[Federal Register: May 15, 2009 (Volume 74, Number 93)]
[Notices]
[Page 22924-22925]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr15my09-64]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8593-5]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under section 309 of the Clean Air Act and
Section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at 202-564-7146.
An explanation of the ratings assigned to draft environmental
impact statements (EISs) was published in FR dated April 17, 2009 (74
FR 17860).
Draft EISs
EIS No. 20090052, ERP No. D-NRS-H38001-IA, Clarke County Water Supply
Project, To Construct a Multiple-Purpose Structure that Provides for
Rural Water Supply and Water Based Recreational Opportunities, Clarke
County, IA.
Summary: EPA expressed environmental concerns about stream and
wetland impacts and mitigation. Rating EC2.
EIS No. 20090064, ERP No. D-FTA-K54031-CA, Silicon Valley Rapid Transit
Corridor Project, Proposes to Construct an Extension of the Bay Area
Rapid Transit (BART) Rail System from Warm Spring Station in Fremont to
Santa Clara County, CA.
Summary: EPA expressed environmental concerns about impacts to
water quality, noise impacts, and environmental justice. EPA also
recommended that the project sponsors ensure coordination with other
transit service in the area. Rating EC2.
EIS No. 20090076, ERP No. D-SFW-K91016-CA, Paiute Cutthroat Trout
Restoration Project, Eradication of Non-Native Trout Species from 11
Stream Miles of Silver King Creek, Alpine County, CA.
Summary: EPA expressed concerns about the environmental impacts of
piperonyl butoxide, and recommended further consideration of physical
treatment combined with chemical treatment options. Rating EC2.
EIS No. 20090082, ERP No. D-AFS-K65359-CA, Salt Timber Harvest and Fuel
Hazard Reduction Project, Proposing Vegetation Management in the Salt
Creek Watershed, South Fork Management Unit, Hayfork Ranger District,
Shasta-Trinity National Forest, Trinity County, CA.
Summary: EPA expressed environmental concerns about the treatment
prescriptions, naturally occurring asbestos, air quality, and climate
change. Rating EC2.
Final EISs
EIS No. 20090041, ERP No. F-TVA-E65073-IN, Watts Bar Reservoir Land
Management Plan, Amend and Update the 2005 Plan, Guide Land Use
Approvals, Private Water Use Facility, and Resource Management
Decisions, Loudon, Meigs, Rhea and Roane Counties, TN.
Summary: EPA continues to have environmental concerns because the
preferred alternative Modified B is not as environmental protective as
the Modified C alternative.
EIS No. 20090073, ERP No. F-USN-D11044-00, Virginia Capes (VACAPES)
Range Complex, Proposed action is to Support and Conduct Current and
Emerging Training and RDT & E Operations, Chesapeake Bay, DE, MD, VA
and NC.
Summary: EPA expressed environmental concerns about the
[[Page 22925]]
deposition of expended training materials into the marine environment
and its potential impact over time.
EIS No. 20090074, ERP No. F-FAA-F51051-OH, Port Columbus International
Airport/(CMH) Project, Replacement of Runway 10R/28L, Development of a
New Passenger Terminal and other Associated Airport Projects, Funding,
City of Columbus, OH.
Summary: EPA continues to have environmental concerns about PM2.5
emissions, and how they will be minimized.
EIS No. 20090081, ERP No. F-AFS-L65559-OR, BLT Project, Proposed
Vegetation Management Activities, Crescent Ranger District, Deschutes
National Forest, Deschutes County, OR.
Summary: EPA does not object to the proposed action.
EIS No. 20090089, ERP No. F-AFS-K65338-AZ, Warm Fire Recovery Project,
Removal of Fire-Killed Trees Reforestation, Fuel Reduction and Road
Reconstruction of Wildland Fire Burn Portion, Coconino County, AZ.
Summary: EPA continues to have environmental concerns about
potential impacts to water resources and wildlife habitat from erosion.
EIS No. 20090093, ERP No. F-FHW-H40193-IA, I-29 Improvements in Sioux
City, Construction from Burlington Northern Santa Fe Rail Road (BNSF)
Bridge over the Missouri River to Existing Hamilton Boulevard
Interchange, Woodbury County, IA.
Summary: While EPA does not object to the proposed action, it
requested clarification of water and sanitary sewer line relocation and
abandonment issues.
EIS No. 20090096, ERP No. FS-COE-G34043-LA, Inner Harbor Navigation
Canal (IHNC) Lock Replacement Project, Proposal for Relieving
Navigation Traffic Congestion Associated with IHNC Lock, Located
between the St. Claude Avenue and North Claibone Avenue Bridge,
Orleans, LA.
Summary: EPA does not object to the preferred alternative.
EIS No. 20090103, ERP No. FS-NOA-K91008-00, Amendment 18 to the Fishery
Management Plan, Pelagic Fisheries of the Western Pacific Region,
Management Modifications for the Hawaii-based Shallow-set Longline
Swordfish Fishery, Proposal to Remove Effort Limits, Eliminate the Set
Certificate Program and Implement New Sea Turtle Interaction Caps.
Summary: EPA does not object to the proposed project, but suggests
that the conservation recommendations outlined in the Biological
Opinion be included in the Record of Decision.
Dated: May 12, 2009.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E9-11398 Filed 5-14-09; 8:45 am]
BILLING CODE 6560-50-P