[Federal Register: June 22, 2009 (Volume 74, Number 118)]
[Rules and Regulations]
[Page 29428-29430]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr22jn09-8]
[[Page 29428]]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 165
[Docket No. USCG-2009-0483]
RIN 1625-AA00
Safety Zone; Target Fireworks, Detroit River, Detroit, MI
AGENCY: Coast Guard, DHS.
ACTION: Temporary final rule.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard is establishing a temporary safety zone in the
Captain of the Port Detroit Zone on the Detroit River, Detroit,
Michigan. This Zone is intended to restrict vessels from portions of
the Detroit River during the Target Fireworks. This temporary safety
zone is necessary to protect spectators and vessels from the hazards
associated with fireworks displays.
DATES: This rule is effective from 7 a.m., June 20, 2009 until 12:15
a.m., June 26, 2009.
ADDRESSES: Documents indicated in this preamble as being available in
the docket are part of docket USCG-2009-0483 and are available online
by going to http://www.regulations.gov, selecting the Advanced Docket
Search option on the right side of the screen, inserting USCG-2009-0483
in the Docket ID box, pressing Enter, and then clicking on the item in
the Docket ID column. They are also available for inspection or copying
at the following location: The Docket Management Facility (M-30), U.S.
Department of Transportation, West Building Ground Floor, Room W12-140,
1200 New Jersey Avenue, SE., Washington, DC 20590, between 9 a.m. and 5
p.m., Monday through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary rule, call or e-mail CDR Joseph Snowden, Prevention
Department, Sector Detroit, Coast Guard; telephone (313) 568-9508, e-
mail Joseph.H.Snowden@uscg.mil. If you have questions on viewing the
docket, call Renee V. Wright, Program Manager, Docket Operations,
telephone 202-366-9826.
SUPPLEMENTARY INFORMATION:
Regulatory Information
The Coast Guard is issuing this temporary final rule without prior
notice and opportunity to comment pursuant to authority under section
4(a) of the Administrative Procedure Act (APA) (5 U.S.C. 553(b)). This
provision authorizes an agency to issue a rule without prior notice and
opportunity to comment when the agency for good cause finds that those
procedures are ``impracticable, unnecessary, or contrary to the public
interest.'' Under 5 U.S.C. 553(b)(B), the Coast Guard finds that good
cause exists for not publishing a notice of proposed rulemaking (NPRM)
with respect to this rule because the permit application was not
received in time to publish an NPRM followed by a final rule before the
effective date and because immediate action is necessary to protect the
safety of spectators and vessels.
Under 5 U.S.C. 553(d)(3), the Coast Guard finds that good cause
exists for making this rule effective less than 30 days after
publication in the Federal Register. Delaying this rule would be
contrary to the public interest of ensuring the safety of spectators
and vessels during this event, and immediate action is necessary to
prevent possible loss of life and property. The Coast Guard has not
received any complaints or negative comments previously with regard to
events of this type and duration.
Background and Purpose
This temporary safety zone is necessary to ensure the safety of
vessels and spectators from hazards associated with a fireworks
display. Such hazards include obstructions to the waterway that may
cause marine casualties and the explosive danger of fireworks and
debris falling into the water that may cause death or serious bodily
harm. Establishing a safety zone to control vessel movement around the
location of the launch platform will help ensure the safety of persons
and property at these events and help minimize the associated risks.
Discussion of Rule
A temporary safety zone is necessary to ensure the safety of
spectators and vessels during the setup, loading, and launching of the
Target Fireworks Display. The fireworks display will occur between 10
p.m. and 10:45 p.m., June 24, 2009. In the event of inclement weather,
the fireworks display will occur between 10 p.m. and 10:45 p.m., June
25, 2009.
Three temporary safety zone areas will be in effect at different
periods throughout the enforcement of this rule. The first safety zone
area will encompass all waters of the Detroit River bounded by the arc
of a circle with a 900-foot radius with its center in approximate
position 42[deg]19'23'' N, 083[deg]04'34'' W from 7 a.m. to 9 p.m. on
June 20, 2009, from 6 a.m. to 9 p.m. June 21, 2009, from 6 a.m. to 9
p.m. June 22, 2009, from 6 a.m. to 9 p.m. June 23, 2009 and from 6 a.m.
to 5 p.m. on June 24, 2009, and in the event of inclement weather, from
6 a.m. to 5 p.m. on June 25, 2009.
