EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under section 309 of the Clean Air Act and
Section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at 202-564-7146 or http://www.epa.gov/compliance/
nepa/. An explanation of the ratings assigned to draft environmental
impact statements (EISs) was published in FR dated July 17, 2009 (74 FR
34754).
Draft EISs
EIS No. 20080518, ERP No. D-BLM-K67058-NV, Bald Mountain Mine Northern
Operations Area Project, Proposes to Expand Current Mining Operations
at several Existing Pits, Rock Disposal Areas, Heap Leach Pads,
Processing Facilities, and Interpit Area, Combining the Bald Mountain
Mine Plan of Operations
[[Page 50964]]
Boundary and the Mooney Basin Operation Area Boundary, White Pine
County, NV.
Summary: EPA expressed environmental objections because waste rock
from several pits could generate leachate with high concentrations of
metals and metalloids, and degrade water quality if the leachate should
reach groundwater or surface waters, or if pit lakes would form. Also,
EPA expressed concerns about potential impacts to air quality and the
lack of suitable soil for reclamation. EPA recommends the additional
information on waste rock geochemical characterization, potential
impacts to water and air resources, mitigation and monitoring, and
closure and reclamation. Rating EO2.
EIS No. 20090047, ERP No. D-COE-E39076-AL, Foley Land Cut Portion of
the Gulf Intracoastal Waterway, Proposed Construction of Residential,
Commercial and Marine Development, Gulf Shores and Orange Beach,
Baldwin County, AL.
Summary: EPA expressed environmental concerns about water quality
and hydrological impacts. Specific BMPs designed to minimize water
quality impacts should be included in each permit application as a
special condition of the permit. Rating EC2.
EIS No. 20090123, ERP No. D-FHW-E40824-MS, Greenville Connector
Project, from Relocated US 82 to Proposed I-69 Corridor south of
Benoit, City of Greenville. Washington and Bolivar Counties, MS.
Summary: EPA expressed concern about wetland and stream impacts,
flood storage loss, and noise impacts, and requested additional
avoidance, minimization, and/or mitigation measures for these impacts.
EPA also recommended commitments to bridge or narrow the ROW width,
wherever possible, over major aquatic resources. Rating EC2.
EIS No. 20090190, ERP No. D-AFS-L65572-OR, Wallowa-Whitman National
Forest Travel Management Plan, Designate Roads Trails and Areas for
Motor Vehicle User, Baker, Grant, Umatilla, Union and Wallowa Counties,
OR.
Summary: EPA expressed environmental concerns about potential
impacts to water quality, fisheries, riparian habitat and soils, and
recommended increased protective measures for water quality. Rating
EC2.
EIS No. 20090198, ERP No. D-AFS-K65371-CA, Shasta-Trinity National
Forest Motorized Travel Management Project, Proposal to Prohibit Cross-
County Motor Vehicle Travel off Designated National Forest
Transportation System (NFTS) Roads, Motorized Trails and Areas by the
Public Except as Allowed by Permit or other Authorization (excluding
snowmobile use), CA.
Summary: EPA expressed environmental concerns about the scope of
the travel management planning process and potential impacts on water
quality and cultural resources. Rating EC2.
Final EISs
EIS No. 20090268, ERP No. F-BLM-L65545-ID, Three Rivers Stone Quarry
Expansion Project, Proposing to Expand the Quarry Operation up to an
Additional 73 Acres to Increase Mine Production of Flaystone, Custer
County, ID.
Summary: EPA continues to have environmental concerns about water
quality impacts from potential stormwater ponds being breached and
spills. EPA recommends that contingency measures be included to control
high flood events and prevent contamination to surface water.
EIS No. 20090271, ERP No. F-GSA-K40271-CA, San Ysidro Land Port of
Entry (LPOE) Improvement Project, Propose the Configuration and
Expansion of the Existing (LPOE), San Ysidro, CA.
Summary: EPA continues to have environmental concerns about air
quality impacts from increased congestion; project impacts to port
access by pedestrians, cyclists, and transit; and environmental
justice.
EIS No. 20090274, ERP No. F-FHW-K40266-CA, Marin-Sonoma Narrows (MSN)
HOV Widening Project, Propose to Relieve Recurrent Congestion along US
101 south of the Route 37 Interchange in the City of Novato (Marin
County) and ends north of the Corona Road Overcrossing in the City of
Petaluma (Sonoma County), Marin and Sonoma Counties, CA.
Summary: EPA does not object to the proposed project, but
encourages project sponsors to continue efforts to minimize impacts to
wetlands and waters through project design modifications where
possible.
EIS No. 20090275, ERP No. F-FHW-E40814-KY, I-65 to US 31 W Access
Improvement Project, To Meet the Existing and Future Transportation
Demand, in northeast Bowling Green, Warren County, KY.
Summary: EPA continues to have environmental concern about
groundwater and karst topography impacts, and requested additional
mitigation to reduce these impacts.
EIS No. 20090291, ERP No. F-SFW-K64027-NV, Desert National Wildlife
Refuge Complex, Ash Meadows, Desert, Moapa Valley, and Pahranagat
National Wildlife Refuges, Comprehensive Conservation Plan,
Implementation, Clark, Lincoln, and Nye Counties, NV.
Summary: EPA does not object to the proposed project.
EIS No. 20090292, ERP No. F-USA-K11117-CA, Camp Parks Real Property
Master Plan and Real Property Exchange, Redevelopment of the Cantonment
Area, NPDES Permit, US COE Section 4040 Permit, Alamada and Contra
Costa Counties, CA.
Summary: EPA does not object to the proposed action.
EIS No. 20090276, ERP No. FS-COE-L90019-WA, Commencement Bay
``Reauthorization'' of Dredged Material Management Program Disposal
Site, Implementation, Central Puget Sound, Tacoma, WA.
Summary: EPA's previous issues have been resolved; therefore, EPA
does not object to the proposed action.
Dated: September 29, 2009.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.