[Federal Register: October 2, 2009 (Volume 74, Number 190)]
[Notices]               
[Page 50963]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr02oc09-31]                         

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-8597-8]

 
Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-1399 or http://www.epa.gov/compliance/nepa/ 
Weekly receipt of Environmental Impact Statements Filed 09/21/2009 
Through 09/28/2009 Pursuant to 40 CFR 1506.9.

EIS No. 20090332, Draft EIS, AFS, NV, Middle Kyle Canyon Complex 
Project, Construction and Operation of a Recreation Complex within the 
Spring Mountains National Recreation Area, Humboldt-Toiyabe National 
Forest, Clark County, NV, Comment Period Ends: 11/16/2009, Contact: Hal 
Peterson, 702-839-5572.
EIS No. 20090333, Final EIS, COE, MN, Mississippi River Headwaters 
Reservoir Operating Plan Evaluation (ROPE), Proposed Revision to the 
Operating Plan for the Reservoirs, Upper Mississippi River Headwaters, 
Bemidji to St. Paul, MN, Wait Period Ends: 11/06/2009, Contact: Steven 
J. Clark, 651-290-5278.
EIS No. 20090334, Final EIS, FRC, 00, Hubline/East to West Project, 
Proposes to Modify its Existing Natural Gas Transmission Pipeline 
System in MA, CT, RI and NJ, Wait Period Ends: 11/02/2009, Contact: 
Julia Bovey, 1-866-208-3372.
EIS No. 20090335, Final EIS, AFS, AZ, Black River Exchange Project, 
Proposal to Exchange Federal and Non-Federal Lands, Apache-Sitgreaves 
National Forests, Apache County, AZ, Wait Period Ends: 11/02/2009, 
Contact: Chris Kropp, 928-333-4301.
EIS No. 20090336, Third Final Supplement, FHW, VT, Southern Connector/
Champlain Parkway Project (MEGC-M5000(1)), Construction from 
Interchange of I-189 to Shelburne Street (US Route &) and Extending 
westerly and northerly to the City of Center District within the City 
of Burlington, Chittenden County, VT, Wait Period Ends: 11/02/2009, 
Contact: Kenneth R. Sikora, Jr., 802-828-4423.
EIS No. 20090337, Draft EIS, BLM, OR, Vegetation Treatments Using 
Herbicides on Bureau of Land Management (BLM) Lands in Oregon, 
Implementation, OR, Comment Period Ends: 11/30/2009, Contact: Todd 
Thompson, 503-808-6026.
EIS No. 20090338, Final EIS, AFS, OR, Big Summit Allotment Management 
Plan, Proposes to Reauthorize Cattle Term Grazing Permits, Construct 
Range Improvements, and Restore Riparian Vegetation on Five Allotments, 
Lookout Mountain Ranger District, Ochoco National Forest, Crook County, 
OR, Wait Period Ends: 11/02/2009, Contact: Marcy Anderson, 541-416-
6463.
EIS No. 20090339, Final EIS, AFS, 00, Ashley National Forest Motorized 
Travel Plan, To Improve Management of Public Summer Motorized Use by 
Designating Roads and Motorized Trails and Limiting Dispersed Camping 
to Areas, Duchesne, Daggett, Uintah Counties, Utah and Sweetwater 
County, Wyoming, Wait Period Ends: 11/02/2009, Contact: Kris Rutledge, 
435-781-5196.

Amended Notices

EIS No. 20090250, Draft EIS, IBR, NV, Walker River Basin Acquisition 
Program, To Provide Water to Walker Lake an at Risk Natural Desert 
Terminal Lake, Funding, Walker River Basin, NV, Comment Period Ends: 
10/05/2009, Contact: Caryn Huntt DeCarol, 775-884-8352. Revision to FR 
Notice Published 07/31/2009: Reopening the Comment Period from 09/14/
2009 to 10/05/2009.
EIS No. 20090272, Draft EIS, UAF, 00, Modification of the Condor 1 and 
Condor 2 Military Operation Areas, 104th Fighter Wing of the 
Massachusetts Air National Guard Base (ANG) Proposes to Combine the 
Condor 1 and Condor 2 MOA, ME and NH, Comment Period Ends: 01/01/2010, 
Contact: Jay Nash, 703-614-0346. Revision to FR Notice Published 08/07/
2009: Correction from 09/21/2009 to 11/09/2010 should be 09/21/2009 to 
01/01/2010.
EIS No. 20090297, Final EIS, EPA, ND, Mandan, Hidatsa and Arikara 
Nation's Proposed Clean Fuels Refinery Project, Construction and 
Operation of a New 13,000 Barrel of Production per day Clean Fuels 
Refinery and Grow Hay for Buffalo, NPDES Permit, Fort Berthold Indian 
Reservation, Ward County, ND, Wait Period Ends: 10/28/2009, Contact: 
Steve Wharton, 303-312-6935. Revision to FR Notice Published 08/28/
2009: Extending Comment Period from 09/28/2009 to 10/28/2009.

    Dated: September 29, 2009.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E9-23824 Filed 10-1-09; 8:45 am]

BILLING CODE 6560-50-P