec.  75.11. The section 
also permits verification of information by the IAEA and requires 
applicants for a construction authorization or license, and recipients 
of a license to take other actions as necessary to implement the 
Safeguards Agreement and Additional Protocol as described in Part 75.

Section 70.8 Information Collection Requirements: OMB Approval

    This section is amended to include the approved OMB information 
collection control numbers for DOC/NRC Forms AP-1, AP-A, and associated 
forms.

Section 70.21 Filing

    Paragraph (g) is amended to require applicants for a construction 
authorization or license and recipients of a license to submit 
information described in new Sec.  75.10 and Sec.  75.11. The section 
also permits verification of information by the IAEA and requires 
applicants for a construction authorization or license, and recipients 
of a license to take other actions as necessary to implement the 
Safeguards Agreement and Additional Protocol as described in Part 75.

Section 72.9 Information Collection Requirements: OMB Approval

    This section is amended to include the approved OMB information 
collection control numbers for DOC/NRC Forms AP-1, AP-A, and associated 
forms.

Section 72.13 Applicability

    This section is not amended because the ranges that specify 
applicability in Sec.  72.13(b) and (c) already encompass the new Sec.  
72.79.

Section 72.79 Facility Information and Verification

    Section 72.79 is added to require applicants for a certificate of 
compliance or license and recipients of a certificate of compliance or 
license to submit information described in new Sec.  75.10 and Sec.  
75.11. The section also permits verification of information by the IAEA 
and requires applicants for a certificate of compliance or license, and 
recipients of a certificate of compliance or license to take other 
actions as necessary to implement the Safeguards Agreement and 
Additional Protocol as described in Part 75.

Section 75.1 Purpose

    Section 75.1 is amended to include the Additional Protocol and 
clarify the types of obligations that the U.S. has made to meet the 
Safeguards Agreement.

Section 75.2 Scope

    Section 75.2 is amended to include applicants for a construction 
permit, construction authorization, or license, recipients of a 
license, and certificate holders that will be required to report 
information and provide the IAEA with access under the Safeguards 
Agreement and Additional Protocol. The scope includes facilities, the 
sites of the facilities, nuclear fuel cycle-related research and 
development locations, manufacturers of nuclear fuel cycle-related 
equipment or materials, uranium or thorium mines or concentration 
plants, locations with or importing impure source materials, locations 
where IAEA safeguards have been exempted or terminated, locations 
receiving imported material or equipment that is subject to export 
controls, and the exporting of source material and non-nuclear material 
and equipment that is subject to export controls.
    This section also provides a reference to the sections in this Part 
that contain reporting requirements, information to be provided, 
inspections, and material accounting and control requirements for 
facilities and locations.

Section 75.3 Exemptions

    Section 75.3 is amended to change the word ``Agreement'' to 
``Safeguards Agreement and the Additional Protocol. Section 75.3(b) is 
amended to reflect the intent of the Safeguards Agreement and the 
Additional Protocol more accurately.

Section 75.4 Definitions

    Section 75.4 is amended to include definitions that relate to the 
incorporation of the Additional Protocol

[[Page 78601]]

into the 10 CFR Part 75 regulations. Definitions that have been added 
include the Additional Protocol, Complementary access, Eligible 
Facilities List, Environmental sampling, Facility, Initial protocol, 
Location, Managed access, Nuclear fuel cycle-related manufacturing and 
construction, Nuclear fuel cycle-related research and development, 
Safeguards Agreement, and Subsidiary Arrangement. Other definitions 
that are amended to clarify their intent are Containment, Effective 
kilogram, Facility Attachment, Inventory change, and Transitional 
Facility Attachment. The definition of ``United States Eligibility 
Lists'' is deleted because it has been replaced by the definition of 
``Eligible Facilities List.'' The definition of ``Identification under 
the Agreement'' is deleted because it is defined in Sec.  75.11(a). The 
definition of ``Ore processing'' is also deleted. Previously, ore 
processing was excluded from Part 75, but it is now included in the 
Scope in Sec.  75.2. The definition of ``Installation'' is deleted 
because it has been replaced by the term ``Facility''.

Section 75.6 Facility and Location Reporting

    The heading of Sec.  75.6 is amended. Paragraph (a) is revised to 
include the general address for all communications and reports (unless 
otherwise specified). New Paragraph (b) requires that all necessary 
reports to the NRC under the Safeguards Agreement are to be in an 
appropriate computer-readable format. New paragraphs (c) and (d) 
specifically identify the information that must be submitted for 
facilities and locations under the Safeguards Agreement and Additional 
Protocol.

Section 75.7 Notification of IAEA Safeguards

    Section 75.7 discusses notifications of activities subject to the 
Safeguards Agreement and Additional Protocol.

Section 75.8 IAEA Inspections

    The original Sec.  75.8, Facility attachments is re-designated as 
Sec.  75.15. The new Sec.  75.8 is redesignated from Sec.  75.42. In 
addition, the new Sec.  75.8 is amended to include IAEA inspections for 
both facilities and locations. Paragraph (c) contains the requirements 
that were previously found in Sec.  75.41. The codified text is amended 
to include both the facilities and locations under the Safeguards 
Agreement and Additional Protocol. These requirements were moved based 
on the logic of discussing notification of IAEA safeguards near the 
beginning of Part 75.
    Paragraph (d) is amended to list the types of access by IAEA 
inspectors and the places to which they will have access. The section 
also includes the addition of ``Complementary Access'' in paragraph 
(d)(5) to verify the completeness and accuracy of reported information. 
Paragraph (d)(6) is added to allow IAEA access to additional licensee 
locations on which the U.S. did not submit reports to the IAEA under 
the Safeguards Agreement. Paragraph (e) is re-designated from Sec.  
75.42(d), and a new paragraph (e)(6) is added to state that the 
licensee shall permit the IAEA to perform other measures requested by 
the IAEA and approved by the NRC and other Federal agencies.
    Paragraph (f) is re-designated from Sec.  75.42(e). Paragraphs (e) 
and (f) are amended to distinguish them from complementary access. 
Paragraph (g) is added and states the type of activities that may be 
performed by IAEA in the performance of ``Complementary Access'' 
inspections at locations. These activities may include visual 
inspections, environmental sampling, use of radiation detection and 
measurement devices, applying tamper-indicating devices, performing 
sampling and nondestructive measurements, examining records, and other 
measures agreed upon by IAEA Board of Governors and following 
consultations between the IAEA and the U.S.
    For the purpose of the Additional Protocol, the U.S. as a nuclear 
weapon State, manages access as specified by procedures that may 
include the:
    (a) Removal of sensitive papers from office spaces; (b) shrouding 
of sensitive displays, stores and equipment;
    (c) Shrouding of sensitive pieces of equipment, such as computers 
or electronic systems;
    (d) Logging off computer systems and turning off data indicating 
devices;
    (e) Restriction of safeguards instrumentation or environmental 
sampling to the purpose of the access; and
    (f) In exceptional cases, giving only individual inspectors access 
to certain parts of the inspection location.

Section 75.9 Information Collection Requirements: OMB Approval

    This section is amended to include OMB approvals for the new forms 
developed to implement the Additional Protocol. The section is also 
amended to include OMB approvals for the new reporting burden under 
Part 75.
    The heading of Sec.  75.9, ``Installation Information,'' is amended 
to read, ``Facility and Location Information.''

Section 75.10 Facility Information

    This new section is added to include additional facility 
information requirements in new Sec.  75.10(b)(5). This includes a map 
of the site and information on the size of the buildings and the nature 
of the activities conducted in the building. Paragraph (d) states the 
forms that must be prepared for each facility. Paragraph (d)(7) has 
been re-designated from Sec.  75.14(a)(1) to require information on the 
facility's organizational responsibilities for material accounting and 
control. Paragraph (e) specifies how site information must be 
submitted. Paragraph (f) has been redesignated from Sec.  75.11(e) and 
amended to use the term ``facility.'' Paragraph (g) has been 
redesignated from Sec.  75.14(a)(2). Paragraph (h) requires information 
on the need to manage IAEA access to the facility.

Section 75.11 Location Information

    Section 75.11 is amended to include the information requirements 
for locations. Specific information on locations includes:
    (1) For nuclear fuel cycle related research and development, a 
general description, the location, and scale of operations;
    (2) For nuclear fuel-cycle related manufacturing and construction, 
a description of the scale of operations;
    (3) For uranium and thorium mine and concentration plants, the 
location, operational status, estimated annual production and capacity;
    (4) For impure source material, possession information;
    (5) For imports and exports of source material for non-nuclear end 
uses, the locations, quantities, chemical compositions, and use of the 
imported or exported materials;
    (6) For IAEA-exempted and terminated nuclear material, the 
quantities, uses, and locations of the nuclear material; and
    (7) For imports and exports of non-nuclear material and equipment, 
the location, quantity, and description of the equipment and materials.
    This section also lists the forms that must be prepared for each 
location and the timing of annual reports, and requires licensees to 
provide information on the need to manage IAEA access to the location.

Section 75.12 Reporting Information to IAEA

    Section 75.12 is amended to clarify the purpose of the section by 
changing the heading to ``Reporting information to IAEA.'' Other 
changes to the section

[[Page 78602]]

include adding references to Sec.  75.10 and Sec.  75.11 and using the 
terms ``facility'' and ``Safeguards Agreement.''

Section 75.13 Verification

    This section is deleted. The requirements from Sec.  75.13 have 
been merged into Sec.  75.8.

Section 75.14 Supplemental Information

    This section is deleted. The requirements from Sec.  75.14 have 
been merged into new Sec.  75.10.

Section 75.15 Facility Attachments

    This section is redesignated from Sec.  75.8. The section is moved 
to have the facility attachment information follow the sections 
discussing submittal of facility information, on which it is based. 
Also, Sec.  75.15 is amended to reference new Sec.  75.10 and to use 
the terms ``facility'' and ``Safeguards Agreement.'' Paragraph (f) is 
added to clarify that locations reporting under the Additional 
Protocol, unless located in a facility selected under Article 39(b) of 
the main text of the Safeguards Agreement, do not have facility 
attachments or transitional Facility attachments. The heading of Sec.  
75.15, ``Material Accounting and Control,'' is amended to read, 
``Material Accounting and Control for Facilities.''

Section 75.21 General Requirements

    Section 75.21 is amended to reference new Sec.  75.10 and to use 
the terms ``facility'' and ``Safeguards Agreement.''

Section 75.31 General Requirements

    Section 75.31 is amended to reference Sec.  75.7 and to use the 
terms ``facility'' and ``Safeguards Agreement.''

Section 75.32 Initial Inventory Report

    Section 75.32 is amended to use the term ``facility.'' The term 
``computer-readable'' has been removed because Sec.  75.6(b) and Sec.  
75.31 require all reports to be in appropriate computer-readable 
format.

Section 75.33 Accounting Reports

    Section 75.33 is amended to remove the term ``computer-readable'' 
because Sec.  75.6(b) and Sec.  75.31 require all reports to be in 
appropriate computer-readable format.

Section 75.34 Inventory Change Reports

    Section 75.34 is amended to use the term ``facility.'' The term 
``computer-readable'' has been removed because Sec.  75.6(b) and Sec.  
75.31 require all reports to be in appropriate computer-readable 
format.

Section 75.35 Accounting Reports

    Section 75.35 is amended to remove the term ``computer-readable'' 
because Sec.  75.6(b) and Sec.  75.31 require all reports to be in 
appropriate computer-readable format.

Section 75.36 Special Reports

    This section is amended to reference Sec.  75.7(b) and use the term 
``facility.''

Section 75.37 Disclosure of Reports to IAEA

    This section is removed because the requirements from this section 
were redundant with the requirements in Sec.  75.12.

Section 75.41 Designation

    This section is removed because the requirements have been moved to 
Sec.  75.8 which is a more logical location for this section.

Section 75.42 Inspections

    This section is removed because the requirements have been moved to 
Sec.  75.8 which is a more logical location for this section. A new 
heading is added after Sec.  75.36 and before Sec.  75.43 to read, 
``ADVANCED NOTIFICATION AND EXPENSES.''

Section 75.43 Circumstances Requiring Advance Notification

    This section is amended to reference Sec.  75.7 and use the terms 
``facility'' and ``Eligible Facilities List.''

Section 75.44 Timing of Advance Notification

    Section 75.44 is amended to use the term ``facility.''

Section 75.45 Content of Advance Notification

    Section 75.45 is amended to use the term ``facility.''

Section 75.46 Expenses

    Section 75.46 is amended to reference Sec.  75.7 and use the term 
``Safeguards Agreement.''

Section 75.53 Criminal Penalties

    Section 75.53 is amended to reference the revised sections of Part 
75.

Section 76.35 Contents of Application

    Paragraph (l) is amended to include applicants for a certificate 
and recipients of a certificate to submit information described in new 
Sec.  75.10. The section also permits verification of information by 
the IAEA and requires applicants for a certificate, and recipients of a 
certificate to take other actions as necessary to implement the 
Safeguards Agreement as described in Part 75.

