[Federal Register: April 21, 2009 (Volume 74, Number 75)]
[Rules and Regulations]
[Page 18141-18148]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr21ap09-12]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52
[R08-ND-2008-0001; FRL-8892-7]
Approval and Promulgation of Air Quality Implementation Plans;
North Dakota; Update to Materials Incorporated by Reference
AGENCY: Environmental Protection Agency (EPA).
ACTION: Final rule; Notice of administrative change.
-----------------------------------------------------------------------
SUMMARY: EPA is updating the materials submitted by North Dakota that
are incorporated by reference (IBR) into the State Implementation Plan
(SIP). The regulations affected by this update have been previously
submitted by the Governor of North Dakota and approved by EPA. This
update affects the SIP materials that are available for public
inspection at the National Archives and Records Administration (NARA),
the Air and Radiation Docket and Information Center located at EPA
Headquarters in Washington, DC, and the Regional Office.
DATES: Effective Date: This action is effective April 21, 2009.
ADDRESSES: SIP materials which are incorporated by reference into 40
CFR part 52 are available for inspection Monday through Friday, 8 a.m.
to 4 p.m., excluding federal holidays, at the Air Program,
Environmental Protection Agency (EPA), Region 8, 1595 Wynkoop Street,
Denver, Colorado 80202-1129. EPA requests that, if at all possible, you
contact the individual listed in the FOR FURTHER INFORMATION CONTACT
section to arrange a time to view the hard copy of the North Dakota SIP
compilation. An electronic copy of the North Dakota regulations we have
approved for incorporation into the SIP are also available by accessing
http://www.epa.gov/region8/air/sip.html. A hard copy of the regulatory
and source-specific portions of the compilation will also be maintained
at the Air and Radiation Docket and Information Center, EPA West
Building, Room 3334, 1301 Constitution Ave., NW., Washington, DC 20460
and the National Archives and Records Administration (NARA). If you
wish to obtain materials from a docket in the EPA Headquarters Library,
please call the Office of Air and Radiation (OAR) Docket/Telephone
number (202) 566-1742. For information on the availability of this
material at NARA, call (202) 741-6030, or go to: http://
www.archives.gov/federal_register/code_of_federal_regulations/ibr_
locations.html.
FOR FURTHER INFORMATION CONTACT: Amy Platt, EPA Region 8, at (303) 312-
6449, or Platt.Amy@epa.gov.
SUPPLEMENTARY INFORMATION: Throughout this document, wherever ``we'' or
``our'' is used it means the EPA.
I. Background
The SIP is a living document that the State revises as necessary to
address its unique air pollution problems. Therefore, EPA, from time to
time must take action on SIP revisions containing new and/or revised
regulations to make them part of the SIP. On May 22, 1997 (62 FR
27968), EPA revised the procedures for incorporating by reference
Federally-approved SIPs, as a result of consultations between EPA and
the Office of the Federal Register (OFR). The description of the
revised SIP document, IBR procedures and ``Identification of plan''
format are discussed in further detail in the May 22, 1997 Federal
Register. On March 1, 2007 (72 FR 9263), EPA published a document in
the Federal Register beginning the new IBR procedure for North Dakota.
Today's action is an update to the March 1, 2007 document.
II. EPA Action
In this document, EPA is doing the following: (1) Announcing an
update to the IBR material for North Dakota's revisions to its SIP as
of March 1, 2009, including revisions that were approved by EPA on July
19, 2007 (72 FR 39564) and May 27, 2008 (73 FR 30308); and (2) Revising
the entries in paragraphs 52.1820(b), (c), (d), and (e) to reflect this
update.
III. Good Cause Exemption
EPA has determined that today's action falls under the ``good
cause'' exemption in section 553(b)(3)(B) of the Administrative
Procedure Act (APA) which, upon a finding of ``good cause,'' authorizes
agencies to dispense with public participation, and section 553(d)(3),
which allows an agency to make a rule effective immediately (thereby
avoiding the 30-day delayed effective date otherwise provided for in
the APA). Today's rule simply codifies provisions which are already in
effect as a matter of law. Under section 553 of the APA, an agency may
find good cause where procedures are ``impractical, unnecessary, or
contrary to the public interest.'' Public comment is ``unnecessary''
and ``contrary to the public interest'' since the codification only
reflects existing law. Likewise, there is no purpose served by delaying
the effective date of this action. Immediate notice in the CFR benefits
the public by removing outdated citations and incorrect chart entries.
