[Federal Register: May 22, 2009 (Volume 74, Number 98)]
[Notices]               
[Page 24006-24007]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr22my09-55]                         

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-8593-6]

 
Environmental Impact Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-1399 or http://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements
Filed ??? Through ???
Pursuant to 40 CFR 1506.9.

EIS No. 20090153, Final EIS, AFS, MT, Grizzly Vegetation and 
Transportation Management Project, Proposes Timber Harvest, Prescribed 
Burning, Road Maintenance, and Transportation Management Actions, Three 
Rivers Ranger District, Kootenai National Forest, Lincoln County, MT, 
Wait Period Ends: 06/22/2009, Contact: Kathy Mohar 406-295-4693.
EIS No. 20090154, Draft EIS, NPS, AL, Tuskegee Airmen National Historic 
Site, General Management Plan, Implementation, Tuskegee, AL, Comment 
Period Ends: 07/20/2009, Contact: Amy Wirsching 404-507-5708.
EIS No. 20090155, Draft EIS, BIA, NY, Cayuga Indian Nation of New York 
Conveyance of Land into Trust Project, Approval of a 125+ Acre Fee-To-
Trust Property Transfer of Seven Separate Parcels located in the 
Village of Union Springs and Town of Springport and Montezuma in Cayuga 
County and the Town of Seneca Falls in Seneca County, NY, Comment 
Period Ends: 07/06/2009, Contact: Kurt G. Chandler 615-564-6832.
EIS No. 20090156, Draft EIS, NIH, MD, National Institutes of Health 
(NIH), Transport of Laboratory Personnel Potentially Exposed to 
Infectious Agents from Fort Detrick, Frederick, MD to the National 
Institutes of Health Clinical Center, Bethesda, MD, Comment Period 
Ends: 07/24/2009, Contact: Mark Radtke 301-451-6467.
EIS No. 20090157, Draft EIS, AFS, WY, Upper Greys Vegetation Management 
Project, Proposes to Conduct Timber Harvest on 362 Acres in Upper Greys 
River Watershed, Greys River Ranger District, Bridger-Teton National 
Forest, Lincoln County, WY, Comment Period Ends: 07/06/2009, Contact: 
Heidi Whitlach 307-886-5305.
EIS No. 20090158, Final EIS, FHW, IL, Illinois Route 29 (FAP 318) 
Corridor Study, Transportation Improvement from Illinois 6 to 
Interstate 180, Funding and US Army COE Section 404 Permit, Peoria, 
Marshall, Putnam and Bureau Counties, IL, Wait Period Ends: 06/22/2009, 
Contact: Matt Fuller 217-492-4625.
EIS No. 20090159, Draft EIS, FHW, NC, Gaston East-West Connector 
Project, Construction (from I-85 west Gastonia to I-485/NC 160 near the 
Charlotte-Douglas International Airport, Gaston and Mecklenburg 
Counties, NC, Comment Period Ends: 07/17/2009, Contact: John F. 
Sullivan 919-856-4346.
EIS No. 20090160, Draft EIS, AFS, MN, Border Project, Proposing Forest 
Vegetation Management and Related Transportation System Activities, 
LaCroix Ranger District, Superior National Forest, St. Louis County, 
MN, Comment Period Ends: 07/06/2009, Contact: Carol Booth 218-666-0054.
EIS No. 20090161, Draft EIS, AFS, MT, Marsh and Tarhead Allotment 
Management Plans, Proposes to Authorize Grazing of Livestock under 10-
Year Permits, Lincoln Ranger District, Helena National Forest, Lewis 
and Clark County, MT, Comment Period Ends: 07/06/2009, Contact: Amber 
Kamps 406-362-7002.
EIS No. 20090162, Final EIS, SFW, CA, Cullinan Ranch Unit Restoration 
Project, Proposing a Restoration Plan for 1,500 Acres of Former 
Hayfield Farm Land, San Pablo Bay, Issuance of Permits and/or Approval 
from Section 7 Endangered Species Act and U.S. Army COE Section 404 
Permit, San Pablo Bay National Wildlife Refuge, Solano and Napa 
Counties, CA, Wait Period Ends: 06/22/2009, Contact: Christy Smith 707-
769-4200.
EIS No. 20090163, Final EIS, NPS, SD, Minuteman Missile National 
Historic Site, General Management Plan, Implementation, Jackson and 
Pennington Counties, SD, Wait Period Ends: 06/22/2009, Contact: Nick 
Chevance 402-661-1844.
EIS No. 20090164, Draft EIS, FRC, ME, Downeast Liquefied Natural Gas

[[Page 24007]]

(LNG) Project, Construction and Operation, Proposed Liquefied Natural 
Gas (LNG) Terminal, Natural Gas Pipeline and Associated Facilities, 
Washington County, ME, Comment Period Ends: 07/06/2009, Contact: 
Patricia Schaub 1-866-208-3372.
EIS No. 20090165, Final EIS, AFS, UT, Dixie National Forest Motorized 
Travel Plan, Implementation, Dixie National and the Teasdale portion of 
the Fremont River Ranger District on the Fishlake National Forest, 
Garfield, Iron, Kane, Piute, Washington and Wayne Counties, UT, Wait 
Period Ends: 06/22/2009, Contact: Andi Falsetto 435-896-9233.
EIS No. 20090166, Draft Supplement, COE, LA, Calcasieu River and Pass, 
Louisiana Dredged Material Management Plan, Implementation, Calcasieu 
Ship Channel, Port of Lake Charles, Calcasieu and Cameron Parishes, LA, 
Wait Period Ends: 07/06/2009, Contact: Sandra Stiles 504-862-1583.
EIS No. 20090167, Final EIS, FAA, AK, Sitka Rocky Gutierrez Airport 
Master Plan, Improvements to the Runway Safety Area, Taxiway, Seaplane 
Pullout, Approach Lighting System, and the Seawall, U.S. Army COE 
Section 10 and 404 Permits, NPDES Permit, AK, Wait Period Ends: 06/22/
2009, Contact: Patricia Sullivan 907-271-5454.

Amended Notices

EIS No. 20090048, Draft EIS, AFS, MT, Montanore Project, Proposes to 
Construct a Copper and Silver Underground Mine and Associated 
Facilities, Including a New Transmission Line, Plan-of-Operation 
Permit, Kootenai National Forest, Sanders County, MT, Wait Period Ends: 
07/27/2009, Contact: Bobbie Lacklen 406-283-7681. Revision to FR Notice 
Published 02/27/2009: Extending Comment Period from 05/28/2009 to 07/
27/2009.
EIS No. 20090123, Draft EIS, FHW, MS, Greenville Connector Project, 
from Relocated U.S. 82 to Proposed I-69 Corridor south of Benoit, City 
of Greenville, Washington and Bolivar Counties, MS, Wait Period Ends: 
07/06/2009, Contact: Andrew Hughes, P.E. 601-965-4217. Revision of FR 
Notice Published 04/24/2009: Extending Comment Period from 06/08/2009 
to 07/06/2009.

    Dated: May 19, 2009.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities.
 [FR Doc. E9-12012 Filed 5-21-09; 8:45 am]

BILLING CODE 6560-50-P