Section 95.36 Access by Representatives of the International Atomic 
Energy Agency or by Participants in Other International Agreements

    Section 95.36(a) is amended to reference Sec.  75.8. Sections 
95.36(b)(1) and (b)(2) are amended to reference Sec.  75.8.

Section 110.11 Export of IAEA Safeguards Samples

    This section is amended to reference Sec.  75.8.

Section 110.54 Reporting Requirements

    This section is added to address the reporting requirement for 
exports of nuclear facilities and equipment, nuclear grade graphite for 
nuclear end use, and deuterium as required by the Additional Protocol.

Section 150.8 Information Collection Requirements: OMB Approval

    Paragraph 150.8(c)(3) is added to include the OMB approval control 
number for DOC/NRC Forms AP-1, AP-A, and associated forms.

Section 150.17a Compliance With Requirements of US/IAEA Safeguards 
Agreement

    Section 150.17a is amended to use the terms ``facility,'' 
``location,'' and ``Eligible Facilities List'' and references to 
revised sections of Part 75. The section is also amended to require 
Agreement State licensees (and applicants) that possess source or 
special nuclear material to meet the requirements of Part 75. Section 
150.17a(c) is removed because it is no longer accurate with respect to 
the current US/IAEA Safeguards Agreement. Section 150.17a(d) is 
redesignated as Sec.  150.17a(c). Also, the reference to source 
material in amounts greater than one effective kilogram is deleted 
because licensees in addition to those possessing source and special 
nuclear material may be required to report information under the 
Additional Protocol.

Notice and Comment Waiver

    Because the substance of the amendments made by this rule involves 
a foreign affairs function of the U.S., the notice and comment 
provisions of the Administrative Procedure Act do not apply [5 U.S.C. 
553(a)(1)]. These regulations codify explicit obligations established 
by treaty or statute which the NRC has no discretion or authority to 
modify, thus rendering public comment unnecessary.

[[Page 78603]]

Criminal Penalties

    For the purpose of section 223 of the Atomic Energy Act of 1954, as 
amended (AEA), the Commission is issuing the final rule to amend 10 CFR 
Parts 30, 40, 50, 60, 61, 63, 70, 72, 75, 76, 95, 110, and 150 under 
one or more of sections 161b, 161i, or 161o of the AEA. Willful 
violations of the rule will be subject to criminal enforcement.

Agreement State Compatibility

    Under the ``Policy Statement on Adequacy and Compatibility of 
Agreement State Programs'' approved by the Commission on June 30, 1997, 
and published in the Federal Register on September 3, 1997 (62 FR 
46517), this rule is classified as Compatibility Category ``NRC.'' 
Compatibility is not required for Category ``NRC'' regulations. The NRC 
program elements in this category are those that relate directly to 
areas of regulation reserved to the NRC by the Atomic Energy Act of 
1954, as amended, or the provisions of Title 10 of the Code of Federal 
Regulations. Although an Agreement State may not adopt program elements 
reserved to NRC, it may wish to inform its licensees of certain 
requirements via a mechanism that is consistent with the particular 
State's administrative procedure laws but does not confer regulatory 
authority on the State.

Voluntary Consensus Standards

    The National Technology Transfer and Advancement Act of 1995, 
Public Law 104-113, requires that Federal agencies use technical 
standards that are developed or adopted by voluntary consensus 
standards bodies unless using such a standard is inconsistent with 
applicable law or is otherwise impractical. In this final rule, the NRC 
is modifying its regulations to implement the Protocol Additional to 
the Agreement Between the United States of America and the 
International Atomic Energy Agency for the Application of Safeguards in 
the United States of America (Additional Protocol). There are no 
voluntary consensus standards available or applicable to implement the 
Additional Protocol. Additionally, this action does not constitute the 
establishment of a standard that establishes generally applicable 
requirements.

Environmental Impact: Categorical Exclusion

    The NRC has determined that this final rule is the type of action 
described in categorical exclusion 10 CFR 51.22(c)(1) and (c)(3); 
therefore, neither an environmental impact statement nor an 
environmental assessment has been prepared for this final rule.

Paperwork Reduction Act Statement

    This final rule imposes new or amended information collection 
requirements contained in 10 CFR Parts 30, 40, 50, 60, 61, 63, 70, 72, 
75, 76, 95, 110, and 150, that are subject to the Paperwork Reduction 
Act of 1995 (44 U.S.C. 3501 et seq.). These requirements were approved 
by OMB, approval numbers 3150-0017, 3150-0020, 3150-0011, 3150-0127; 
3150-0135; 3150-0199; 3150-0009; 3150-0132; 3150-0055; 3150-0047; 3150-
0036; 3150-0032, and 0694-0135.
    The burden to the public for these information collections is 
estimated to average 10 hours per response. This includes the time for 
reviewing instructions, searching existing data sources, gathering and 
maintaining the data needed, and completing and reviewing the 
information collection. The burden for the information collections in 
10 CFR Parts 30, 40, 50, 60, 61, 63, 70, 72, 75, 76, 95, 110, and 150 
are covered by the information collection requirements in 10 CFR Part 
75 (3150-0055). Send comments on any aspect of these information 
collections, including suggestions for reducing the burden, to the 
Records and FOIA/Privacy Services Branch (T-5 F53), U.S. Nuclear 
Regulatory Commission, Washington, DC 20555-0001, or by Internet 
electronic mail to [email protected]; and to the Desk 
Officer, Office of Information and Regulatory Affairs, NEOB-10202, 
(3150-0055), Office of Management and Budget, Washington, DC 20503 or 
by Internet electronic mail to [email protected].

Public Protection Notification

    The NRC may not conduct or sponsor, and a person is not required to 
respond to, a request for information for an information collection 
requirement unless the requesting document displays a currently valid 
OMB control number.

Regulatory Analysis

    A regulatory analysis has not been prepared for this regulation. 
The information reported is necessary to satisfy U.S. Government 
obligations with IAEA under the Agreement Between the United States of 
America and the International Atomic Energy Agency for the Application 
of Safeguards in the United States of America (Safeguards Agreement) 
and the Protocol Additional to the Agreement Between the United States 
of America and the International Atomic Energy Agency for the 
Application of Safeguards in the United States of America (Additional 
Protocol).

Backfit Analysis

    The NRC has determined that the backfit rule (Sec.  50.109, Sec.  
70.76, Sec.  72.62, or Sec.  76.76) does not apply to this final rule 
because this amendment does not involve any provisions that would 
impose backfits as defined in the backfit rule. Therefore, a backfit 
analysis is not required.

Small Business Regulatory Enforcement Fairness Act

    Under the Small Business Regulatory Enforcement Fairness Act of 
1996, the NRC has determined that this action is not a major rule and 
has verified this determination with the Office of Information and 
Regulatory Affairs of OMB.

List of Subjects

10 CFR Part 30

    Byproduct material, Criminal penalties, Labeling, Nuclear 
materials, Packaging and containers, Radiation protection, Specific 
licenses, Reporting and recordkeeping requirements, Scientific 
equipment.

10 CFR Part 40

    Criminal penalties, Government contracts, Hazardous materials 
transportation, Nuclear materials, Reporting and recordkeeping 
requirements, Source material, Uranium.

10 CFR Part 50

    Antitrust, Classified information, Criminal penalties, Fire 
protection, Intergovernmental relations, Nuclear power plants and 
reactors, Radiation protection, Reactor siting criteria, Reporting and 
recordkeeping requirements.

10 CFR Part 60

    Criminal penalties, High-level waste, Nuclear materials, Nuclear 
power plants and reactors, Reporting and recordkeeping requirements, 
Waste treatment and disposal.

10 CFR Part 61

    Criminal penalties, Low-level waste, Nuclear materials, Reporting 
and recordkeeping requirements, Waste treatment and disposal.

10 CFR Part 63

    Criminal penalties, High-level waste, Nuclear power plants and 
reactors, Reporting and recordkeeping requirements, Waste treatment and 
disposal.

[[Page 78604]]

10 CFR Part 70

    Criminal penalties, Hazardous materials transportation, Material 
accounting and control, Nuclear materials, Packaging and containers, 
Radiation protection, Reporting and recordkeeping requirements, 
Scientific equipment, Security measures, Special nuclear material.

10 CFR Part 72

    Administrative practice and procedure, Criminal penalties, Manpower 
training programs, Nuclear materials, Occupational safety and health, 
Penalties, Radiation protection, Reporting and recordkeeping 
requirements, Security measures, Spent fuel, Whistleblowing.

10 CFR Part 75

    Criminal penalties, Intergovernmental relations, Nuclear materials, 
Nuclear power plants and reactors, Reporting and recordkeeping 
requirements, Security measures.

10 CFR Part 76

    Certification, Criminal penalties, Radiation protection, Reporting 
and recordkeeping requirements, Security measures, Special nuclear 
material, Uranium enrichment by gaseous diffusion.

10 CFR Part 95

    Classified information, Criminal penalties, Reporting and 
recordkeeping requirements, Security measures.

10 CFR Part 110

    Administrative practice and procedure, Classified information, 
Criminal penalties, Export, Import, Intergovernmental relations, 
Nuclear materials, Nuclear power plants and reactors, Reporting and 
recordkeeping requirements, Scientific equipment.

10 CFR Part 150

    Criminal penalties, Hazardous materials transportation, 
Intergovernmental relations, Nuclear materials, Reporting and 
recordkeeping requirements, Security measures, Source material, Special 
nuclear material.

0
For the reasons set out in the preamble and under the authority of the 
Atomic Energy Act of 1954, as amended; the Energy Reorganization Act of 
1974, as amended; 5 U.S.C. 552 and 553; and the Energy Policy Act of 
2005; Pub. L. 109-58, 119 Stat. 594 (2005); the NRC is adopting the 
following amendments to 10 CFR parts 30, 40, 50, 60, 61, 63, 70, 72, 
75, 76, 95, 110, and 150.

PART 30--RULES OF GENERAL APPLICABILITY TO DOMESTIC LICENSING OF 
BYPRODUCT MATERIAL

0
1. The authority citation for part 30 continues to read as follows:

    Authority: Secs. 81, 82, 161, 182, 183, 186, 68 Stat. 935, 948, 
953, 954, 955, as amended, sec. 234, 83 Stat. 444, as amended (42 
U.S.C. 2111, 2112, 2201, 2232, 2233, 2236, 2282); secs. 201 as 
amended, 202, 206, 88 Stat. 1242, as amended, 1244, 1246 (42 U.S.C. 
5841, 5842, 5846); sec. 1704, 112 Stat. 2750 (44 U.S.C. 3504 note); 
sec. 651(e), Pub. L. 109-58, 119 Stat. 806-81D (42 U.S.C. 2014, 
2021, 2021b, 2111).
    Section 30.7 also issued under Pub. L. 95-601, sec. 10, 92 Stat. 
2951 as amended by Pub. L. 102-486, sec. 2902, 106 Stat. 3123 (42 
U.S.C. 5851). Section 30.34(b) also issued under sec. 184, 68 Stat. 
954, as amended (42 U.S.C. 2234). Section 30.61 also issued under 
sec. 187, 68 Stat. 955 (42 U.S.C. 2237).


0
2. In Sec.  30.8, paragraph (c)(3) is added to read as follows:


Sec.  30.8  Information collection requirements: OMB approval.

* * * * *
    (c) * * *
    (3) In Sec.  30.34, DOC/NRC Forms AP-1, AP-A, and associated forms 
are approved under control number 0694-0135.

0
3. In 30.34, new paragraph (k) is added to read as follows:


Sec.  30.34  Terms and conditions of licenses.

* * * * *
    (k) As required by the Additional Protocol, each specific licensee 
authorized to possess and use byproduct material shall file with the 
Commission location information described in Sec.  75.11 of this 
chapter on DOC/NRC Forms AP-1 and associated forms. The licensee shall 
also permit verification of this information by the International 
Atomic Energy Agency (IAEA) and shall take other action as may be 
necessary to implement the US/IAEA Safeguards Agreement, as described 
in part 75 of this chapter.

PART 40--DOMESTIC LICENSING OF SOURCE MATERIAL

0
4. The authority citation for part 40 continues to read as follows:

    Authority: Secs. 62, 63, 64, 65, 81, 161, 182, 183, 186, 68 
Stat. 932, 933, 935, 948, 953, 954, 955, as amended, secs. 11e(2), 
83, 84, Pub. L. 95-604, 92 Stat. 3033, as amended, 3039, sec. 234, 
83 Stat. 444, as amended (42 U.S.C. 2014(e)(2), 2092, 2093, 2094, 
2095, 2111, 2113, 2114, 2201, 2232, 2233, 2236, 2282); sec. 274, 
Pub. L. 86-373, 73 Stat. 688 (42 U.S.C. 2021); secs. 201, as 
amended, 202, 206, 88 Stat. 1242, as amended, 1244, 1246 (42 U.S.C. 
5841, 5842, 5846); sec. 275, 92 Stat. 3021, as amended by Pub. L. 
97-415, 96 Stat. 2067 (42 U.S.C. 2022); sec. 193, 104 Stat. 2835, as 
amended by Pub. L. 104-134, 110 Stat. 1321, 1321-349 (42 U.S.C. 
2243), Sec. 1704, 112 Stat. 2750 (44 U.S.C. 3504 note).
    Section 40.7 also issued under Pub. L. 95-601, sec. 10, 92 Stat. 
2951 (42 U.S.C. 5851). Section 40.31(g) also issued under sec. 122, 
68 Stat. 939 (42 U.S.C. 2152). Section 40.46 also issued under sec. 
184, 68 Stat. 954, as amended (42 U.S.C. 2234). Section 40.71 also 
issued under sec. 187, 68 Stat. 955 (42 U.S.C. 2237).


