[Federal Register: June 19, 2009 (Volume 74, Number 117)]
[Notices]               
[Page 29198-29199]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr19jn09-63]                         

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2660-024]

 
Domtar Maine Corporation; Notice of Application Accepted for 
Filing and Soliciting Motions To Intervene and Protests

June 15, 2009.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: New License.
    b. Project No.: 2660-024.
    c. Date Filed: March 19, 2009.
    d. Applicant: Domtar Maine Corporation.
    e. Name of Project: Forest City Project.
    f. Location: On Forest City Stream, a tributary of the St. Croix 
River in Washington and Aroostock Counties, Maine and Canada.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Mr. Scott Beal, Domtar Maine Corporation, 144 
Main Street, Baileyville, Maine 04694, (207) 427-4004.
    i. FERC Contact: John Costello, (202) 502-6119.
    j. Deadline for filing motions to intervene and protests: 60 days 
from the issuance date of this notice.
    All documents (original and eight copies) should be filed with: 
Kimberly

[[Page 29199]]

D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First 
Street, NE., Washington, DC 20426.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    Motions to intervene and protests may be filed electronically via 
the Internet in lieu of paper. The Commission strongly encourages 
electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions 
on the Commission's Web site (http://www.ferc.gov/docs-filing/
ferconline.asp) under the ``e-filing'' link. For a simpler method of 
submitting text only comments, click on ``Quick Comment.''
    k. This application has been accepted, but is not ready for 
environmental analysis at this time.
    l. The existing Forest City Project comprises an earth embankment 
dam containing a gated timber spillway and two impoundments (East Grand 
and North Lakes). There are no generating facilities located at the 
project. Approximately one-quarter of the 544-foot-long dam (i.e., 
approximately 147 feet) is within the United States, the remaining 
section of the dam is located in Canada. The United States (western) 
section of the dam is an earth embankment measuring approximately 110-
feet-long with a maximum height of 12 feet. The center section of the 
dam (i.e., that portion located in the river channel) contains a 55-
foot-wide gated timber crib spillway structure with three wooden gates 
(gates 1 and 2 are located within the United States). The spillway is 
approximately 33 feet wide with an elevation of 426.61 feet msl. A 5-
foot-wide vertical slot design fishway is located in Canada. The 
eastern (Canadian) embankment is an earth structure approximately 397-
feet-long, 30-feet-long with a crest elevation of 437.27 feet msl. No 
new construction is proposed.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-
866-208-3676, or for TTY, (202) 502-8659. A copy is also available for 
inspection and reproduction at the address in item h above.
    You may also register online at http://www.ferc.gov/docs-filing/
esubscription.asp to be notified via e-mail of new filings and 
issuances related to this or other pending projects. For assistance, 
contact FERC Online Support.
    n. Anyone may submit a protest or a motion to intervene in 
accordance with the requirements of Rules of Practice and Procedure, 18 
CFR 385.210, 385.211, and 385.214. In determining the appropriate 
action to take, the Commission will consider all protests filed, but 
only those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any protests 
or motions to intervene must be received on or before the specified 
deadline date for the particular application.
    All filings must (1) bear in all capital letters the title 
``PROTEST'' or ``MOTION TO INTERVENE;'' (2) set forth in the heading 
the name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. 
Agencies may obtain copies of the application directly from the 
applicant. A copy of any protest or motion to intervene must be served 
upon each representative of the applicant specified in the particular 
application.

Kimberly D. Bose,
Secretary.
[FR Doc. E9-14453 Filed 6-18-09; 8:45 am]