The second safety zone area will encompass a portion of the Detroit
River bounded on the South by the International Boundary line, on the
West by 83[deg]03'30'' W, on the North by the City of Detroit shoreline
and on the East by 083[deg]01'15'' W from 5 p.m. on June 24, 2009
through 12:15 a.m. on June 25, 2009, and in the event of inclement
weather, from 5 p.m. on June 25 to 12:15 a.m. on June 26, 2009.
The third safety zone area will restrict vessels 65 feet in length
or greater from navigation or anchorage within a portion of the Detroit
River bounded on the South by the International Boundary line, on the
West by the Ambassador Bridge, on the North by the City of Detroit
shoreline, and on the East by a line near the downstream end of Belle
Isle starting at the U.S. shoreline at position 42[deg]20'17'' N;
083[deg]00'39'' W, and extending to the International Boundary line at
position 42[deg]19'53'' N; 083[deg]00'15'' W from 8 p.m. on June 24,
2009 through 12:15 a.m. on June 25, 2009, and in the event of inclement
weather, from 8 p.m. on June 25 to 12:15 a.m. on June 26, 2009.
In the event of inclement weather, the date of the fireworks
display will be June 25, 2009. All geographic coordinates are North
American Datum of 1983 (NAD 83).
All persons and vessels shall comply with the instructions of the
Coast Guard Captain of the Port or the designated on scene patrol
personnel. Entry into, transiting, or anchoring within the safety zone
is prohibited unless authorized by the Captain of the Port Detroit or
his designated on scene representative. The Captain of the Port or his
designated on scene representative may be contacted via VHF Channel 16.
Regulatory Analyses
We developed this rule after considering numerous statutes and
executive orders related to rulemaking. Below we summarize our analyses
based on 13 of these statutes or executive orders.
Regulatory Planning and Review
This rule is not a significant regulatory action under section 3(f)
of Executive Order 12866, Regulatory Planning and Review, and does not
require an assessment of potential costs and benefits under section
6(a)(3) of that Order. The Office of Management and Budget has not
reviewed it under that
[[Page 29429]]
Order. It is not ``significant'' under the regulatory policies and
procedures of the Department of Homeland Security (DHS).
This determination is based on the minimal time that vessels will
be restricted from the zone and the zone is an area where the Coast
Guard expects insignificant adverse impact to mariners from the zone's
activation.
Small Entities
Under the Regulatory Flexibility Act (5 U.S.C. 601-612), we have
considered whether this rule would have a significant economic impact
on a substantial number of small entities. The term ``small entities''
comprises small businesses, not-for-profit organizations that are
independently owned and operated and are not dominant in their fields,
and governmental jurisdictions with populations of less than 50,000.
The Coast Guard certifies under 5 U.S.C. 605(b) that this rule will
not have a significant economic impact on a substantial number of small
entities.
This rule will affect the following entities, some of which may be
small entities: The owners and operators of vessels intending to
transit or anchor in a portion of the Detroit River near Detroit, MI
between 7 a.m. on June 20, 2009 and 12 a.m. on June 25, 2009.
This safety zone will not have a significant economic impact on a
substantial number of small entities for the following reasons: This
rule will only be in effect for a few days for one event, and
throughout most of the enforcement period, navigation around the safety
zone will be available. In the event that this temporary safety zone
affects shipping, commercial vessels may request permission from the
Captain of the Port Detroit to transit through the safety zone. The
Coast Guard will give notice to the public via a Broadcast Notice to
Mariners that the regulation is in effect.
Assistance for Small Entities
Under section 213(a) of the Small Business Regulatory Enforcement
Fairness Act of 1996 (Pub. L. 104-121), we offer to assist small
entities in understanding the rule so that they can better evaluate its
effects on them and participate in the rulemaking process.
Small businesses may send comments on the actions of Federal
employees who enforce, or otherwise determine compliance with, Federal
regulations to the Small Business and Agriculture Regulatory
Enforcement Ombudsman and the Regional Small Business Regulatory
Fairness Boards. The Ombudsman evaluates these actions annually and
rates each agency's responsiveness to small business. If you wish to
comment on actions by employees of the Coast Guard, call 1-888-REG-FAIR
(1-888-734-3247). The Coast Guard will not retaliate against small
entities that question or complain about this rule or any policy or
action of the Coast Guard.