0
5. In Sec.  40.8, the introductory text to paragraph (c) and paragraphs 
(c)(2), (c)(3), and (c)(4) are revised, and paragraph (c)(5) is added 
to read as follows:


Sec.  40.8  Information collection requirements: OMB approval.

* * * * *
    (c) This Part contains information collection requirements in 
addition to those approved under the control number specified in 
paragraph (a) of this section. These information collection 
requirements and the control numbers under which they are approved are 
as follows:
* * * * *
    (2) In Sec.  40.31, DOC/NRC Forms AP-1, AP-A, and associated forms 
are approved under control numbers 0694-0135.
    (3) In Sec.  40.31, Forms N-71 and associated forms are approved 
under control number 3150-0056.
    (4) In Sec.  40.42, NRC Form 314 is approved under control number 
3150-0028.
    (5) In Sec.  40.64, DOE/NRC Form 741 is approved under control 
number 3150-0003.

0
6. In Sec.  40.31, paragraph (g) is revised to read as follows:


Sec.  40.31  Application for specific licenses.

* * * * *
    (g) An applicant for a license to possess and use source material, 
or the recipient of such a license shall report information to the 
Commission as follows:
    (1) In response to a written request by the Commission, a uranium 
or thorium processing plant, and any other applicant for a license to 
possess and use source material, shall submit facility information 
described in Sec.  75.10 of this chapter on Form N-71 and associated 
forms and site information on DOC/NRC Form AP-A, and associated forms;
    (2) As required by the Additional Protocol, a uranium or thorium 
processing plant, and any other applicant for a license to possess and 
use source material, shall submit location information described in

[[Page 78605]]

Sec.  75.11 of this chapter on DOC/NRC Form AP-1 and associated forms; 
shall permit verification of this information by the International 
Atomic Energy Agency (IAEA); and shall take other actions as may be 
necessary to implement the US/IAEA Safeguards Agreement, as described 
in Part 75 of this chapter; or
    (3) As required by the Additional Protocol, an ore processing plant 
or a facility using or storing ore concentrates or other impure source 
materials shall submit the information described in Sec.  75.11 of this 
chapter, as appropriate, on DOC/NRC Form AP-1 and associated forms; 
shall permit verification of this information by the International 
Atomic Energy Agency (IAEA); and shall take other actions as may be 
necessary to implement the US/IAEA Safeguards Agreement, as described 
in Part 75 of this chapter.
* * * * *

PART 50--DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION 
FACILITIES

0
7. The authority citation for part 50 continues to read as follows:

    Authority: Secs. 102, 103, 104, 105, 161, 182, 183, 186, 189, 68 
Stat. 936, 937, 938, 948, 953, 954, 955, 956, as amended, sec. 234, 
83 Stat. 444, as amended (42 U.S.C. 2132, 2133, 2134, 2135, 2201, 
2232, 2233, 2236, 2239, 2282); secs. 201, as amended, 202, 206, 88 
Stat. 1242, as amended, 1244, 1246 (42 U.S.C. 5841, 5842, 5846); 
sec.1704, 112 Stat. 2750 (44 U.S.C. 3504 note); sec. 651(e), Pub. L. 
109-58, 119 Stat. 806-810 (42 U.S.C. 2014, 2021, 2021b, 2111).
    Section 50.7 also issued under Pub. L. 95-601, sec. 10, 92 Stat. 
2951, (42 U.S.C. 5841). Section 50.10 also issued under Secs. 101, 
185, 68 Stat. 955, as amended (42 U.S.C. 2131, 2235); sec. 102, Pub. 
L. 91-190, 83 Stat. 853 (42 U.S.C. 4332). Sections 50.13, 50.54(dd), 
and 50.103 also issued under sec. 108, 68 Stat. 939, as amended (42 
U.S.C. 2138). Sections 50.23, 50.35, 50.55, and 50.56 also issued 
under sec. 185, 68 Stat. 955 (42 U.S.C. 2235). Sections 50.33a, 
50.55a and Appendix Q also issued under sec. 102, Pub. L. 91-190, 83 
Stat. 853 (42 U.S.C. 4332). Sections 50.34 and 50.54 also issued 
under sec. 204, 88 stat.1245 (42 U.S.C. 5844). Sections 50.58, 
50.91, and 50.92 also issued under Pub. L. 97-415, 96 Stat. 2073 (42 
U.S.C. 2239). Section 50.78 also issued under sec. 122, 68 Stat. 939 
(42 U.S.C. 2152). Sections 50.80--50.81 also issued under sec. 184, 
68 Stat. 954, as amended (42 U.S.C. 2234). Appendix F also issued 
under sec. 187, 68 Stat. 955 (42 U.S.C. 2237).


0
8. In Sec.  50.8, paragraphs (b) and (c)(2) are revised, and paragraph 
(c)(3) is added to read as follows:


Sec.  50.8  Information collection requirements: OMB approval.

* * * * *
    (b) The approved information collection requirements contained in 
this Part appear in Sec. Sec.  50.30, 50.33, 50.33a, 50.34, 50.34a, 
50.35, 50.36, 50.36a, 50.36b, 50.44, 50.46, 50.47, 50.48, 50.49, 50.54, 
50.55, 50.55a, 50.59, 50.60, 50.61, 50.62, 50.63, 50.64, 50.65, 50.66, 
50.68, 50.71, 50.72, 50.73, 50.74, 50.75, 50.78, 50.80, 50.82, 50.83, 
50.90, 50.91, and 50.120 and Appendices A, B, E, G, H, I, J, K, M, N, 
O, Q, R, and S to this Part.
    (c) * * *
    (2) In Sec.  50.78, Form N-71 and associated forms are approved 
under control number 3150-0056.
    (3) In Sec.  50.78, DOC/NRC Forms AP-1, AP-A, and associated forms 
are approved under control numbers 0694-0135.

0
9. Section 50.78 is revised to read as follows:


Sec.  50.78  Facility information and verification.

    (a) In response to a written request by the Commission, each 
applicant for a construction permit or license and each recipient of a 
construction permit or a license shall submit facility information, as 
described in Sec.  75.10 of this chapter, on Form N-71, and associated 
forms and site information on DOC/NRC Form AP-A and associated forms;
    (b) As required by the Additional Protocol, shall submit location 
information described in Sec.  75.11 of this chapter on DOC/NRC Form 
AP-1 and associated forms; and
    (c) Shall permit verification thereof by the International Atomic 
Energy Agency (IAEA) and take other action as necessary to implement 
the US/IAEA Safeguards Agreement, as described in Part 75 of this 
chapter.

PART 60--DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC 
REPOSITORIES

0
10. The authority citation for 10 CFR part 60 continues to read as 
follows:

    Authority: Secs. 51, 53, 62, 63, 65, 81, 161, 182, 183, 68 Stat. 
929, 930, 932, 933, 935, 948, 953, 954, as amended (42 U.S.C. 2071, 
2073, 2092, 2093, 2095, 2111, 2201, 2232, 2233); secs. 202, 206, 88 
Stat. 1244, 1246 (42 U.S.C. 5842, 5846); secs. 10 and 14, Pub. L. 
95-601, 92 Stat. 2951 (42 U.S.C. 2021a and 5851); sec. 102, Pub. L. 
91-190, 83 Stat. 853 (42 U.S.C. 4332); secs. 114, 121, Pub. L. 97-
425, 96 Stat. 2213g, 2228, as amended (42 U.S.C. 10134, 10141), and 
Pub. L. 102-486, sec. 2902, 106 Stat. 3123 (42 U.S.C. 5851), sec. 
1704, 112 Stat. 2750 (44 U.S.C. 3504 note).
    Section 60.9 is also issued under Pub. L. 95-601, sec. 10, 92 
Stat. 2951 as amended by Pub. L. 102-486, sec. 2902, 106 Stat. 3123 
(42 U.S.C. 5851).


0
11. In Sec.  60.8, paragraph (b) is revised and paragraph (c) is added 
to read as follows:


Sec.  60.8  Information collection requirements: Approval.

* * * * *
    (b) The approved information collection requirements contained in 
this Part appear in Sec. Sec.  60.47, 60.62, 60.63, 60.65.
    (c) In Sec.  60.47, Form N-71 and associated forms are approved 
under control number 3150-0056, and DOC/NRC Forms AP-1, AP-A, and 
associated forms are approved under control number 0694-0135.

0
12-13. A new undesignated center heading is added after Sec.  60.46 and 
new Sec.  60.47 is added to read as follows:

US/IAEA Safeguards Agreement


Sec.  60.47  Facility information and verification.

    (a) In response to a written request by the Commission, each 
applicant for a construction authorization or license and each 
recipient of a construction authorization or a license shall submit 
facility information, as described in Sec.  75.10 of this chapter, on 
Form N-71 and associated forms, and site information on DOC/NRC Form 
AP-A and associated forms;
    (b) As required by the Additional Protocol, applicants and 
licensees specified in paragraph (a) of this section shall submit 
location information described in Sec.  75.11 of this chapter on DOC/
NRC Form AP-1 and associated forms;
    (c) Shall permit verification thereof by the International Atomic 
Energy Agency (IAEA) and take other action as necessary to implement 
the US/IAEA Safeguards Agreement, as described in Part 75 of this 
chapter.

PART 61--LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE 
WASTE

0
14. The authority citation for 10 CFR part 61 continues to read as 
follows:

    Authority: Secs. 53, 57, 62, 63, 65, 81, 161, 182, 183, 68 Stat. 
930, 932, 933, 935, 948, 953, and 954, as amended (42 U.S.C. 2073, 
2077, 2092, 2093, 2095, 2111, 2201, 2232, and 2233); secs. 202, 206, 
88 Stat. 1244, 1246, (42 U.S.C. 5842, 5846); secs. 10 and 14, Pub. 
L. 95-601, 92 Stat. 2951 (42 U.S.C. 2021a and 5851) and Pub. L. 102-
486, sec. 2902, 106 Stat. 3123, (42 U.S.C. 5851); sec. 1704, 112 
Stat. 2750 (44 U.S.C. 3504 note).
    Section 61.9 is also issued under Pub. L. 95-601, sec. 10, 92 
Stat. 2951 as amended by Pub. L. 102-486, sec. 2902, 106 Stat. 3123 
(42 U.S.C. 5851).


[[Page 78606]]



0
15. In Sec.  61.8, paragraph (b) is revised and paragraph (c) is added 
to read as follows:


Sec.  61.8  Information collection requirements: OMB approval.

* * * * *
    (b) The approved information collection requirements contained in 
this Part appear in Sec. Sec.  61.3, 61.6, 61.9, 61.10, 61.11, 61.12, 
61.13, 61.14, 61.15, 61.16, 61.20, 61.22, 61.24, 61.26, 61.27, 61.28, 
61.30, 61.31, 61.32, 61.53, 61.55, 61.57, 61.58, 61.61, 61.62, 61.63, 
61.72, and 61.80.
    (c) In Sec.  61.32, Form N-71 and associated forms are approved 
under control number 3150-0056, and DOC/NRC Forms AP-1, AP-A, and 
associated forms are approved under control numbers 0694-0135.

0
16-17. A new undesignated center heading is added after Sec.  61.31 and 
new Sec.  61.32 is added to read as follows:

US/IAEA Safeguards Agreement


Sec.  61.32  Facility information and verification.

    (a) In response to a written request by the Commission, each 
applicant for a license and each recipient of a license shall submit 
facility information, as described in Sec.  75.10 of this chapter, on 
Form N-71 and associated forms and site information on DOC/NRC Form AP-
A, and associated forms;
    (b) As required by the Additional Protocol, applicants and 
licensees specified in paragraph (a) of this section shall submit 
location information described in Sec.  75.11 of this chapter on DOC/
NRC Form AP-1 and associated forms; and
    (c) Shall permit verification thereof by the International Atomic 
Energy Agency (IAEA) and take other action as necessary to implement 
the US/IAEA Safeguards Agreement, as described in Part 75 of this 
chapter.

