[Federal Register: March 20, 2008 (Volume 73, Number 55)]
[Notices]
[Page 14979-14981]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr20mr08-38]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP08-66-000]
Petal Gas Storage, L.L.C.: Notice of Intent To Prepare an
Environmental Assessment for the Proposed Petal No. 3 Compressor
Station Expansion and New Caverns Project, and Request for Comments on
Environmental Issues
March 13, 2008.
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the potential environmental impacts of the Petal No. 3
Compressor Station Expansion and New Caverns Project, involving
construction and operation of natural gas pipeline facilities by Petal
Gas Storage, L.L.C. (Petal) in Forrest County, Mississippi. The EA will
be used by the Commission in its decisionmaking process to determine
whether the project is in the public convenience and necessity.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies on the project. Your input will help determine which issues
need to be evaluated in the EA. Please note that the scoping period
will close on April 14, 2008. Details on how to submit comments are
provided in the Public Participation section of this notice.
This notice is being sent to affected landowners; federal, state,
and local government agencies; elected officials; Native American
tribes; other interested parties; and local libraries and newspapers.
State and local government representatives are asked to notify their
constituents of this proposed project and to encourage them to comment
on their areas of concern.
A fact sheet prepared by the FERC entitled ``An Interstate Natural
Gas Facility On My Land? What Do I Need To Know?'' addresses a number
of typically asked questions, including the use of eminent domain and
how to participate in the Commission's proceedings. It is available for
viewing on the FERC Internet Web site (http://www.ferc.gov).
Summary of the Proposed Project
Petal proposes to expand its gas storage operations at the existing
Petal Storage Facility east of Hattiesburg, Mississippi. The expansion
would include construction of two new salt dome storage caverns; three
new compressor units, totaling 15,000 horsepower, at the existing Petal
No. 3 Compressor Station; an additional compressor station control
room; about 2,500 feet of 16-inch-diameter connecting pipeline; and
about 5,100 to 6,200 feet of 24-inch-diameter freshwater and brine
pipelines. The proposal would increase the overall capacity of Petal's
storage operations by about 19 billion cubic feet (Bcf) of natural gas
(10 Bcf working gas and 9 Bcf cushion gas).
The general location of the proposed facilities is shown in
appendix 1.\1\
---------------------------------------------------------------------------
\1\ The appendices referenced in this notice are not being
printed in the Federal Register. Copies of all appendices are
available on the Commission's Web site (http://www.ferc.gov) at the
``eLibrary'' link or from the Commission's Public Reference Room,
888 First Street, NE., Washington, DC 20426, or call (202) 502-8371.
For instructions on connecting to eLibrary, refer to the
``Additional Information'' section of this notice. Copies of the
appendices were sent to all those receiving this notice in the mail.
Requests for detailed maps of the proposed facilities should be made
directly to Petal.
---------------------------------------------------------------------------
Land Requirements for Construction
Construction of the project would affect about 17.1 acres of land,
including the pipeline construction rights-of-way, the cavern well
sites, and access roads. The compressor station expansion would take
place within the existing Petal No. 3 Compressor Station building.
Following construction, about 3.2 acres of land would be permanently
maintained for operation and maintenance of the proposed facilities.
All construction would take place on land owned by Petal.
[[Page 14980]]
The EA Process
We \2\ are preparing this EA to comply with the National
Environmental Policy Act of 1969 (NEPA), which requires the Commission
to take into account the environmental impact that could result if it
authorizes Petal's proposal. By this notice, we are also asking
federal, state, and local agencies with jurisdiction and/or special
expertise with respect to environmental issues to formally cooperate
with us in the preparation of the EA. Agencies that would like to
request cooperating status should follow the instructions for filing
comments provided below.
---------------------------------------------------------------------------
\2\ ``We'', ``us'', and ``our'' refer to the environmental staff
of the FERC's Office of Energy Projects.
---------------------------------------------------------------------------
NEPA also requires the FERC to discover and address concerns the
public may have about proposals. This process is referred to as
``scoping.'' The main goal of the scoping process is to focus the
analysis in the EA on important environmental issues. By this Notice,
we are requesting public comments on the scope of the issues to address
in the EA. All comments received are considered during the preparation
of the EA.
The EA will discuss impacts that could occur as a result of the
construction and operation of the proposed project under these general
headings:
Geology and soils
Water resources and wetlands
Land use
Cultural resources
Vegetation and wildlife (including threatened and
endangered species)
Air quality and noise
Reliability and safety
We will also evaluate possible alternatives to the proposed project
or portions of the project, where necessary, and make recommendations
on how to lessen or avoid impacts on the various resource areas.