Collection of Information
This rule calls for no new collection of information under the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501-3520).
Federalism
A rule has implications for Federalism under Executive Order 13132,
Federalism, if it has a substantial direct effect on State or local
governments and would either preempt State law or impose a substantial
direct cost of compliance on them. We have analyzed this rule under
that Order and have determined that it does not have implications for
Federalism.
Unfunded Mandates Reform Act
The Unfunded Mandates Reform Act of 1995 (2 U.S.C. 1531-1538)
requires Federal agencies to assess the effects of their discretionary
regulatory actions. In particular, the Act addresses actions that may
result in the expenditure by a State, local, or tribal government, in
the aggregate, or by the private sector of $100,000,000 or more in any
one year. Though this rule will not result in such an expenditure, we
do discuss the effects of this rule elsewhere in this preamble.
Taking of Private Property
This rule will not effect a taking of private property or otherwise
have taking implications under Executive Order 12630, Governmental
Actions and Interference with Constitutionally Protected Property
Rights.
Civil Justice Reform
This rule meets applicable standards in sections 3(a) and 3(b)(2)
of Executive Order 12988, Civil Justice Reform, to minimize litigation,
eliminate ambiguity, and reduce burden.
Protection of Children
We have analyzed this rule under Executive Order 13045, Protection
of Children From Environmental Health Risks and Safety Risks. This rule
is not an economically significant rule and does not create an
environmental risk to health or risk to safety that may
disproportionately affect children.
Indian Tribal Governments
This rule does not have tribal implications under Executive Order
13175, Consultation and Coordination With Indian Tribal Governments,
because it does not have a substantial direct effect on one or more
Indian tribes, on the relationship between the Federal Government and
Indian tribes, or on the distribution of power and responsibilities
between the Federal Government and Indian tribes.
Energy Effects
We have analyzed this rule under Executive Order 13211, Actions
Concerning Regulations That Significantly Affect Energy Supply,
Distribution, or Use. We have determined that it is not a ``significant
energy action'' under that order because it is not a ``significant
regulatory action'' under Executive Order 12866 and is not likely to
have a significant adverse effect on the supply, distribution, or use
of energy. The Administrator of the Office of Information and
Regulatory Affairs has not designated it as a significant energy
action. Therefore, it does not require a Statement of Energy Effects
under Executive Order 13211.
Technical Standards
The National Technology Transfer and Advancement Act (NTTAA) (15
U.S.C. 272 note) directs agencies to use voluntary consensus standards
in their regulatory activities unless the agency provides Congress,
through the Office of Management and Budget, with an explanation of why
using these standards would be inconsistent with applicable law or
otherwise impractical. Voluntary consensus standards are technical
standards (e.g., specifications of materials, performance, design, or
operation; test methods; sampling procedures; and related management
systems practices) that are developed or adopted by voluntary consensus
standards bodies.
This rule does not use technical standards. Therefore, we did not
consider the use of voluntary consensus standards.
Environment
We have analyzed this rule under Department of Homeland Security
Management Directive 023-01 and Commandant Instruction M16475.lD, which
guide the Coast Guard in complying with the National Environmental
Policy Act of 1969 (NEPA) (42 U.S.C. 4321-4370f), and have concluded
this action is one of a category of actions which do not individually
or cumulatively have a significant effect on the human
[[Page 29430]]
environment. This rule is categorically excluded, under figure 2-1,
paragraph (34)(g), of the Instruction. This rule involves the
establishment of a safety zone. Based on our preliminary determination,
there are no factors in this case that would limit the use of a
categorical exclusion under section 2.B.2 of the Instruction.
Therefore, we believe that this rule should be categorically excluded,
under figure 2-1, paragraph (34)(g), of the Instruction, from further
environmental documentation. Because this event establishes a safety
zone, paragraph (34)(g) of the Instruction applies. An environmental
analysis checklist and a categorical exclusion determination are
available in the docket where indicated under ADDRESSES.
List of Subjects in 33 CFR Part 165
Harbors, Marine safety, Navigation (water), Reporting and
recordkeeping requirements, Security measures, Waterways.