PART 63--DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC 
REPOSITORY AT YUCCA MOUNTAIN, NEVADA

0
18. The authority citation for part 63 continues to read as follows:

    Authority: Secs. 51, 53, 62, 63, 65, 81, 161, 182, 183, 68 Stat. 
929, 930, 932, 933, 935, 948, 953, 954, as amended (42 U.S.C. 2071, 
2073, 2092, 2093, 2095, 2111, 2201, 2232, 2233); secs. 202, 206, 88 
Stat.1244, 1246 (42 U.S.C. 5842, 5846); secs. 10 and 14, Pub. L. 95-
601, 92 Stat. 2951 (42 U.S.C. 2021a and 5851); sec. 102, Pub. L. 91-
190, 83 Stat. 853 (42 U.S.C. 4332); secs. 114, 121, Pub. L. 97-425, 
96 Stat. 2213g, 2238, as amended (42 U.S.C. 10134, 10141), and Pub. 
L. 102-486, sec. 2902, 106 Stat. 3123 (42 U.S.C. 5851); sec. 1704, 
112 Stat. 2750 (44 U.S.C. 3504 note).


0
19. In Sec.  63.8, paragraph (b) is revised and paragraph (c) is added 
to read as follows:


Sec.  63.8  Information collection requirements: OMB approval.

* * * * *
    (b) The approved information collection requirements contained in 
this Part appear in Sec. Sec.  63.47, 63.62, 63.63, and 63.65.
    (c) In Sec.  63.47, Form N-71 and associated forms are approved 
under control number 3150-0056, and DOC/NRC Forms AP-1, AP-A, and 
associated forms are approved under control numbers 0694-0135.

0
20-21. A new undesignated center heading is added after Sec.  63.46 and 
new Sec.  63.47 is added to read as follows:

US/IAEA Safeguards Agreement


Sec.  63.47  Facility information and verification.

    (a) In response to a written request by the Commission, each 
applicant for a construction authorization or license and each 
recipient of a construction authorization or a license shall submit 
facility information, as described in Sec.  75.10 of this chapter, on 
Form N-71 and associated forms and site information on DOC/NRC Form AP-
A and associated forms;
    (b) As required by the Additional Protocol, applicants and 
licensees specified in paragraph (a) of this section shall submit 
location information described in Sec.  75.11 of this chapter on DOC/
NRC Form AP-1 and associated forms;
    (c) Shall permit verification thereof by the International Atomic 
Energy Agency (IAEA) and take other action as necessary to implement 
the US/IAEA Safeguards Agreement, as described in Part 75 of this 
chapter.

PART 70--DOMESTIC LICENSING OF SPECIAL NUCLEAR MATERIAL

0
22. The authority citation for 10 CFR part 70 continues to read as 
follows:

    Authority: Secs. 51, 53, 161, 182, 183, 68 Stat. 929, 930, 948, 
953, 954, as amended, sec. 234, 83 Stat. 444, as amended, (42 U.S.C. 
2071, 2073, 2201, 2232, 2233, 2282, 2297f); secs. 201, as amended, 
202, 204, 206, 88 Stat. 1242, as amended, 1244, 1245, 1246 (42 
U.S.C. 5841, 5842, 5845, 5846). Sec. 193, 104 Stat. 2835 as amended 
by Pub. L. 104-134, 110 Stat. 1321, 1321-349 (42 U.S.C. 2243), sec. 
1704, 112 Stat. 2750 (44 U.S.C. 3504 note).
    Sections 70.1(c) and 70.20a(b) also issued under secs. 135, 141, 
Pub. L. 97-425, 96 Stat. 2232, 2241 (42 U.S.C. 10155, 10161). 
Section 70.7 also issued under Pub. L. 95-601, sec. 10, 92 Stat. 
2951 as amended by Pub. L. 102-486, sec. 2902, 106 Stat. 3123 (42 
U.S.C. 5851). Section 70.21(g) also issued under sec. 122, 68 Stat. 
939 (42 U.S.C. 2152). Section 70.31 also issued under sec. 57d, Pub. 
L. 93-377, 88 Stat. 475 (42 U.S.C. 2077). Sections 70.36 and 70.44 
also issued under sec. 184, 68 Stat. 954, as amended (42 U.S.C. 
2234). Section 70.81 also issued under secs. 186, 187, 68 Stat. 955 
(42 U.S.C. 2236, 2237). Section 70.82 also issued under sec. 108, 68 
Stat. 939, as amended (42 U.S.C. 2138).


0
23. In Sec.  70.8, paragraph (c)(1) is revised and (c)(3) is added to 
read as follows:


Sec.  70.8  Information collection requirements: OMB approval.

* * * * *
    (c) * * *
    (1) In Sec.  70.21(g), Form N-71 and associated forms are approved 
under control number 3150-0056.
* * * * *
    (3) In Sec.  70.21(g), DOC/NRC Forms AP-1, AP-A, and associated 
forms are approved under control number 0694-0135.

0
24. In Sec.  70.21, paragraph (g) is revised to read as follows:


Sec.  70.21  Filing.

* * * * *
    (g)(1) In response to a written request by the Commission, each 
applicant for a construction authorization or license and each 
recipient of a construction authorization or a license to possess and 
use special nuclear material shall submit facility information, as 
described in Sec.  75.10 of this chapter, on Form N-71 and associated 
forms and site information on DOC/NRC Form AP-A and associated forms;
    (2) As required by the Additional Protocol, applicants and 
licensees specified in paragraph (a) of this section shall submit 
location information described in Sec.  75.11 of this chapter on DOC/
NRC Form AP-1 and associated forms; and
    (3) Shall permit verification thereof by the International Atomic 
Energy Agency (IAEA) and take other action as necessary to implement 
the US/IAEA Safeguards Agreement, as described in Part 75 of this 
chapter.
* * * * *

PART 72--LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF 
SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-
RELATED GREATER THAN CLASS C WASTE

0
25. The authority citation for part 72 continues to read as follows:

    Authority: Secs. 51, 53, 57, 62, 63, 65, 69, 81, 161, 182, 183, 
184, 186, 187, 189, 68 Stat. 929, 930, 932, 933, 934, 935, 948, 953, 
954, 955, as amended; sec. 234, 83 Stat. 444, as

[[Page 78607]]

amended (42 U.S.C. 2071, 2073, 2077, 2092, 2093, 2095, 2099, 2111, 
2201, 2232, 2233, 2234, 2236, 2237, 2238, 2282); sec. 274, Pub. L. 
86-373, 73 Stat. 688, as amended (42 U.S.C. 2021); sec. 201, as 
amended, 202, 206, 88 Stat. 1242, as amended, 1244, 1246 (42 U.S.C. 
5841, 5842, 5846); Pub. L. 95-601, sec. 10, 92 Stat. 2951, as 
amended by Pub. L. 102-486, sec. 7902, 106 Stat. 3123 (42 U.S.C. 
5851); sec. 102, Pub. L. 91-190, 83 Stat. 853 (42 U.S.C. 4332); 
secs. 131, 132, 133, 135, 137, 141, Pub. L. 97-425, 96 Stat. 2229, 
2230, 2232, 2241; sec. 148, Pub. L. 100-203, 101 Stat. 1330-235 (42 
U.S.C. 10151, 10152, 10153, 10155, 10157, 10161, 10168); sec. 1704, 
112 Stat. 2750 (44 U.S.C. 3504 note); sec. 651(e), Pub. L. 109-58, 
119 Stat. 806-10 (42 U.S.C. 2014, 2021, 2021b, 2111).
    Section 72.44(g) also issued under secs. 142(b) and 148(c), (d), 
Pub. L. 100-203, 101 Stat. 1330-232, 1330-236 (42 U.S.C. 10162(b), 
10168(c), (d)). Section 72.46 also issued under sec. 189, 68 Stat. 
955 (42 U.S.C. 2239); sec. 134, Pub. L. 97-425, 96 Stat. 2230 (42 
U.S.C. 10154). Section 72.96(d) also issued under sec. 145(g), Pub. 
L. 100-203, 101 Stat. 1330-235 (42 U.S.C. 10165(g)). Subpart J also 
issued under secs. 2(2), 2(15), 2(19), 117(a), 141(h), Pub. L. 97-
425, 96 Stat. 2202, 2203, 2204, 2222, 2244 (42 U.S.C. 10101, 
10137(a), 10161(h)). Subparts K and L are also issued under sec. 
133, 98 Stat. 2230 (42 U.S.C. 10153) and sec. 218(a), 96 Stat. 2252 
(42 U.S.C. 10198).


0
26. In Sec.  72.9, paragraph (c) is added to read as follows:


Sec.  72.9  Information collection requirements: OMB approval.

* * * * *
    (c) In Sec.  72.79, Form N-71 and associated forms are approved 
under control number 3150-0056, and DOC/NRC Forms AP-1, AP-A, and 
associated forms are approved under control number 0694-0135.

0
27. Section 72.79 is added to read as follows:


Sec.  72.79  Facility information and verification.

    (a) In response to a written request by the Commission, each 
applicant for a certificate of compliance or license and each recipient 
of a certificate of compliance or specific or general license shall 
submit facility information, as described in Sec.  75.10 of this 
chapter, on Form N-71 and associated forms and site information on DOC/
NRC Form AP-A and associated forms;
    (b) Shall submit location information described in Sec.  75.11 of 
this chapter on DOC/NRC Form AP-1 and associated forms; and
    (c) Shall permit verification thereof by the International Atomic 
Energy Agency (IAEA) and take other action as necessary to implement 
the US/IAEA Safeguards Agreement, as described in Part 75 of this 
chapter.

PART 75--SAFEGUARDS ON NUCLEAR MATERIAL--IMPLEMENTATION OF US/IAEA 
AGREEMENT

0
28. The authority citation for part 75 is amended to read as follows:

    Authority: Secs. 53, 63, 103, 104, 122, 161, 68 Stat. 930, 932, 
936, 937, 939, 948, as amended (42 U.S.C. 2073, 2093, 2133, 2134, 
2152, 2201); sec. 201, 88 Stat. 1242, as amended (42 U.S.C. 5841); 
sec. 1704, 112 Stat. 2750 (44 U.S.C. 3504 note).
    Section 75.4 also issued under secs. 135, 141, Public Law 97-
425, 96 Stat. 2232, 2241 (42 U.S.C. 10155, 10161).


0
29. Section 75.1 is revised to read as follows:


Sec.  75.1  Purpose.

    The purpose of this part is to implement the requirements 
established by treaties between the United States and the International 
Atomic Energy Agency (IAEA). These treaties include the Agreement 
Between the United States of America and the International Atomic 
Energy Agency for the Application of Safeguards in the United States of 
America (Safeguards Agreement) and the Protocol Additional to the 
Agreement Between the United States of America and the International 
Atomic Energy Agency for the Application of Safeguards in the United 
States of America (Additional Protocol). This part contains 
requirements to ensure that the United States meets its nuclear non-
proliferation obligations under these US/IAEA Safeguards treaties. 
These obligations include providing information to the IAEA on the 
place of applicant, licensee, or certificate holder activities; 
information on source and special nuclear materials; and access to the 
place of applicant, licensee, or certificate holder activities. These 
obligations are similar to the obligations accepted by other countries.

0
30. Section 75.2 is revised to read as follows:


Sec.  75.2  Scope.

    (a) All persons licensed by the Nuclear Regulatory Commission or an 
Agreement State, or who hold a certificate of compliance, or 
construction permit or authorization issued by the Nuclear Regulatory 
Commission are subject to the requirements of this part. These 
requirements also apply to all persons who have filed an application 
with the NRC to construct a facility or to receive source or special 
nuclear material. Locations determined by the U.S. Government to be 
associated with activities or information of direct national security 
significance to the United States are excluded from these requirements. 
Specifically, these requirements pertain to the following locations and 
activities of licensees and certificate holders:
    (1) A facility, as defined in Sec.  75.4, and the site of the 
facility;
    (2) A location performing nuclear fuel cycle-related research and 
development, as defined in Sec.  75.4;
    (3) A location manufacturing, assembling, or constructing nuclear 
fuel cycle-related equipment or materials as defined in Sec.  75.4;
    (4) A location of a uranium or thorium mine or concentration plant 
(e.g., in-situ leach mines and activities involving ore processing);
    (5) A location importing or possessing ``impure'' source material 
[i.e., source material not in the form of purified chemical products 
(e.g., UF6, U metal, UO2)];
    (6) A location possessing source or special nuclear material on 
which IAEA safeguards have been exempted or terminated;
    (7) A location receiving imports of material or equipment that is 
subject to export controls; and
    (8) The activity of exporting source materials for non-nuclear 
purposes or exporting of non-nuclear material or equipment that is 
subject to export controls.
    (b) Facilities referred to in Sec.  75.2(a)(1) are also subject to 
the reporting requirements of Sec.  75.6(b) and (c), IAEA inspections 
in Sec.  75.8, Facility information in Sec.  75.10, and the Material 
Accounting and Control requirements in Sec. Sec.  75.21 through 75.45.
    (c) Locations referred to in Sec.  75.2(a)(2) through 75.2(a)(7) 
are also subject to the reporting requirements of Sec.  75.6(b) and 
(d), and IAEA inspections in Sec.  75.8, and location information in 
Sec.  75.11.

0
31. Section 75.3 is revised to read as follows:


Sec.  75.3  Exemptions.

