[Federal Register: December 30, 2008 (Volume 73, Number 250)]
[Rules and Regulations]               
[Page 79639]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr30de08-10]                         

-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[USCG-2008-1155]

 
Drawbridge Operation Regulations; Gowanus Canal, Brooklyn, NY, 
Maintenance

AGENCY: Coast Guard, DHS.

ACTION: Notice of temporary deviation from regulations.

-----------------------------------------------------------------------

SUMMARY: The Commander, First Coast Guard District, has issued a 
temporary deviation from the regulation governing the operation of the 
Hamilton Avenue Bridge across the Gowanus Canal, mile 1.2, at Brooklyn, 
New York. Under this temporary deviation the bridge shall require a 
four-hour advance notice for bridge openings for three months to 
facilitate bridge maintenance. Vessels that can pass under the draw 
without a bridge opening may do so at all times.

DATES: This deviation is effective from January 16, 2009 through March 
31, 2009.

ADDRESSES: Documents indicated in this preamble as being available in 
the docket are part of docket USCG-2008-1155 and are available online 
at http://www.regulations.gov. They are also available for inspection 
or copying at two locations: The Docket Management Facility (M-30), 
U.S. Department of Transportation, West Building Ground Floor, Room 
W12-140, 1200 New Jersey Avenue, SE., Washington, DC 20590, between 9 
a.m. and 5 p.m., Monday through Friday, except Federal holidays, and 
the First Coast Guard District, Bridge Branch Office, 408 Atlantic 
Avenue, Boston, Massachusetts 02110, between 7 a.m. and 3 p.m., Monday 
through Friday, except Federal holidays.

FOR FURTHER INFORMATION CONTACT: Judy Leung-Yee, Project Officer, First 
Coast Guard District, at (212) 668-7165.

SUPPLEMENTARY INFORMATION: The Hamilton Avenue Bridge, across the 
Gowanus Canal, mile 1.2, at Brooklyn, New York, has a vertical 
clearance in the closed position of 19 feet at mean high water and 23 
feet at mean low water. The Drawbridge Operation Regulations are listed 
at 33 CFR 117.5.
    The waterway has seasonal recreational vessels, and commercial 
vessels of various sizes.
    The owner of the bridge, New York City Department of 
Transportation, requested a temporary deviation to facilitate the 
training of bridge personnel, mechanical and electrical testing at the 
bridge.
    Under this temporary deviation the Hamilton Avenue Bridge shall 
require at least a four-hour advance notice for bridge openings from 
January 16, 2009 through March 31, 2009. Vessels that can pass under 
the bridge without a bridge opening may do so at all times.
    In accordance with 33 CFR 117.35(e), the bridge must return to its 
regular operating schedule immediately at the end of the designated 
time period. This deviation from the operating regulations is 
authorized under 33 CFR 117.35.

    Dated: December 15, 2008.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
 [FR Doc. E8-30880 Filed 12-29-08; 8:45 am]

BILLING CODE 4910-15-P