0
For the reasons discussed in the preamble, the Coast Guard amends 33
CFR part 165 as follows:
PART 165--REGULATED NAVIGATION AREAS AND LIMITED ACCESS AREAS
0
1. The authority citation for part 165 continues to read as follows:
Authority: 33 U.S.C. 1226, 1231; 46 U.S.C. Chapter 701, 3306,
3703; 50 U.S.C. 191, 195; 33 CFR 1.05-1, 6.04-1, 6.04-6, and 160.5;
Pub. L. 107-295, 116 Stat. 2064; Department of Homeland Security
Delegation No. 0170.1.
0
2. Add new temporary Sec. 165.T09-0483 as follows:
Sec. 165.T09-0483 Safety Zone; Target Fireworks; Detroit River;
Detroit, MI.
(a) Location. The following areas are temporary safety zones:
(1) The first safety zone area will encompass all waters of the
Detroit River bounded by the arc of a circle with a 900-foot radius
with its center in approximate position 42[deg]19'23'' N,
083[deg]04'34'' W (NAD 83).
(2) The second safety zone area will encompass a portion of the
Detroit River bounded on the South by the International Boundary line,
on the West by 83[deg]03'30'' W, on the North by the City of Detroit
shoreline and on the East by 083[deg]01'15'' W (NAD 83).
(3) The third safety zone will encompass a portion of the Detroit
River bounded on the South by the International Boundary line, on the
West by the Ambassador Bridge, on the North by the City of Detroit
shoreline, and on the East by the downstream end of Belle Isle. The
Captain of the Port Detroit has determined that vessels below 65 feet
in length may enter this zone.
(b) Effective Period.
(1) The first safety zone is effective from 7 a.m. on June 20, 2009
to 5 p.m. on June 25 2009. The first safety zone will be enforced from
7 a.m. to 9 p.m. on June 20, 2009, from 6 a.m. to 9 p.m. June 21, 2009,
from 6 a.m. to 9 p.m. June 22, 2009, from 6 a.m. to 9 p.m. June 23,
2009 and from 6 a.m. to 5 p.m. on June 24, 2009. In the event of
inclement weather, the first safety zone will also be enforced from 6
a.m. to 5 p.m. on June 25, 2009.
(2) The second safety zone is effective from 5 p.m. on June 24,
2009 through 12:15 a.m. on June 26, 2009. The second safety zone will
be enforced from 5 p.m. on June 24, 2009 through 12:15 a.m. on June 25,
2009. In the event of inclement weather, the second safety zone will
also be enforced from 5 p.m. on June 25, 2009 to 12:15 a.m. on June 26,
2009.
(3) The third safety zone is effective from 8 p.m. on June 24, 2009
through 12:15 a.m. on June 26, 2009. The third safety zone will be
enforced from 8 p.m. on June 24, 2009 through 12:15 a.m. on June 25,
2009. In the event of inclement weather, the third safety zone will
also be enforced from 8 p.m. on June 25, 2009 to 12:15 a.m. on June 26,
2009.
(c) Regulations.
(1) In accordance with the general regulations in Sec. 165.23 of
this part, entry into, transiting, or anchoring within this safety zone
is prohibited unless authorized by the Captain of the Port Detroit, or
his designated on-scene representative.
(2) This safety zone is closed to all vessel traffic, except as may
be permitted by the Captain of the Port Detroit or his designated on-
scene representative.
(3) The ``on-scene representative'' of the Captain of the Port is
any Coast Guard commissioned, warrant, or petty officer who has been
designated by the Captain of the Port to act on his behalf. The on-
scene representative of the Captain of the Port will be aboard either a
Coast Guard or Coast Guard Auxiliary vessel. The Captain of the Port or
his designated on scene representative may be contacted via VHF Channel
16.
(4) Vessel operators desiring to enter or operate within the safety
zone shall contact the Captain of the Port Detroit or his on-scene
representative to obtain permission to do so.
(5) Vessel operators given permission to enter or operate in the
safety zone must comply with all directions given to them by the
Captain of the Port or his on-scene representative.
Dated: June 8, 2009.
F.M. Midgette,
Captain, U.S. Coast Guard, Captain of the Port Detroit.
[FR Doc. E9-14549 Filed 6-19-09; 8:45 am]
BILLING CODE 4910-15-P