    (a) The Commission may, upon application of any interested person 
or upon its own initiative, grant exemptions from the requirements of 
this Part that it determines are authorized by law and consistent with 
the Safeguards Agreement or the Additional Protocol, are not inimical 
to the common defense and security, and are otherwise in the public 
interest.
    (b) Without limiting the generality of paragraph (a) of this 
section, the U.S. Government may request from the IAEA an exemption 
with respect to nuclear material of the following types:
    (1) Source and special nuclear material in gram quantities or less 
as a sensing component in instruments;

[[Page 78608]]

    (2) Nuclear material used in non-nuclear activities; and
    (3) Plutonium with an isotopic concentration of plutonium-238 
exceeding 80 percent.

0
32. In Sec.  75.4:
0
a. The paragraph designations are removed;
0
b. The definitions of Identification under the Agreement, Installation, 
Ore processing, and United States Eligibility List are removed;
0
c. The definitions of Additional Protocol; Complementary access; 
Eligible Facilities List; Environmental sampling; Facility; Initial 
Protocol; Location; Managed access; Nuclear fuel-cycle related 
manufacturing and construction; Nuclear fuel-cycle related research and 
development; Safeguards Agreement; and Subsidiary arrangement are added 
in alphabetical order; and
0
d. The definitions of Containment, Effective kilogram, Facility 
attachment, Inventory change, Surveillance, and Transitional facility 
attachment are revised.
    The additions and revisions read as follows:


Sec.  75.4  Definitions.

* * * * *
    Additional Protocol means the Protocol Additional to the Agreement 
Between the United States of America and the International Atomic 
Energy Agency for the Application of Safeguards in the United States of 
America, concluded between the United States and the IAEA in Vienna, 
Austria, on June 12, 1998, that follows the provisions of INFCIRC/540.
* * * * *
    Complementary Access means access provided to IAEA inspectors in 
accordance with the provisions of the Additional Protocol.
    Containment (with respect to IAEA safeguards) means containers, 
devices, or structures that are used to prevent undetected access to or 
movement of nuclear material.
    Effective Kilogram means a unit used in safeguarding nuclear 
material. The quantity is:
    (1) For special nuclear material: The amount specified in Sec.  
70.4 of this chapter.
    (2) For source material: The amount specified in Sec.  40.4 of this 
chapter.
    Eligible Facilities List means the list of facilities that are 
eligible for IAEA safeguards inspections under the US/IAEA Safeguards 
Agreement, which the Secretary of State or his designee last submitted 
for Congressional review and which was not disapproved. A copy of this 
list is available for inspection at the NRC Web site, http://www.nrc.gov, and/or at the NRC Public Document Room. In accordance with 
the provisions of the Safeguards Agreement, facilities of direct 
national security significance are excluded from the Eligible 
Facilities List.
    Environmental Sampling (with respect to IAEA Safeguards) means the 
collection of environmental samples (e.g., air, water, vegetation, 
soil, or smears from surfaces) at a location specified by the IAEA for 
the purpose of assisting the IAEA to draw a conclusion about the 
absence of undeclared nuclear material or nuclear activities.
    Facility means:
    (1) A production facility or utilization facility as defined in 
Sec.  50.2 of this chapter;
    (2) A plant that converts nuclear material from one chemical form 
to another (e.g., Uranium hexafluoride plant);
    (3) A fuel fabrication plant;
    (4) An enrichment plant or isotope separation plant for the 
separation of isotopes of uranium or to increase the abundance of 
235U.
    (5) An installation designed to store nuclear material, such as an 
independent spent fuel storage installation (ISFSI) or a monitored 
retrievable storage installation (MRS) as defined in Sec.  72.3 of this 
chapter; or
    (6) Any plant or location where the possession of more than 1 
effective kilogram of nuclear material is licensed pursuant to Parts 
40, 50, 60, 61, 63, 70, 72, 76, or 150 of this chapter or an Agreement 
State license.
    Facility Attachment means a document negotiated between the U.S. 
and the IAEA that establishes safeguards commitments for a particular 
facility.
    IAEA means the International Atomic Energy Agency or its duly 
authorized representatives.
    IAEA Material Balance Area means an area established for IAEA 
material accounting purposes, so that:
    (1) The quantity of nuclear material in each transfer into or out 
of each material balance area can be determined; and
    (2) The physical inventory of nuclear material in each material 
balance area can be determined when necessary in accordance with 
specified procedures.
    Initial Protocol means the protocol to the Agreement Between the 
United States of America and the International Atomic Energy Agency for 
the Application of Safeguards in the United States of America that was 
concluded with the IAEA and provides the IAEA the right to select a 
facility for material accounting reporting only without the right to 
conduct inspections.
    Inventory Change means an increase or decrease in the quantity of 
source or special nuclear material in an IAEA material balance area.
    Key Measurement Point means a location where source or special 
nuclear material appears in such a form that it may be measured to 
determine material flow or inventory. Key measurement points include, 
but are not limited to, the inputs and outputs (including measured 
discards) and storages in IAEA material balance areas.
    Location means any geographical point or area identified by the 
United States in its declarations, or by the IAEA resulting from a 
question, under the Additional Protocol.
    Managed Access means procedures to protect sensitive or classified 
information or, to meet safety or physical protection requirements, 
while allowing the IAEA to accomplish the purpose of a complementary 
access request.
    Nuclear Fuel Cycle-Related Manufacturing and Construction means 
those activities related to the manufacture or construction of any of 
the following: Components for separating the isotopes of uranium or 
enriching uranium in the isotope 235, zirconium tubes, heavy water or 
deuterium, nuclear-grade graphite, irradiated fuel casks and canisters, 
reactor control rods, criticality safe tanks and vessels, irradiated 
fuel element chopping machines, and hot cells.
    Nuclear Fuel Cycle-Related Research and Development means those 
activities specifically related to any process or system development 
aspect of any of the following: Conversion of nuclear material; 
enrichment of nuclear material; nuclear fuel fabrication; reactors; 
critical facilities; reprocessing of nuclear fuel; and processing of 
intermediate or high-level waste containing plutonium, high-enriched 
uranium, or uranium-233.
    Nuclear Material means any source material or any special nuclear 
material.
    Safeguards Agreement means the Agreement Between the United States 
and the IAEA for the Application of Safeguards in the United States, 
and all protocols and subsidiary arrangements to the agreement.
    Subsidiary Arrangement means a document, negotiated between the 
U.S. and the IAEA, that formally defines the technical and 
administrative procedures to implement the measures contained in the 
Safeguards Agreement.
    Surveillance (with respect to IAEA Safeguards) means instrumental 
or human observation aimed at detecting the movement of nuclear 
material.
    Transitional Facility Attachment means that portion of the 
``Transitional

[[Page 78609]]

Subsidiary Arrangements to the Protocol to the Safeguards Agreement'' 
that pertains to a particular facility that has been identified under 
the Initial Protocol.

0
33. Section 75.6 is revised to read as follows:


Sec.  75.6  Facility and location reporting.

    (a) Except where otherwise specified, all communications concerning 
the regulations in this Part shall be addressed to the U.S. Nuclear 
Regulatory Commission, ATTN: Document Control Desk, Washington, DC 
20555-0001. Written communications may be delivered in person to the 
Nuclear Regulatory Commission at One White Flint North, 11555 Rockville 
Pike, Rockville, MD 20852-2738 between 7:30 a.m. and 4:15 p.m. eastern 
time. If a submittal deadline falls on a Saturday, Sunday, or a Federal 
holiday, the next Federal working day becomes the official due date.
    (b) Each applicant, licensee, or certificate holder who has been 
given notice by the Commission in writing that its facility or location 
is required to report under the Safeguards Agreement shall make its 
initial and subsequent reports, including attachments, in an 
appropriate format defined in the instructions.
    (c) Facilities--Specific information regarding facilities is to be 
reported as follows:

----------------------------------------------------------------------------------------------------------------
                     Item                           Section                    Manner of delivery
----------------------------------------------------------------------------------------------------------------
Initial Inventory Report......................           75.32  As specified by printed instructions for
                                                                 preparation of DOE/NRC Form-742.
Inventory Change Reports......................           75.34  As specified by printed instructions for
                                                                 preparation of DOE/NRC Form-741 and Form-740M.
Material Status Reports.......................           75.35  As specified by printed instructions for
                                                                 preparation of DOE/NRC Form-742, Form-742C, and
                                                                 Form-740M.
Special Reports...............................           75.36  To the NRC Headquarters Operations Center.
Facility information..........................        75.10(d)  As specified by printed instructions for Form N-
                                                                 71 and associated forms.
Site information..............................        75.10(e)  As specified by printed instructions for
                                                                 preparation of DOC/NRC Form AP-A and associated
                                                                 forms.
----------------------------------------------------------------------------------------------------------------

    (d) Locations--Specific information regarding locations is to be 
reported as follows:

----------------------------------------------------------------------------------------------------------------
                     Item                           Section                    Manner of delivery
----------------------------------------------------------------------------------------------------------------
Fuel cycle-related research and development        75.11(c)(1)  As specified by printed instructions for
 information.                                                    preparation of DOC/NRC Form AP-1 and associated
                                                                 forms.
Fuel cycle-related manufacturing and               75.11(c)(2)  As specified by printed instructions for
 construction information.                                       preparation of DOC/NRC Form AP-1 and associated
                                                                 forms.
Mines and concentration plant information.....     75.11(c)(3)  As specified by printed instructions for
                                                                 preparation of DOC/NRC Form AP-1 and associated
                                                                 forms.
Impure source material possession information.     75.11(c)(4)  As specified by printed instructions for
                                                                 preparation of DOC/NRC Form AP-1 and associated
                                                                 forms.
Imports and exports of source material for non-    75.11(c)(5)  As specified by printed instructions for
 nuclear end uses.                                               preparation of DOC/NRC Form AP-1 and associated
                                                                 forms.
IAEA safeguards-exempted and terminated            75.11(c)(6)  As specified by printed instructions for
 nuclear material information.                                   preparation of DOC/NRC Form AP-1 and associated
                                                                 forms.
Imports and exports of non-nuclear material        75.11(c)(7)  As specified by printed instructions for
 and equipment.                                                  preparation of DOC/NRC Form AP-1 and associated
                                                                 forms.
----------------------------------------------------------------------------------------------------------------

0
34. Section 75.7 is revised to read as follows:


Sec.  75.7  Notification of IAEA safeguards.

    (a) The licensee must inform the NRC:
    (1) Before the licensee begins an activity that may be subject to 
the Safeguards Agreement; or
    (2) Within 30 days of beginning an activity subject to the 
Additional Protocol.
    (b) The Commission, by written notice, will inform the applicant, 
licensee, or certificate holder of those facilities subject to the 
application of IAEA safeguards.
    (c) Such notice is effective until the Commission informs the 
licensee or certificate holder, in writing, that its facility or 
location is no longer so designated. Whenever a previously designated 
facility or location is no longer subject to the application of IAEA 
safeguards, the Commission will give the licensee or certificate holder 
prompt notice to that effect.

0
35. Section 75.8 is revised to read as follows:


Sec.  75.8  IAEA inspections.

