[Federal Register: September 3, 2009 (Volume 74, Number 170)]
[Notices]
[Page 45627-45628]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr03se09-42]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12187-013]
Price Dam Partnership, Limited; Notice of Request for Extension
of Time To Commence and Complete Project Construction and Soliciting
Comments, Motions To Intervene, and Protests
August 27, 2009.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Request for Extension of Time.
b. Project No: 12187-013.
c. Date Filed: August 24, 2009.
d. Applicant: Price Dam Partnership, Limited.
e. Name of Project: Price Dam Hydroelectric Project.
f. Location: At the existing St. Louis District's U.S. Army Corps
of Engineers' (Corps) Melvin Price Locks & Dam on the Mississippi
River, in the city of Alton, Wood River Township, Madison
[[Page 45628]]
County, Illinois. The project would occupy about 1.81 acres of Federal
lands.
g. Pursuant to: Public Law 111-60, 123 STAT. 1995.
h. Applicant Contact: John A. Whittaker, IV, Winston & Strawn, LLP,
1700 K Street, NW., Washington, DC 20006; (202) 282-5766 and e-mail:
jwhittak@winston.com.
i. FERC Contact: Diane M. Murray, Telephone: (202) 502-8838 and e-
mail: diane.murray@ferc.gov.
j. Deadline for Filing Comments, Motions To Intervene, and
Protests: September 28, 2009. Please include the project number (P-
12187-013) on any comments.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency. A copy
of any motion to intervene must also be served upon each representative
of the Applicant specified in the particular application.
k. Description of Request: The licensee requests that the
Commission grant a two-year extension of time from the existing
deadline of July 28, 2009 to July 28, 2011 to commence project
construction of the Price Dam Hydroelectric Project. This will be the
first 2-year extension of three authorized by Public Law No. 111-60.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street, NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at http://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. You may also
register online at http://www.ferc.gov/docs-filing/esubscription.asp to
be notified via e-mail of new filings and issuances related to this or
other pending projects. For assistance, call toll-free 1-866-208-3676
or e-mail FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A
copy is also available for inspection and reproduction at the address
in item h. above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene--Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
and .214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Any filings must bear in all capital letters the title
``COMMENTS'', ``PROTEST'', or ``MOTION TO INTERVENE'', as applicable,
and the Project Number of the particular application to which the
filing refers.
p. Agency Comments--Federal, State, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
q. Comments, protests, and interventions may be filed
electronically via the Internet. See, 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's Web site at http://www.ferc.gov
under the ``e-Filing'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-21244 Filed 9-2-09; 8:45 am]
BILLING CODE 6717-01-P