Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New License for Major Project-Existing Dam.
b. Project No.: P-2175-014.
c. Date Filed: February 23, 2007.
[[Page 2485]]
d. Applicant: Southern California Edison Company.
e. Name of Project: Big Creek Nos. 1 and 2 Hydroelectric Power
Project.
f. Location: In Fresno County, California, and within the Sierra
National Forest. The project is situated along Big Creek, a tributary
to the San Joaquin River. The project affects 1,877.96 acres of federal
land administered by the Sierra National Forest.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r)
h. Applicant Contact: Russ W. Krieger, Vice President, Power
Production, Southern California Edison Company, 300 North Lone Hill
Ave., San Dimas, California 91773. Phone: (909) 394-8667.
i. FERC Contact: Ken Hogan at (202) 502-8434, or e-mail:
Kenneth.Hogan@ferc.gov.
j. Deadline for filing comments, and recommendations, final terms
and conditions, and prescriptions is 60 days from the issuance date of
this notice; reply comments are due 105 days from the issuance date of
this notice.
All documents (original and eight copies) should be filed with:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
Comments, recommendations, final terms and conditions, and
prescriptions may be filed electronically via the Internet in lieu of
paper. The Commission strongly encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site (http://www.ferc.gov) under the ``e-Filing'' link.
k. This application has been accepted for filing and is ready for
environmental analysis at this time.
l. Description of Project: The existing Big Creek Nos. 1 and 2
Hydroelectric Power Project consists of two powerhouses, four major
dams forming one major reservoir, one moderate dam and impoundment,
three small diversions, and three water conveyance systems. The project
would have an average annual generation of 657,072 megawatt-hours.
Powerhouses (i) Powerhouse No. 1 with four turbine/
generator units and a total dependable operating capacity of about 82.9
MW; and (ii) Powerhouse No. 2, with four turbine/generator units and a
total dependable operating capacity of about 67.1 MW.
Major dams and reservoirs (i) Dams 1, 2, 3, and 3a, which
form Huntington Lake, with a capacity of about 89,166 ac-ft, at an
elevation of about 6,950 ft above mean sea level (msl).
Moderate dam (i) Dam 4, which forms Dam 4 Impoundment
(Powerhouse 2 Forebay), with a capacity of about 60 ac-ft, at an
elevation of about 4,810 ft above msl.
Small diversions (i) Balsam Creek Diversion, with a usable
capacity of less than 1 ac-ft, at an elevation of about 4,880 ft above
msl; (ii) Ely Creek Diversion, with a usable capacity of less than 1
ac-ft, at an elevation of about 4,844 ft above msl; and (iii) Adit 8
Diversion, with a usable capacity of less than 1 ac-ft, at an elevation
of about 4,825 ft above msl.
Water conveyance systems (i) Tunnel No. 1, about 2 miles
long, conveys water from Huntington Lake through an 84-inch diameter
pipe to Big Creek Powerhouse No. 1.; (ii) Tunnel No. 2, approximately
4.1 miles long, conveys water from the Dam 4 impoundment just
downstream of Powerhouse 1 to Big Creek Powerhouse No. 2. Water from
Ely and Balsam Creek diversions also enter into Tunnel No. 2 between
the forebay and powerhouse; and (iii) The Shoo Fly, conveys water from
Shaver Lake.
(FERC Project No. 67) through Tunnel 5 and into Tunnel 2
leading to Powerhouse No. 2. The Shoo fly was used during the
construction of Shaver Lake Dam and Powerhouse No. 2A to keep water off
the dam and to get more generation from Powerhouse No. 2. Although not
currently in use, the Shoo fly Complex gives SCE the flexibility to
divert water from Shaver Lake to Powerhouse No. 2, if required.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at http://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the three digits in the docket
number field to access the document. For assistance, please contact
FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866)
208-3676, or for TTY, contact (202) 502-8659. A copy is also available
for inspection and reproduction at the address in item h above.
All filings must (1) bear in all capital letters the title
``COMMENTS,'' ``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``FINAL TERMS
AND CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading
the name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person submitting the filing; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, recommendations, final terms and conditions, or prescriptions
must set forth their evidentiary basis and otherwise comply with the
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the
application directly from the applicant. Each filing must be
accompanied by proof of service on all persons listed in the service
list prepared by the Commission in this proceeding, in accordance with
18 CFR 4.34(b) and 385.2010.
You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp
to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
n. A license applicant must file no later than 60 days following
the date of issuance of this notice: (1) a copy of the water quality
certification; (2) a copy of the request for certification, including
proof of the date on which the certifying agency received the request;
or (3) evidence of waiver of water quality certification.
o. Procedural schedule: The application will be processed according
to the following Hydro Licensing Schedule. Revisions to the schedule
will be made if the Commission determines it necessary to do so:
------------------------------------------------------------------------
Milestone Tentative date
------------------------------------------------------------------------
Comments, recommendations, final terms March 8, 2008.
and conditions, and prescriptions due.
Reply comments due from applicant...... April 22, 2008.
Notice of the availability of the draft September 2008.
EIS.
Comments on draft EIS due.............. November 2008.
Notice of the availability of the final March 2009.
EIS.
------------------------------------------------------------------------