    (a) As provided in the Safeguards Agreement and Additional 
Protocol, inspections may be ad hoc, routine, special, or a 
complementary access (or a combination of the foregoing). The 
objectives of the IAEA inspectors in the performance of inspections are 
as follows:
    (1) Ad hoc inspections to verify information contained in the 
licensee's, applicant's, or certificate holder's facility information 
or initial inventory report, or to identify and verify changes in the 
situation which have occurred after the initial inventory reporting 
date at any location where the initial inventory report or any 
inspections carried out indicate that nuclear material subject to 
safeguards under the Safeguards Agreement may be present;
    (2) Ad hoc inspections to identify and, if possible, verify the 
quantity and composition of the nuclear material referred to in 
notifications specified under Sec.  75.43(b) (pertaining to exports) or 
Sec.  75.43(c) (pertaining to imports) at any place where nuclear 
material may be located;
    (3) Routine inspections are conducted as specified by the facility 
attachments referred to in Sec.  75.15 to verify nuclear material and 
as-built facility design at the strategic points and the records 
maintained under this part;

[[Page 78610]]

    (4) Special inspections may be conducted at any of the places 
specified above and any additional places where the Commission (in 
coordination with other Federal agencies), in response to an IAEA 
request, finds access to be necessary;
    (5) Complementary access may be conducted at a location, using 
measures permitted under the Additional Protocol and as specified by 
managed access procedures, for the IAEA inspectors to verify the 
completeness and accuracy of the information provided on DOC/NRC Form 
AP-1 or AP-A and associated forms; and
    (6) Complementary access must be provided at any additional 
locations where the Commission (in coordination with other Federal 
agencies), in response to an IAEA request, finds access to be 
necessary.
    (b) The NRC will notify the applicant, licensee, or certificate 
holder of each such inspection or complementary access in writing as 
soon as possible after receiving the IAEA's notice from the U.S. 
Department of State. The applicant, licensee, or certificate holder 
should consult with the Commission immediately if the inspection or 
complementary access would unduly interfere with its activities or if 
its key personnel cannot be available.
    (c) Each applicant, licensee, or certificate holder subject to the 
provisions of this part shall recognize as a duly authorized 
representative of the IAEA any person bearing IAEA credentials for whom 
the NRC has provided written or electronic authorization that the IAEA 
representative is permitted to conduct inspection activities on 
specified dates. If the IAEA representative's credentials have not been 
confirmed by the NRC, the applicant, licensee, or certificate holder 
shall not admit the person until the NRC has confirmed the person's 
credentials. The applicant, licensee, or certificate holder shall 
notify the Commission promptly, by telephone, whenever an IAEA 
representative arrives at a facility or location without advance 
notification. The applicant, licensee, or certificate holder shall also 
contact the Commission, by telephone, within one hour with respect to 
the credentials of any person who claims to be an IAEA representative 
and shall accept written or electronic confirmation of the credentials 
from the NRC. Confirmation may be requested through the NRC Operations 
Center (commercial telephone number 301-816-5100).
    (d) Each applicant, licensee, or certificate holder subject to the 
provisions of this part shall allow the IAEA opportunity to conduct an 
NRC-approved inspection or complementary access of the facility or 
location to verify the information submitted under Sec. Sec.  75.10, 
75.11, and 75.31 through 75.43. The NRC will assign an employee to 
accompany IAEA representative(s) at all times during the inspection or 
complementary access. The applicant, licensee, or certificate holder 
may accompany IAEA representatives who inspect or access the facility 
or location. The IAEA representatives should not be delayed or 
otherwise impeded in the exercise of their duties.
    (e) Each applicant, licensee, or certificate holder shall permit 
the IAEA, in conducting an ad hoc, routine, or special inspection at a 
facility, to:
    (1) Examine records kept under Sec.  75.21;
    (2) Observe that the measurements of nuclear material at key 
measurement points for material balance accounting are representative;
    (3) Verify the function and calibration of instruments and other 
measurement control equipment;
    (4) Observe that samples at key measurement points for material 
balance accounting are taken in accordance with procedures that produce 
representative samples, observe the treatment and analysis of the 
samples, and obtain duplicates of these samples;
    (5) Arrange to use the IAEA's own equipment for independent 
measurement and surveillance; and
    (6) Perform other measures requested by the IAEA and approved by 
the NRC.
    (f) Each applicant, licensee, or certificate holder shall, at the 
request of an IAEA inspector during an ad hoc, routine, or special 
inspection at a facility:
    (1) Ship material accountancy samples taken for the IAEA's use, in 
accordance with applicable packaging and export licensing regulations, 
by the method of carriage and to the address specified by the 
inspector; and
    (2) Take other actions contemplated by the Safeguards Agreement, 
and included in the safeguards approach approved by the United States 
and the IAEA, including but not limited to the following examples:
    (i) Enabling the IAEA to arrange to install its equipment for 
measurement and surveillance;
    (ii) Enabling the IAEA to apply its seals and other identifying and 
tamper-indicating devices to containers;
    (iii) Making additional measurements and taking additional samples 
for the IAEA's use;
    (iv) Analyzing the IAEA's standard analytical samples;
    (v) Using appropriate standards in calibrating instruments and 
other equipment; and
    (vi) Carrying out other calibrations.
    (g) Each applicant, licensee, or certificate holder shall permit 
the IAEA, in conducting complementary access at a location, under the 
provisions of the Additional Protocol and subsidiary arrangements, to:
    (1) Perform visual observations and record observations as 
photographs;
    (2) Conduct environmental sampling, when authorized by the U.S. 
Government;
    (3) Use radiation detection and measurement devices;
    (4) Apply seals and other identifying and tamper-indicating 
devices;
    (5) Perform nondestructive measurements and sampling;
    (6) Examine records relevant to quantities, origin, and disposition 
of materials to confirm the accuracy of the information provided under 
Sec.  75.11;
    (7) Examine safeguards-relevant production and shipping records; 
and
    (8) Other objective measures that have been demonstrated to be 
technically feasible and the use of which has been agreed upon by the 
IAEA Board of Governors and following consultations between the IAEA 
and U.S. Government.
    (h) Nothing in this section requires or authorizes an applicant, 
licensee, or certificate holder to carry out any operation that would 
otherwise constitute a violation of the terms of any applicable 
license, regulation, or order of the Commission.

0
36. In Sec.  75.9, paragraphs (a) and (b), the introductory text to 
paragraph (c) and paragraph (c)(1) are revised, and paragraph (c)(6) is 
added to read as follows:


Sec.  75.9  Information collection requirements: OMB approval.

    (a) The Nuclear Regulatory Commission, or another U.S. Government 
agency, has submitted the information collection requirements contained 
in this Part to the Office of Management and Budget (OMB) for approval 
as required by the Paperwork Reduction Act (44 U.S.C. 3501 et seq.). 
The NRC may not conduct or sponsor, and a person is not required to 
respond to, a collection of information unless it displays a currently 
valid OMB control number. OMB has approved the information collection 
requirements contained in this Part under control number 3150-0055.
    (b) The approved information collection requirements contained in 
this Part appear in Sec. Sec.  75.6, 75.7a, 75.10, 75.11, 75.21, 75.22, 
75.23, 75.24, 75.31,

[[Page 78611]]

75.32, 75.33, 75.34, 75.35, 75.36, 75.43, 75.44, and 75.45.
    (c) This Part contains information collection requirements in 
addition to those approved under the control number specified in 
paragraph (a) of this section. These information collection 
requirements and the control numbers under which they are approved are 
as follows:
    (1) In Sec.  75.10, Form N-71 and associated forms are approved 
under control number 3150-0056.
* * * * *
    (6) In Sec. Sec.  75.10 and 75.11, DOC/NRC Forms AP-1, AP-A, and 
associated forms are approved under control number 0694-0135.


0
37-38. The undesignated center heading ``Installation Information'' 
after Sec.  75.9 is revised and new Sec.  75.10 is added to read as 
follows:

Facility and Location Information


Sec.  75.10  Facility information.

    (a) Each applicant, licensee, or certificate holder subject to the 
provisions of this Part shall submit facility information, in response 
to written notification from the Commission, with respect to any 
facility that the Commission indicates has been identified under the 
Safeguards Agreement, the Initial Protocol to the Agreement, or meets 
the Additional Protocol reporting criteria, and in which the applicant, 
licensee, or certificate holder carries out licensed activities. (The 
Commission request must state whether the facility has been identified 
under Article 39(b) of the principal text of the Safeguards Agreement 
or Article 2(a) of the Initial protocol.) The applicant, licensee, or 
certificate holder shall submit the requested information to the 
Commission within the period specified in the Commission's request.
    (b) Facility information includes:
    (1) The identification of the facility, stating its general 
character, purpose, nominal capacity (thermal power level, in the case 
of power reactors), and geographic location, and the name and address 
to be used for routine purposes;
    (2) A description of the general arrangement of the facility with 
reference, to the extent feasible, to the form, location and flow of 
nuclear material, and to the general layout of important items of 
equipment which use, produce, or process nuclear material;
    (3) A description of features of the facility relating to material 
accounting, containment, and surveillance;
    (4) A description of the existing and proposed procedures at the 
facility for nuclear material accounting and control, with special 
reference to material balance areas established by the licensee, 
measurement of flow, and procedures for physical inventory taking (As 
part of this description, the applicant, licensee, or certificate 
holder may identify a process step involving information that it deems 
to be commercially sensitive and for which it proposes that a special 
material balance area be established so as to restrict IAEA access to 
this information); and
    (5) A map of the site and information on the size of the buildings 
and on the general nature of the activities conducted in each building.
    (c) Each licensee or certificate holder shall thereafter submit to 
the Commission information with respect to any modification at the 
facility affecting the information referred to in paragraph (a) of this 
section. The following information must be submitted:
    (1) Regarding a modification of a type described in the license or 
certificate conditions: At least 180 days before the modification is 
scheduled to be started, except that in an emergency or other 
unforeseen situation a shorter period may be approved by the 
Commission.
    (2) Regarding any other modification relevant to the application of 
the provisions of the Safeguards Agreement: At the time the first 
inventory change report is submitted after the modification is 
completed.
    (d) The information specified in paragraphs (b) and (c) of this 
section, except for the information specified in paragraph (b)(5) of 
this section, must be prepared on IAEA approved Design Information 
Questionnaire forms (Form N-71 and associated forms or other forms 
supplied by the Commission). The information must be sufficiently 
detailed to enable knowledgeable determinations to be made in the 
development of Facility Attachments or amendments thereto, including:
    (1) Identification of the features of facilities and nuclear 
material relevant to the application of safeguards to nuclear material 
in sufficient detail to facilitate verification;
    (2) Determination of IAEA material balance areas to be used for 
IAEA accounting purposes and selection of those strategic points which 
are key measurement points and which will be used to determine flow and 
inventory of nuclear material;
    (3) Establishment of the nominal timing and procedures for taking 
of physical inventories of nuclear material for IAEA accounting 
purposes;
    (4) Establishment of the records and reports requirements and 
records evaluation procedures;
    (5) Establishment of requirements and procedures for verification 
of the quantity and location of nuclear material;
    (6) Selection of appropriate combinations of containment and 
surveillance methods and techniques at the strategic points at which 
they are to be applied; and
    (7) Information on organizational responsibility for material 
accounting and control.
    (e) Information specified in paragraph (b)(5) of this section must 
be submitted as specified by instructions for DOC/NRC Form AP-A and 
associated forms and shall contain a site map drawn to scale as an 
attachment.
    (f) The applicant's, licensee's, or certificate holder's security 
rules for physical protection that will impact the IAEA inspectors at 
the facility must be included in the facility information only when and 
to the extent specifically requested by the Commission.
    (g) Health and safety rules that are to be observed by the IAEA 
inspectors at the facility must be included in the facility 
information.
    (h) Information must be provided on the need to manage IAEA access 
to the facility to protect health and safety or to protect classified, 
proprietary, or other sensitive information, and on other protective 
measures that should be implemented should an IAEA access be requested.

0
39. Section 75.11 is revised to read as follows:


Sec.  75.11  Location information.

    (a) As required by the Additional Protocol, each applicant, 
licensee, or certificate holder shall submit location information to 
the Commission as specified in the instructions for DOC/NRC Form AP-1 
and associated forms.
    (b) Location information includes:
    (1) Nuclear fuel cycle-related research and development information 
including a general description of the activity and information 
specifying the location of the activity.
    (2) Nuclear fuel cycle-related manufacturing or construction 
information including a description of the scale of operations for the 
activity.
    (3) Uranium and thorium mine and concentration plant information 
including information on the location, operational status, and the 
estimated annual production capacity and current annual production of 
the activity.
    (4) Impure source material possession information including the 
quantities, the chemical composition, and the use or intended use of 
the material (e.g., nuclear or non-nuclear use).
    (5) Imports and exports of source material for non-nuclear end uses

[[Page 78612]]

including the location, quantities, chemical compositions, and use of 
the imported or exported material.
    (6) IAEA-exempted and -terminated nuclear material information 
including information regarding the quantities, uses, and location of 
the nuclear material.
    (7) Imports and exports of non-nuclear material and equipment 
including the location, quantity and description of the materials and 
equipment.
    (c) Information specified in paragraphs (b)(1) through (b)(7) of 
this section must be supplied as specified in the instructions for DOC/
NRC Form AP-1 and associated forms. The Information provided on DOC/NRC 
Form AP-1 and associated forms must be submitted annually. If the 
information has not changed, a ``No change'' report must be provided. 
NRC should also be notified when the activity is no longer performed. 
The annual report must be submitted by January 31 of each succeeding 
year after the initial report. The initial report must be submitted no 
later than 30 calendar days following the date of publication of this 
rule.
    (d) Information must be provided on the need to manage IAEA access 
to the location to protect health and safety or to protect classified, 
proprietary, or other sensitive information, and on other protective 
measures that should be implemented should an IAEA access be requested.

0
40. In Sec.  75.12, paragraphs (a), (b), and (d) are revised to read as 
follows:


Sec.  75.12  Reporting information to IAEA.

