[Federal Register: April 1, 2009 (Volume 74, Number 61)]
[Rules and Regulations]               
[Page 14725-14726]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr01ap09-6]                         

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[USCG-2009-0150]

 
Drawbridge Operation Regulations; Chelsea River, Chelsea and East 
Boston, MA

AGENCY: Coast Guard, DHS.

ACTION: Notice of temporary deviation from regulations.

-----------------------------------------------------------------------

SUMMARY: The Commander, First Coast Guard District, has issued a 
temporary deviation from the regulation governing the operation of the 
P.J. McArdle Bridge across the Chelsea River, mile 0.3, between Chelsea 
and East Boston, Massachusetts. This deviation is

[[Page 14726]]

necessary to facilitate the Chelsea River Revel and 5K Road Race. This 
deviation allows the bridge to remain in the closed position during the 
running of the 5K Road Race and for the remainder of the Chelsea River 
Revel. Vessels that can pass under the draw without a bridge opening 
may do so at all times.

DATES: This deviation is effective from 8 a.m. through 5 p.m. on June 
13, 2009.

ADDRESSES: Documents indicated in this preamble as being available in 
the docket are part of docket USCG-2009-0150 and are available online 
at http://www.regulations.gov. They are also available for inspection 
or copying at two locations: The Docket Management Facility (M-30), 
U.S. Department of Transportation, West Building Ground Floor, Room 
W12-140, 1200 New Jersey Avenue, SE., Washington, DC 20590, between 9 
a.m. and 5 p.m., Monday through Friday, except Federal holidays, and 
the First Coast Guard District, Bridge Branch Office, 408 Atlantic 
Avenue, Boston, Massachusetts 02110, between 7 a.m. and 3 p.m., Monday 
through Friday, except Federal holidays.

FOR FURTHER INFORMATION CONTACT: John McDonald, Project Officer, First 
Coast Guard District, at (617) 223-8364.

SUPPLEMENTARY INFORMATION: The owner of the bridge, the City of Boston, 
requested this temporary deviation. The P.J. McArdle Bridge, across the 
Chelsea River at mile 0.3, between Chelsea and East Boston, 
Massachusetts, has a vertical clearance in the closed position of 21 
feet at mean high water and 30 feet at mean low water. The bridge opens 
on signal as required by 33 CFR 117.593.
    This deviation which allows the bridge to remain closed is 
effective from 8 a.m. through 5 p.m. on June 13, 2009. Vessels able to 
pass under the closed draw may do so at any time. Tankers, and tug and 
barge units transit Chelsea Creek under the McArdle Bridge. Waterway 
users were advised of the requested bridge closure period and offered 
no objection.
    In accordance with 33 CFR 117.35(e), the bridge must return to its 
regular operating schedule immediately at the end of the designated 
time period. This deviation from the operating regulations is 
authorized under 33 CFR 117.35.

    Dated: March 17, 2009.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. E9-7257 Filed 3-31-09; 8:45 am]

BILLING CODE 4910-15-P