[Federal Register: April 3, 2009 (Volume 74, Number 63)]
[Notices]
[Page 15257-15258]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr03ap09-22]
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
Department of the Army; Corps of Engineers
Notice of Availability for the Final Environmental Impact
Statement/Environmental Impact Report and a Draft General Conformity
Determination for the Middle Harbor Redevelopment Project, Port of Long
Beach, Los Angeles County, CA
AGENCY: Department of the Army--U.S. Army Corps of Engineers, DoD.
ACTION: Notice of availability.
-----------------------------------------------------------------------
SUMMARY: On May 19, 2008, the U.S. Army Corps of Engineers, Los Angeles
District, Regulatory Division (Corps) in coordination with the Port of
Long Beach (POLB) completed and published the Draft Environmental
Impact Statement/Environmental Impact Report (EIS/EIR) for the Middle
Harbor Redevelopment Project (Project) in the Port of Long Beach. The
Corps and POLB considered all comments received in preparing the Final
EIS/EIR, which is available for a 30-day review (April 3, 2009 through
May 3, 2009). The Final EIS/EIR includes a draft general conformity
determination (see Appendix A-4), pursuant to Section 176(c) of the
Clean Air Act. A general conformity determination is necessary because
Project construction would require Federal action (i.e., issuance of a
Corps permit for activities proposed in navigable waters and waters of
the U.S.) and not all the Federal action's direct and indirect
emissions would be below specified de minimis thresholds (40 CFR
93.153(b)). Pursuant to the general conformity regulations (40 CFR part
93, subpart B), general conformity determinations do not have to be
included in the EIS and can be separately noticed, but the draft
general conformity determination for the Federal action associated with
the
[[Page 15258]]
Project is being included in the Final EIS/EIR in this case.
The Final EIS/EIR, including the draft general conformity
determination, is available for public review during the next 30 days
at the Port of Long Beach, 925 Harbor Plaza, Long Beach, California and
on the Port's Web site: http://www.portoflosangeles.org. In addition,
the Final EIS/EIR, including the draft general conformity
determination, is available at the Long Beach Public Library, Main
Branch, 101 Pacific Avenue, Long Beach, CA 90822.
Any comments received by the Corps and POLB on the Final EIS/EIR or
the included draft general conformity determination during the next 30
days will be considered fully before the Corps makes a final general
conformity determination and finalizes the Record of Decision (ROD) for
the Federal action associated with the Project. The Corps will publish
a notice of a final general conformity determination in the Federal
Register within 30 days of rendering a final decision. The public can
request from the Corps copies of the ROD, which includes responses to
comments on the Final EIS/EIR, including any on the draft general
conformity determination, following publication of a final general
conformity determination and upon execution of the ROD.
FOR FURTHER INFORMATION CONTACT: Questions or comments concerning the
Final EIS/EIR or the included draft general conformity determination
should be provided by May 3, 2009 to Antal Szijj, Senior Project
Manager, North Coast Branch, Regulatory Division, U.S. Army Corps of
Engineers, 2151 Alessandro Drive, Suite 110, Ventura, California 93001,
(805) 585-2147.
SUPPLEMENTARY INFORMATION: None.
Aaron O. Allen,
Acting Chief, Regulatory Division, Los Angeles District.
[FR Doc. E9-7524 Filed 4-2-09; 8:45 am]
BILLING CODE 3710-KF-P