    (a) Except as otherwise provided in this section, the Commission 
will furnish to the IAEA all information submitted under Sec. Sec.  
75.10, 75.11, and 75.31 through 75.43.
    (b)(1) An applicant, licensee, or certificate holder may request 
that information of particular sensitivity, that it customarily holds 
in confidence, not be transmitted physically to the IAEA. An applicant, 
licensee, or certificate holder who makes this request shall, at the 
time the information is submitted, identify the pertinent document or 
part thereof and make a full statement of the reasons supporting the 
request. The applicant, licensee, or certificate holder shall retain a 
copy of the request and all documents related to the request as a 
record until the Commission terminates the license or certificate for 
each facility or location involved with the request, or until the 
Commission notifies the applicant, licensee, or certificate holder that 
the applicant, licensee, or certificate holder is no longer under the 
Safeguards Agreement. Superseded material must be retained for 3 years 
after each change is made.
    (2) In considering such a request, it is the policy of the 
Commission to achieve an effective balance between legitimate concerns 
of licensees, applicants, or certificate holders, including protection 
of the competitive position of the owner of the information, and the 
undertaking of the United States to cooperate with the IAEA to 
facilitate the implementation of the safeguards provided for in the 
Safeguards Agreement and Additional Protocol. The Commission will take 
into account the obligation of the IAEA to take every precaution to 
protect commercial and industrial secrets and other confidential 
information coming to its knowledge in the implementation of the 
Safeguards Agreement and Additional Protocol.
    (3) A request made under Sec.  2.390 of this chapter will not be 
treated as a request under this section unless the application makes 
specific reference to this section, nor shall a determination to 
withhold information from public disclosure necessarily require a 
determination that such information not be transmitted physically to 
the IAEA.
    (4) If a request is granted, the Commission will determine a 
location where the information will remain readily available for 
examination by the IAEA and will so inform the applicant, licensee, or 
certificate holder. The applicant, licensee, or certificate holder 
shall retain this information as a record until the Commission 
terminates the license or certificate for the facility involved with 
the request or until the Commission notifies the applicant, licensee, 
or certificate holder that the applicant, licensee, or certificate 
holder is no longer under the Safeguards Agreement. Superseded material 
must be retained for 3 years after each change is made.
* * * * *
    (d) Where consistent with the Safeguards Agreement, the Commission 
may at its own initiative, or at the request of a licensee, determine 
that any information submitted under Sec. Sec.  75.10, and 75.11 shall 
not be physically transmitted to, or made available for examination by, 
the IAEA.


Sec.  75.13  [Removed]

0
41. Section 75.13 is removed.


Sec.  75.14  [Removed]

0
42. Section 75.14 is removed.

0
43-44. The undesignated center heading ``Material Accounting And 
Control'' following Sec.  75.14 is revised and new Sec.  75.15 is added 
to read as follows:

Material Accounting and Control for Facilities


Sec.  75.15  Facility attachments.

    (a) The Facility Attachment or Transitional Facility Attachment 
will document the determinations referred to in Sec.  75.10 and will 
contain other appropriate provisions.
    (b) The Commission will issue license or certificate amendments, as 
necessary, to implement the Safeguards Agreement and the Facility 
Attachment (as amended from time to time). The license or certificate 
amendments through reference to the Facility Attachment or Transitional 
Facility Attachment, or otherwise, will specify:
    (1) IAEA material balance areas;
    (2) Types of modifications for which information is required, under 
Sec.  75.10, to be submitted in advance;
    (3) Procedures, as referred to in Sec.  75.21;
    (4) The extent to which isotopic composition must be included in 
batch data (under Sec.  75.22) and advance notification (Sec.  75.45);
    (5) Items to be reported in the concise notes accompanying 
inventory change reports, as referred to in Sec.  75.34;
    (6) Loss limits and changes in containment, as referred to in Sec.  
75.36 (pertaining to special reports);
    (7) Actions required to be taken under Sec.  75.8(f) at the request 
of an IAEA inspector;
    (8) Procedures to be used for documentation of requests under Sec.  
75.46 (pertaining to expenses); and
    (9) Other appropriate matters.
    (c) The Commission will also issue license or certificate 
amendments, as necessary, for implementing the Initial Protocol to the 
Safeguards Agreement and the Transitional Facility Attachment (as 
amended from time to time).
    (d) License or certificate amendments will be made under the 
Commission's rules of practice (part 2 of this chapter). Specifically, 
if the licensee or certificate holder does not agree to an amendment, 
an order modifying the license would be issued under Sec.  2.204 of 
this chapter.
    (e) Subject to constraints imposed by the Safeguards Agreement, the 
Commission will afford the applicant, licensee, or certificate holder a 
reasonable opportunity to participate in the development of the 
Facility Attachment or Transitional Facility Attachment applicable to 
the facility, and any amendments thereto, and to review and comment 
upon any instrument before it has been agreed to by the United States. 
The Commission will provide to the applicant, licensee, or certificate 
holder a copy of any such

[[Page 78613]]

instrument that has been completed under the Safeguards Agreement.
    (f) Locations reporting under the Additional Protocol, unless 
located in a facility selected under Article 39(b) of the main text of 
the Safeguards Agreement, do not have Facility Attachments or 
Transitional Facility Attachments.

0
45. In Sec.  75.21, paragraphs (a) and (c) are revised to read as 
follows:


Sec.  75.21  General requirements.

    (a) Each licensee or certificate holder who has been given notice 
by the Commission in writing that its facility has been identified 
under the Safeguards Agreement shall establish, maintain, and follow 
written material accounting and control procedures. The licensee or 
certificate holder shall retain as a record current material accounting 
and control procedures until the Commission terminates the license or 
certificate for the facility involved with the request or until the 
Commission notifies the licensee or certificate holder that the 
licensee or certificate holder is no longer under the Safeguards 
Agreement. Superseded material must be retained for 3 years after each 
change is made.
* * * * *
    (c)(1) The procedures must, unless otherwise specified in license 
or certificate conditions, conform to the facility information 
submitted by the licensee under Sec.  75.10.
    (2) Until facility information has been submitted by the applicant, 
licensee, or certificate holder, the procedures must be sufficient to 
document changes in the quantity of nuclear material in or at its 
facility. Observance of the procedures described in Sec. Sec.  40.61 or 
74.15 of this chapter (or the corresponding provisions of the 
regulations of an Agreement State) by any applicant, licensee, or 
certificate holder subject thereto constitutes compliance with this 
paragraph.
* * * * *

0
46. Section 75.31 is revised to read as follows:


Sec.  75.31  General requirements.

    Each licensee or certificate holder who has been given notice by 
the Commission in writing that its facility has been identified under 
the Safeguards Agreement shall make, in an appropriate computer-
readable format, an initial inventory report, and thereafter shall make 
accounting reports, with respect to the facility and, in addition, 
licensees or certificate holders who have been given notice, under 
Sec.  75.7 that their facilities are subject to the application of IAEA 
safeguards, shall make the special reports described in Sec.  75.36. 
These reports must be based on the records kept under Sec.  75.21. At 
the request of the Commission, the licensee or certificate holder shall 
amplify or clarify any report with respect to any matter relevant to 
implementation of the Safeguards Agreement. Any amplification or 
clarification must be in writing and must be submitted, to the address 
specified in the request, within 20 days or other time as may be 
specified by the Commission.

0
47. In Sec.  75.32, paragraph (b) is revised to read as follows:


Sec.  75.32  Initial inventory report.

* * * * *
    (b) The initial inventory report, to be submitted to the Commission 
as specified by the instructions (NUREG/BR-0007 and NMMSS Report D-24 
``Personal Computer Data Input for NRC Licensees''), must show the 
quantities of nuclear material contained in or at a facility as of the 
initial inventory reporting date. The information in the initial 
inventory report may be based upon the licensee's or certificate 
holder's book record.
* * * * *

0
47. In Sec.  75.33, paragraph (a)(1) is revised to read as follows:


Sec.  75.33  Accounting reports.

    (a)(1) The accounting reports for each IAEA material balance area 
must consist of:
    (i) Nuclear Material Transaction Reports (Inventory Change 
Reports); and
    (ii) Material status reports showing the material balance based on 
a physical inventory of nuclear material actually present.
* * * * *

0
48. In Sec.  75.34, the introductory text of paragraph (b) and 
paragraph (b)(2) are revised to read as follows:


Sec.  75.34  Inventory change reports.

* * * * *
    (b) Nuclear Material Transactions Reports (Inventory Change 
Reports), when appropriate, must be accompanied by Concise Notes, 
completed as specified in the instructions (NUREG/BR-0006 and NMMSS 
Report D-24 ``Personal Computer Data Input for NRC Licensees''). Copies 
of these instructions may be obtained from the U.S. Nuclear Regulatory 
Commission, Division of Fuel Cycle Safety and Safeguards, Washington, 
DC 20555-0001. This Concise Note is used in:
* * * * *
    (2) Describing, to the extent specified in the license conditions, 
the anticipated operational program for the facility, including 
particularly, but not exclusively, the schedule for taking physical 
inventory.

0
47. In Sec.  75.35, paragraph (a) is revised to read as follows:


Sec.  75.35  Material status reports.

    (a) A material status report must be submitted for each physical 
inventory which is taken as part of the material accounting and control 
procedures required by Sec.  75.21. The material status report must 
include a material balance report and a physical inventory report which 
lists all batches separately and specifies material identification and 
batch data for each batch. When appropriate, the material status report 
must be accompanied by a Concise Note. The reports described in this 
section must be prepared and submitted in accordance with instructions 
(NUREG/BR-0006, NUREG/BR-0007, and NMMSS Report D-24 ``Personal 
Computer Data Input for NRC Licensees''). Copies of these instructions 
may be obtained from the U.S. Nuclear Regulatory Commission, Division 
of Fuel Cycle Safety and Safeguards, Washington, DC 20555-0001.
* * * * *

0
49. In Sec.  75.36, paragraph (a) is revised to read as follows:


Sec.  75.36  Special reports.

    (a) This section applies only to licensees or certificate holders 
who have been given notice under Sec.  75.7(b) that their facilities 
are subject to the application of IAEA safeguards.
* * * * *


Sec.  75.37  [Removed]

0
50. Section 75.37 is removed.


Sec.  75.41  [Removed]

0
51. Section 75.41 is removed.


Sec.  75.42  [Removed]

0
52. Section 75.42 is removed.

0
53. A new undesignated center heading is added after Sec.  75.36 to 
read as follows:

Advanced Notification and Expenses

0
54. In Sec.  75.43, paragraphs (a) and (d) are revised to read as 
follows:


Sec.  75.43  Circumstances requiring advance notification.

    (a) Each applicant, licensee, or certificate holder who has been 
given notice under Sec.  75.7 shall give advance written notification 
to the Commission regarding the international and domestic transfers 
specified in this section.
* * * * *

[[Page 78614]]

    (d) Domestic Transfers. Notification must be given regarding any 
shipments of nuclear material (other than small quantities in the form 
of samples containing less than 0.01 effective kilogram per sample) to 
a non-eligible destination. As used in this paragraph, a non-eligible 
destination means any destination in the United States other than a 
facility on the Eligible Facilities List.

0
55. In Sec.  75.44, paragraph (a) is revised to read as follows:


Sec.  75.44  Timing of advance notification.

    (a) Except as provided in paragraph (b) of this section, 
notification to the Commission, when required by Sec.  75.43, must be 
given:
    (1) In the case of exports and domestic transfers, at least 20 days 
in advance of the preparation of the nuclear material for shipment from 
the facility.
    (2) In the case of imports, at least 12 days in advance of the 
unpacking of nuclear material at the facility.
* * * * *

0
56. In Sec.  75.45, paragraph (a) is revised to read as follows:


Sec.  75.45  Content of advance notification.

    (a) The notifications required by Sec.  75.43 must include the 
element weight of nuclear material being received or shipped, the 
chemical composition and physical form, the isotopic composition (to 
the extent specified by license conditions), the estimated date and 
place at the reporting facility where the nuclear material is to be 
unpackaged or prepared for shipment (and where the quantity and 
composition can be verified), the applicable IAEA material balance area 
at the reporting facility, the approximate number of items to be 
received or shipped, and the probable dates of receipt or shipment. The 
notification must indicate that the information is being supplied under 
Sec.  75.43.
* * * * *

0
57. In Sec.  75.46, paragraphs (a) and (d) are revised to read as 
follows:


Sec.  75.46  Expenses.

    (a) Under the Safeguards Agreement, the IAEA undertakes to 
reimburse an applicant, licensee, or certificate holder who has been 
given notice under Sec.  75.7 for extraordinary expenses incurred as a 
result of its specific request: Provided, That the IAEA has agreed in 
advance to do so. The Safeguards Agreement also contemplates that, in 
any case, the IAEA will reimburse an applicant, licensee, or 
certificate holder for the cost of making additional measurements or 
taking samples at the specific request of an IAEA inspector.
* * * * *
    (d) The Commission will take appropriate action to assist the 
applicant, licensee, or certificate holder regarding the reimbursement 
of any expense which, under the Safeguards Agreement, is to be borne by 
the IAEA.

0
58. Section 75.53, is revised to read as follows:


Sec.  75.53  Criminal penalties.

    (a) Section 223 of the Atomic Energy Act of 1954, as amended, 
provides for criminal sanctions for willful violation of, or conspiracy 
to violate, any regulation issued under sections 161b., 161i., or 161o. 
of the Act. For purposes of criminal sanctions under section 223, all 
the regulations in Part 75 are issued under one or more of sections 
161b., 161i., or 161o., except as provided in paragraphs (b) and (c) of 
this section.
    (b) The regulations in Part 75 that are not issued under sections 
161b, 161i, or 161o for the purposes of section 223 are as follows: 
Sec. Sec.  75.1, 75.2, 75.3, 75.4, 75.5, 75.7, 75.9, 75.12, 75.15, 
75.46, 75.51, and 75.53.
    (c) Any provision in Part 75 that implements the ``Protocol 
Additional to the Agreement between the United States of America and 
the International Atomic Energy Agency for the Application of 
Safeguards in the United States of America,'' known as the ``Additional 
Protocol,'' signed by the United States on June 12, 1998, is not issued 
under sections 161b., 161i., or 161o, for the purposes of criminal 
sanctions under section 223.