IV. Statutory and Executive Order Review
A. General Requirements
Under Executive Order 12866 (58 FR 51735, October 4, 1993), this
action is not a ``significant regulatory action'' and is therefore not
subject to review by the Office of Management and Budget. For this
reason, this action is also not subject to Executive Order 13211,
``Actions Concerning Regulations That Significantly Affect Energy
Supply, Distribution, or Use'' (66 FR 28355, May 22, 2001). Because the
agency has made a ``good cause'' finding that this action is not
subject to notice-and-comment requirements under the Administrative
Procedure Act or any other statute as indicated in the Supplementary
Information section above, it is not subject to the regulatory
flexibility provisions of the Regulatory Flexibility Act (5 U.S.C. 601
et seq.), or to sections 202 and 205 of the Unfunded Mandates Reform
Act of 1995 (UMRA) (Pub. L. 104-4). In addition, this action does not
significantly or uniquely affect small governments or impose a
significant intergovernmental mandate, as described in sections 203 and
204 of UMRA.
[[Page 18142]]
This rule also does not have tribal implications because it will
not have a substantial direct effect on one or more Indian tribes, on
the relationship between the Federal government and Indian tribes, or
on the distribution of power and responsibilities between the Federal
government and Indian tribes, as specified by Executive Order 13175 (65
FR 67249, November 9, 2000). This action also does not have Federalism
implications because it does not have substantial direct effects on the
States, on the relationship between the national government and the
States, or on the distribution of power and responsibilities among the
various levels of government, as specified in Executive Order 13132 (64
FR 43255, August 10, 1999). This rule also is not subject to Executive
Order 13045, ``Protection of Children from Environmental Health Risks
and Safety Risks'' (62 FR 19885, April 23, 1997), because it is not an
economically significant regulatory action based on health or safety
risks.
This rule does not involve technical standards; thus the
requirements of section 12(d) of the National Technology Transfer and
Advancement Act of 1995 (15 U.S.C. 272 note) do not apply. The rule
also does not involve special consideration of environmental justice
related issues as required by Executive Order 12898 (59 FR 7629,
February 16, 1994). This rule does not impose an information collection
burden under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et
seq.). EPA's compliance with these statutes and Executive Orders for
the underlying rules is discussed in previous actions taken on the
State's rules.
B. Submission to Congress and the Comptroller General
The Congressional Review Act (5 U.S.C. 801 et seq.), as added by
the Small Business Regulatory Enforcement Fairness Act of 1996,
generally provides that before a rule may take effect, the agency
promulgating the rule must submit a rule report, which includes a copy
of the rule, to each House of the Congress and to the Comptroller
General of the United States. Section 808 allows the issuing agency to
make a rule effective sooner than otherwise provided by the CRA if the
agency makes a good cause finding that notice and public procedure is
impracticable, unnecessary or contrary to the public interest. Today's
action simply reformats the codification of provisions which are
already in effect as a matter of law. 5 U.S.C. 808(2). As stated
previously, EPA has made such a good cause finding, including the
reasons therefore, and established an effective date of April 21, 2009.
EPA will submit a report containing this rule and other required
information to the U.S. Senate, the U.S. House of Representatives, and
the Comptroller General of the United States prior to publication of
the rule in the Federal Register. This update to the Identification of
plan for North Dakota is not a ``major rule'' as defined by 5 U.S.C.
804(2).
C. Petitions for Judicial Review
EPA has also determined that the provisions of section 307(b)(1) of
the Clean Air Act pertaining to petitions for judicial review are not
applicable to this action. Prior EPA rulemaking actions for each
individual component of the North Dakota SIP compilation had previously
afforded interested parties the opportunity to file a petition for
judicial review in the United States Court of Appeals for the
appropriate circuit within 60 days of such rulemaking action. Thus, EPA
sees no need to reopen the 60-day period for filing such petitions for
judicial review for this reorganization of the ``Identification of
plan'' section of 40 CFR 52.1820 for North Dakota.
List of Subjects in 40 CFR Part 52
Environmental protection, Air pollution control, Carbon monoxide,
Incorporation by reference, Intergovernmental relations, Lead, Nitrogen
dioxide, Ozone, Particulate matter, Reporting and recordkeeping
requirements, Sulfur oxides, Volatile organic compounds.
Dated: March 31, 2009.
Stephen S. Tuber,
Acting Regional Administrator, Region 8.
Part 52 of chapter I, title 40, Code of Federal Regulations, is
amended as follows:
PART 52--[AMENDED]
0
1. The authority citation for part 52 continues to read as follows:
Authority: 42 U.S.C. 7401 et seq.
Subpart JJ--North Dakota
0
2. Section 52.1820 is amended by revising paragraphs (b), (c), (d), and
(e) to read as follows:
Sec. 52.1820 Identification of plan.
