    Take notice that on March 24, 2009, ANR Pipeline Company (ANR), 
having its principal office at 717 Texas Street, Houston, Texas 77002, 
filed a prior notice request pursuant to sections 157.205 and 157.208 
of the Federal Energy Regulatory Commission's regulations under the 
Natural Gas Act for authorization to construct, own and operate an 
interconnection with Rockies Express Pipeline, LLC (REX) and related 
facilities in Shelby County, Indiana, under ANR's blanket certificate 
issued in Docket No. CP82-480-000. The filing may also be viewed on the 
Web at http://www.ferc.gov using the ``eLibrary'' link. Enter the 
docket number excluding the last three digits in the docket number 
field to access the document. For assistance, contact FERC at 
FERCOnlineSupport@ferc.gov or call

[[Page 14982]]

toll-free, (866) 208-3676 or TTY, (202) 502-8659.
    Specifically, ANR requests authorization to construct and own the 
``ANR-REX East-Shelby Interconnection Project'' facilities to receive 
up to 560 MMcf/d from REX in Shelby County, Indiana, in connection with 
the REX-East Project certificated by the Commission in Docket No. CP07-
208-000 on May 20, 2008. To establish the project, ANR will install a 
meter station and approximately 324 feet of 20-inch diameter 
interconnecting pipe between the proposed meter station and its 30-inch 
pipelines designated as lines Nos. 501 and 1-501 at the approximate 
Mile Post 735.78. ANR will install and own two 20-inch hot taps, one 
each on Lines 501 and 1-501, along with other appurtenant facilities.
    Any questions regarding the application should be directed to M. 
Catharine Davis, Associate General Counsel, ANR Pipeline Company, 717 
Texas Street, Houston, TX 77002, phone: (832) 320-5509, fax: (832) 320-
6509, e-mail: catharine_davis@transcanada.com, or Robert D. Jackson, 
Director, Rates and Regulatory Affairs, ANR Pipeline Company, 717 
Houston Street, Houston, TX 77002, phone: (832) 320-5487, fax: (832) 
320-6487, e-mail: robert_jackson@transcanada.com.
    Any person may, within 60 days after the issuance of the instant 
notice by the Commission, file pursuant to Rule 214 of the Commission's 
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of 
intervention. Any person filing to intervene or the Commission's staff 
may, pursuant to section 157.205 of the Commission's Regulations under 
the Natural Gas Act (NGA) (18 CFR 157.205) file a protest to the 
request. If no protest is filed within the time allowed therefore, the 
proposed activity shall be deemed to be authorized effective the day 
after the time allowed for protest. If a protest is filed and not 
withdrawn within 30 days after the time allowed for filing a protest, 
the instant request shall be treated as an application for 
authorization pursuant to section 7 of the NGA.
    The Commission strongly encourages electronic filings of comments, 
protests, and interventions via the Internet in lieu of paper. See 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site (http://www.ferc.gov) under the ``e-Filing'' link.

Kimberly D. Bose,
Secretary.
[FR Doc. E9-7344 Filed 4-1-09; 8:45 am]