PART 76--CERTIFICATION OF GASEOUS DIFFUSION PLANTS

0
59. The authority citation for part 76 continues to read as follows:

    Authority: Sec. 161, 68 Stat. 948, as amended, secs. 1312, 1701, 
as amended, 106 Stat. 2932, 2951, 2952, 2953, 110 Stat. 1321-349 (42 
U.S.C. 2201, 2297b-11, 2297f); secs. 201, as amended, 204, 206, 88 
Stat. 1244, 1245, 1246 (42 U.S.C. 5841, 5842, 5845, 5846). Sec. 
234(a), 83 Stat. 444, as amended by Pub. L. 104-134, 110 Stat. 1321, 
1321-349 (42 U.S.C. 2243(a)); sec. 1704, 112 Stat. 2750 (44 U.S.C. 
3504 note).
    Section 76.7 also issued under Pub. L. 95-601, sec. 10, 92 Stat. 
2951 as amended by Pub. L. 102-486, sec. 2902, 106 Stat. 3123 (42 
U.S.C. 5851). Section 76.22 is also issued under sec. 193(f), as 
amended, 104 Stat. 2835, as amended by Pub. L. 104-134, 110 Stat. 
1321, 1321-349 (42 U.S.C. 2243(f)). Section 76.35(j) also issued 
under sec. 122, 68 Stat. 939 (42 U.S.C. 2152).


0
60. In Sec.  76.35, paragraph (l) is revised to read as follows:


Sec.  76.35  Contents of application.

* * * * *
    (l)(1) In response to a written request by the Commission, each 
applicant for a certificate and each recipient of a certificate shall 
submit facility information, as described in Sec.  75.10 of this 
chapter, on Form N-71 and associated forms and site information on DOC/
NRC Form AP-A and associated forms;
    (2) As required by the Additional Protocol, shall submit location 
information described in Sec.  75.11 of this chapter on DOC/NRC Form 
AP-1 and associated forms; and
    (3) Shall permit verification thereof by the International Atomic 
Energy Agency (IAEA); and shall take other action as may be necessary 
to implement the US/IAEA Safeguards Agreement, as described in Part 75 
of this chapter.
* * * * *

PART 95--FACILITY SECURITY CLEARANCE AND SAFEGUARDING OF NATIONAL 
SECURITY INFORMATION AND RESTRICTED DATA

0
61. The authority citation for part 95 continues to read as follows:

    Authority: Secs. 145, 161, 193, 68 Stat. 942, 948, as amended 
(42 U.S.C. 2165, 2201); sec. 201, 88 Stat. 1242, as amended (42 
U.S.C. 5841); sec. 1704, 112 Stat. 2750 (44 U.S.C. 3504 note); E.O. 
10865, as amended, 3 CFR 1959-1963 Comp., p. 398 (50 U.S.C. 401, 
note); E.O. 12829, 3 CFR, 1993 Comp., p. 570; E.O. 12958, as 
amended, 3 CFR, 1995 Comp., p. 333, as amended by E.O. 13292, 3 CFR, 
2004 Comp., p. 196; E.O. 12968, 3 CFR, 1995 Comp., p. 391.


0
62. In Sec.  95.36, paragraphs (a) and (b) are revised to read as 
follows:


Sec.  95.36  Access by representatives of the International Atomic 
Energy Agency or by participants in other international agreements.

    (a) Based upon written disclosure authorization from the NRC Office 
of Nuclear Material Safety and Safeguards that an individual is an 
authorized representative of the International Atomic Energy Agency 
(IAEA) or other international organization and that the individual is 
authorized to make visits under an established agreement with the 
United States Government, an applicant, licensee, certificate holder, 
or other person subject to this part shall permit the individual (upon 
presentation of the credentials specified in Sec.  75.8(c) of this 
chapter and any other credentials identified in the disclosure 
authorization) to have access to matter classified as National Security 
Information that is relevant to the conduct of a visit or inspection. A

[[Page 78615]]

disclosure authorization under this section does not authorize a 
licensee, certificate holder, or other person subject to this part to 
provide access to Restricted Data.
    (b) For purposes of this section, classified National Security 
Information is relevant to the conduct of a visit or inspection if--
    (1) In the case of a visit, this information is needed to verify 
information according to Sec.  75.8 of this chapter; or
    (2) In the case of an inspection, an inspector is entitled to have 
access to the information under Sec.  75.8 of this chapter.
* * * * *

PART 110--EXPORT AND IMPORT OF NUCLEAR EQUIPMENT AND MATERIAL

0
63. The authority citation for part 110 continues to read as follows:

    Authority: Secs. 51, 53, 54, 57, 63, 64, 65, 81, 82, 103, 104, 
109, 111, 126, 127, 128, 129, 161, 181, 182, 183, 187, 189, 68 Stat. 
929, 930, 931, 932, 933, 936, 937, 948, 953, 954, 955, 956, as 
amended (42 U.S.C. 2071, 2073, 2074, 2077, 2092-2095, 2111, 2112, 
2133, 2134, 2139, 2139a, 2141, 2154-2158, 2201, 2231-2233, 2237, 
2239); sec. 201, 88 Stat. 1242, as amended (42 U.S.C. 5841); sec. 5, 
Pub. L. 101-575, 104 Stat. 2835 (42 U.S.C. 2243); sec. 1704, 112 
Stat. 2750 (44 U.S.C. 3504 note); Energy Policy Act of 2005; Pub. L. 
109-58, 119 Stat. 594 (2005).
    Sections 110.1(b)(2) and 110.1(b)(3) also issued under Pub. L. 
96-92, 93 Stat. 710 (22 U.S.C. 2403). Section 110.11 also issued 
under sec. 122, 68 Stat. 939 (42 U.S.C. 2152) and secs. 54c and 57d, 
88 Stat. 473, 475 (42 U.S.C. 2074). Section 110.27 also issued under 
sec. 309(a), Pub. L. 99-440. Section 110.50(b)(3) also issued under 
sec. 123, 92 Stat. 142 (42 U.S.C. 2153). Section 110.51 also issued 
under sec. 184, 68 Stat. 954, as amended (42 U.S.C. 2234). Section 
110.52 also issued under sec. 186, 68 Stat. 955 (42 U.S.C. 2236). 
Sections 110.80-110.113 also issued under 5 U.S.C. 552, 554. 
Sections 110.130-110.135 also issued under 5 U.S.C. 553. Sections 
110.2 and 110.42(a)(9) also issued under sec. 903, Pub. L. 102-496 
(42 U.S.C. 2151 et seq.).


0
64. Section 110.11 is revised to read as follows:


Sec.  110.11  Export of IAEA safeguards samples.

    A person is exempt from the requirements for a license to export 
special nuclear material set forth in sections 53 and 54d. of the 
Atomic Energy Act and from the regulations in this Part to the extent 
that the person exports special nuclear material in IAEA safeguards 
samples, if the samples are exported under Sec.  75.8 of this chapter, 
or a comparable Department of Energy order, and are in quantities not 
exceeding a combined total of 100 grams of contained plutonium, U-233, 
and U-235 per facility per year. This exemption does not relieve any 
person from complying with Parts 71 or 73 of this chapter or any 
Commission order under section 201(a) of the Energy Reorganization Act 
of 1974 (42 U.S.C. 5841(a)).

0
65. Section 110.54 is added to read as follows:


Sec.  110.54  Reporting requirements.

    (a) Reports of exports of nuclear facilities and equipment, nuclear 
grade graphite for nuclear end use, and deuterium shipped during the 
previous quarter must be submitted by licensees making exports under 
the general license or specific license of this part by January 15, 
April 15, July 15, and October 15 of each year on DOC/NRC Forms AP-A or 
AP-1, and associated forms. The reports must contain information on all 
nuclear facilities, equipment, and non-nuclear materials (nuclear grade 
graphite for nuclear end use and deuterium) listed in Annex II of the 
Additional Protocol.
    (b) These required reports must be sent via facsimile to (202) 482-
1731, e-mailed to [email protected], or hand delivered or submitted by 
courier to Bureau of Industry and Security, in hard copy, to the 
following address: Treaty Compliance Division, Bureau of Industry and 
Security, U.S. Department of Commerce, Attn: AP Reports, 14th Street 
and Pennsylvania Avenue, NW., Room 4515, Washington, DC 20230. 
Telephone: (202) 482-1001.

PART 150--EXEMPTIONS AND CONTINUED REGULATORY AUTHORITY IN 
AGREEMENT STATES AND IN OFFSHORE WATERS UNDER SECTION 274

0
66. The authority citation for part 150 continues to read as follows:

    Authority: Sec. 161, 68 Stat. 948, as amended, sec. 274, 73 
Stat. 688 (42 U.S.C. 2201, 2021); sec. 201, 88 Stat. 1242, as 
amended (42 U.S.C. 5841); sec. 1704, 112 Stat. 2750 (44 U.S.C. 3504 
note); sec. 651(e), Pub. L. 109-58, 119 Stat. 806-810 (42 U.S.C. 
2014, 2021, 2021b, 2111).
    Sections 150.3, 150.15, 150.15a, 150.31, 150.32 also issued 
under secs. 11e(2), 81, 68 Stat. 923, 935, as amended, secs. 83, 84, 
92 Stat. 3033, 3039 (42 U.S.C. 2014e(2), 2111, 2113, 2114). Section 
150.14 also issued under sec. 53, 68 Stat. 930, as amended (42 
U.S.C. 2073). Section 150.15 also issued under secs. 135, 141, Pub. 
L. 97-425, 96 Stat. 2232, 2241 (42 U.S.C. 10155, 10161). Section 
150.17a also issued under sec. 122, 68 Stat. 939 (42 U.S.C. 2152). 
Section 150.30 also issued under sec. 234, 83 Stat. 444 (42 U.S.C. 
2282).


0
67. In Sec.  150.8, paragraph (c)(3) is added to read as follows:


Sec.  150.8  Information collection requirements: OMB approval.

* * * * *
    (c) * * *
    (3) In Sec.  150.17a, Form N-71 and associated forms are approved 
under OMB control number 3150-0056 and DOC/NRC Forms AP-1 or AP-A and 
associated forms are approved under OMB control number 0694-0135.

0
68. Section 150.17a is revised to read as follows:


Sec.  150.17a  Compliance with requirements of US/IAEA Safeguards 
Agreement.

    (a) For purposes of this section, the terms facility, location, and 
Eligible Facilities List have the meanings set forth in Sec.  75.4 of 
this chapter.
    (b) Each person who, under an Agreement State license, is 
authorized to possess byproduct, source, or special nuclear material is 
subject to the provisions of Part 75 of this chapter and shall comply 
with its applicable provisions. However, regarding these persons, the 
Commission will issue orders under section 274m of the Act instead of 
making license amendments; and, to the extent Part 75 of this chapter 
refers to license amendments and license conditions, these references 
shall be deemed, for purposes of this paragraph, to refer to orders 
under section 274m of the Act.
    (c)(1) In response to a written request by the Commission, each 
applicant for an Agreement State license or certificate, and each 
recipient of an Agreement State license or certificate shall submit 
facility information, as described in Sec.  75.10 of this chapter, on 
Form N-71 and associated forms, and site information on DOC/NRC Form 
AP-A and associated forms;
    (2) As required by the Additional Protocol, shall submit location 
information described in Sec.  75.11 of this chapter on DOC/NRC Form 
AP-1 and associated forms; and
    (3) Shall permit verification thereof by the International Atomic 
Energy Agency (IAEA); and shall take other action as may be necessary 
to implement the US/IAEA Safeguards Agreement, as described in Part 75 
of this chapter.
    (d) In response to a written request by the Commission, each 
applicant for an Agreement State license or certificate, and each 
recipient of an Agreement State license or certificate shall submit 
facility information, as described in Sec.  75.10 of this chapter, on 
Form N-71 and associated forms, and site information on DOC/NRC Form 
AP-A and associated forms; shall submit location information described 
in Sec.  75.11 of this chapter on DOC/NRC Form AP-1 or AP-A and 
associated

[[Page 78616]]

forms; shall permit verification thereof by the International Atomic 
Energy Agency (IAEA); and shall take other action as may be necessary 
to implement the US/IAEA Safeguards Agreement, as described in Part 75 
of this chapter.

    Dated at Rockville, Maryland, this 8th day of December 2008.

    For the Nuclear Regulatory Commission.
Martin J. Virgilio,
Acting Executive Director for Operations.
 [FR Doc. E8-30054 Filed 12-19-08; 11:15 am]
BILLING CODE 7590-01-P