Our independent analysis of the issues will be presented in the EA.
Depending on the comments received during the scoping process, the EA
may be published and mailed to federal, state, and local agencies;
public interest groups; interested individuals; affected landowners;
local libraries and newspapers; and the Commission's official service
list for this proceeding. A comment period will be allotted for review
if the EA is published. We will consider all comments on the EA before
we make our recommendations to the Commission.
To ensure your comments are considered, please carefully follow the
instructions in the Public Participation section below.
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the project. By becoming a commentor, your
concerns will be addressed in the EA and considered by the Commission.
You should focus on the potential environmental effects of the proposal
and measures to avoid or lessen environmental impact.
The more specific your comments, the more useful they will be.
Please carefully follow these instructions to ensure that your comments
are received in time and properly recorded:
Send an original and two copies of your letter to:
Kimberley D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First St., NE., Room 1A, Washington, DC 20426;
Label one copy of the comments for the attention of Gas
Branch 1, PJ-11.1;
Reference Docket No. CP08-66-000; and
Mail your comments so that they will be received in
Washington, DC on or before April 14, 2008.
The Commission encourages electronic filing of comments. See Title
18 of the Code of Federal Regulations, Part 385.2001(a)(1)(iii) and the
instructions on the Commission's Internet Web site at http://
www.ferc.gov under the ``eFiling'' link and the link to the User's
Guide. Prepare your submission in the same manner as you would if
filing on paper and save it to a file on your hard drive. Before you
can file comments you will need to create an account by clicking on
``Login to File'' and then ``New User Account.'' You will be asked to
select the type of filing you are making. This filing is considered a
``Comment on Filing.'' In addition, there is a ``Quick Comment'' option
available, which is an easy method for interested persons to submit
text only comments on a project. The Quick-Comment User Guide can be
viewed at http://www.ferc.gov/docs-filing/efiling/quick-comment-
guide.pdf. Quick Comment does not require a FERC eRegistration account;
however, you will be asked to provide a valid email address. All
comments submitted under either eFiling or the Quick Comment option are
placed in the public record for the specified docket.
Becoming an Intervenor
In addition to involvement in the scoping process, you may want to
become an official party to the proceeding known as an ``intervenor.''
Intervenors play a more formal role in the Commission's process. Among
other things, intervenors have the right to receive copies of case-
related Commission documents and filings by other intervenors.
Likewise, each intervenor must send one electronic copy (using the
Commission's eFiling system) or 14 paper copies of its filings to the
Secretary of the Commission and must send a copy of its filings to all
other parties on the Commission's service list for this proceeding. If
you want to become an intervenor, you must file a motion to intervene
according to Rule 214 of the Commission's Rules of Practice and
Procedure (18 CFR 385.214) (see appendix 2) \3\. Only intervenors have
the right to seek rehearing of the Commission's decision.
---------------------------------------------------------------------------
\3\ Interventions may also be filed electronically via the
Internet in lieu of paper. See the previous discussion on filing
comments electronically.
---------------------------------------------------------------------------
Affected landowners and parties with environmental concerns may be
granted intervenor status upon showing good cause by stating that they
have a clear and direct interest in this proceeding which would not be
adequately represented by any other parties. You do not need intervenor
status to have your environmental comments considered.
Environmental Mailing List
As described above, we may mail the EA for comment. If you are
interested in receiving an EA for review and/or comment, please return
the Environmental Mailing List Mailer (appendix 3). If you do not
return the Environmental Mailing List Mailer, you will be taken off the
mailing list. All individuals who provide written comments will remain
on our environmental mailing list for this project.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at 1-866-208-FERC or on the
FERC Internet Web site (http://www.ferc.gov) using the ``eLibrary''
link. Click on the eLibrary link, then on ``General Search'' and enter
the docket number excluding the last three digits in the Docket Number
field. Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission now offers a free service called
eSubscription
[[Page 14981]]
which allows you to keep track of all formal issuances and submittals
in specific dockets. This can reduce the amount of time you spend
researching proceedings by automatically providing you with
notification of these filings, document summaries and direct links to
the documents. Go to http://www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits will be posted on the
Commission's calendar located at http://www.ferc.gov/EventCalendar/
EventsList.aspx along with other related information.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-5596 Filed 3-19-08; 8:45 am]