* * * * *
(b) Incorporation by reference. (1) Material listed in paragraphs
(c), (d), and (e) of this section with an EPA approval date prior to
March 1, 2009, was approved for incorporation by reference by the
Director of the Federal Register in accordance with 5 U.S.C. 552(a) and
1 CFR part 51. Material is incorporated as submitted by the State to
EPA, and notice of any change in the material will be published in the
Federal Register. Entries for paragraphs (c), (d), and (e) of this
section with EPA approval dates after March 1, 2009, will be
incorporated by reference in the next update to the SIP compilation.
(2) EPA Region 8 certifies that the rules/regulations provided by
EPA in the SIP compilation at the addresses in paragraph (b)(3) of this
section are an exact duplicate of the officially promulgated state
rules/regulations which have been approved as part of the State
Implementation Plan as of March 1, 2009.
(3) Copies of the materials incorporated by reference may be
inspected at the Environmental Protection Agency, Region 8, 1595
Wynkoop Street, Denver, Colorado, 80202-1129; Air and Radiation Docket
and Information Center, EPA West Building, 1301 Constitution Ave., NW.,
Washington, DC 20460; and the National Archives and Records
Administration (NARA). If you wish to obtain materials from a docket in
the EPA Headquarters Library, please call the Office of Air and
Radiation (OAR) Docket/Telephone number (202) 566-1742. For information
on the availability of this material at NARA, call (202) 741-6030, or
go to: http://www.archives.gov/federal_register/code_of_federal_
regulations/ibr_locations.html.
(c) EPA approved regulations.
[[Page 18143]]
State of North Dakota Regulations
--------------------------------------------------------------------------------------------------------------------------------------------------------
State
State citation Title/subject effective EPA approval date and citation \1\ Explanations
date
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-01 General Provisions
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-01-01.......................... Purpose...................... 10/1/87 5/12/89, 54 FR 20574...................
33-15-01-02.......................... Scope........................ 10/1/87 5/12/89, 54 FR 20574...................
33-15-01-03.......................... Authority.................... 9/1/97 4/2/04, 69 FR 17302....................
33-15-01-04.......................... Definitions.................. 1/1/07 5/27/08, 73 FR 30308...................
33-15-01-05.......................... Abbreviations................ 1/1/07 5/27/08, 73 FR 30308...................
33-15-01-06.......................... Entry onto premises-- 10/1/87 5/12/89, 54 FR 20574...................
Authority.
33-15-01-07.......................... Variances: Subsection 1 and.. 10/1/87 5/12/89, 54 FR 20574...................
Subsection 2................. 6/1/90 6/26/92, 57 FR 28619...................
33-15-01-08.......................... Circumvention................ 6/1/90 6/26/92, 57 FR 28619...................
33-15-01-09.......................... Severability................. 10/1/87 5/12/89, 54 FR 20574...................
33-15-01-10.......................... Land use plans and zoning 10/1/87 5/12/89, 54 FR 20574...................
regulations.
33-15-01-11.......................... Reserved..................... 10/1/87 5/12/89, 54 FR 20574...................
33-15-01-12.......................... Measurements of emissions of 6/1/01 2/28/03, 68 FR 9565....................
air contaminants.
33-15-01-13.......................... Shutdown and malfunction of 10/1/87 5/12/89, 54 FR 20574................... Excluding subsection 2(b)
an installation-- which was subsequently
Requirements for revised and approved. See
notification. below.
33-15-01-13.2(b)..................... Malfunctions................. 9/1/97 8/27/98, 63 FR 45722...................
33-15-01-14.......................... Time schedule for compliance. 10/1/87 5/12/89, 54 FR 20574...................
33-15-01-15.......................... Prohibition of air pollution. 6/1/01 2/28/03, 68 FR 9565....................
33-15-01-16.......................... Confidentiality of records... 10/1/87 5/12/89, 54 FR 20574...................
33-15-01-17.......................... Enforcement.................. 3/1/03 10/21/04, 69 FR 61762..................
33-15-01-18.......................... Compliance certifications.... 3/1/03 10/21/04, 69 FR 61762..................
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-02 Ambient Air Quality Standards
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-02-01.......................... Scope........................ 10/1/87 5/12/89, 54 FR 20574...................
33-15-02-02.......................... Purpose...................... 10/1/87 5/12/89, 54 FR 20574...................
33-15-02-03.......................... Air quality guidelines....... 10/1/87 5/12/89, 54 FR 20574...................
33-15-02-04.......................... Ambient air quality standards 9/1/98 8/31/99, 64 FR 47395................... See additional interpretive
materials cited in 64 FR
47395, 8/31/99.
33-15-02-05.......................... Method of sampling and 12/1/94 10/8/96, 61 FR 52865...................
analysis.
33-15-02-06.......................... Reference conditions......... 10/1/87 5/12/89, 54 FR 20574...................
33-15-02-07.......................... Concentration of air 10/1/87 5/12/89, 54 FR 20574................... Excluding subsection 3 and 4
contaminants in the ambient which were subsequently
air restricted. revised and approved. See
below.
33-15-02, Table 1.................... Ambient Air Quality Standards 12/1/94 10/8/96, 61 FR 52865...................
33-15-02-07.3 33-15-02-07.4 and 33-15- Concentration of air 9/1/98 8/31/99, 64 FR 47395................... See additional interpretive
02, Table 2. contaminants in the ambient materials cited in 64 FR
air restricted and National 47395, 8/31/99.
Ambient Air Quality
Standards table.
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-03 Restrictions of Visible Air Contaminants
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-03-01.......................... Restrictions applicable to 10/1/87 5/12/89, 54 FR 20574...................
existing installations.
33-15-03-02.......................... Restrictions applicable to 10/1/87 5/12/89, 54 FR 20574...................
new installations and all
incinerators.
33-15-03-03.......................... Restrictions applicable to 10/1/87 5/12/89, 54 FR 20574...................
fugitive emissions.
33-15-03-03.1........................ Restrictions applicable to 10/1/87 5/12/89, 54 FR 20574...................
flares.
33-15-03-04.......................... Exceptions................... 2/1/82 11/12/82, 47 FR 51131..................
33-15-03-05.......................... Method of measurement........ 10/1/87 5/12/89, 54 FR 20574...................
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-04 Open Burning Restrictions
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-04-01.......................... Refuse burning restrictions.. 1/1/07 5/27/08, 73 FR 30308...................
33-15-04-02.......................... Permissible open burning..... 1/1/96 4/21/97, 62 FR 19224................... Excluding subsections 1.b,
1.e, 1.g, and 2.k which were
subsequently revised and
approved. See below.
33-15-04-02.1.b, 33-15-04-02.1.e, 33- Permissible open burning..... 1/1/07 5/27/08, 73 FR 30308...................
15-04-02.1.g, and 33-15-04-02.2.k..
--------------------------------------------------------------------------------------------------------------------------------------------------------
[[Page 18144]]
33-15-05 Emissions of Particulate Matter Restricted
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-05-01.......................... Restrictions of emissions of 10/1/87 5/12/89, 54 FR 20574...................
particulate matter from
industrial processes.
33-15-05-02.......................... Maximum allowable emission of 3/1/03 10/21/04, 69 FR 61762..................
particulate matter from fuel
burning equipment used for
indirect heating.
33-15-05-03.......................... Incinerators (repealed)...... 8/1/95 4/21/97, 62 FR 19224...................
33-15-05-03.1........................ Infectious waste incinerators 7/12/00 2/28/03, 68 FR 9565....................
(repealed).
33-15-05-03.2........................ Refuse incinerators.......... 8/1/95 4/21/97, 62 FR 19224...................
33-15-05-03.3........................ Other waste incinerators..... 3/1/03 10/21/04, 69 FR 61762..................
33-15-05-04.......................... Methods of measurement....... 3/1/03 10/21/04, 69 FR 61762..................
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-06 Emissions of Sulfur Compounds Restricted
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-06-01.......................... Restrictions of emissions of 3/1/03 10/21/04, 69 FR 61762.................. See additional interpretive
sulfur dioxide from use of materials cited in 63 FR
fuel. 45722, 8/27/98.
33-15-06-02.......................... Restriction of emissions of 6/1/92 10/20/93, 58 FR 54041..................
sulfur oxides from
industrial processes.
33-15-06-03.......................... Methods of measurement....... 3/1/03 10/21/04, 69 FR 61762..................
33-15-06-04.......................... Continuous emission 6/1/92 10/20/93, 58 FR 54041..................
monitoring requirements.
33-15-06-05.......................... Reporting and recordkeeping 6/1/92 10/20/93, 58 FR 54041..................
requirements.
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-07 Control of Organic Compounds Emissions
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-07-01.......................... Requirements for construction 6/1/92 8/21/95, 60 FR 43396................... Excluding subsection 1 which
of organic compounds was subsequently revised and
facilities. approved. See below.
33-15-07-01.1........................ Scope........................ 9/1/98 8/31/99, 64 FR 47395...................
33-15-07-02.......................... Requirements for organic 6/1/92 8/21/95, 60 FR 43396...................
compounds gas disposal.
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-08 Control of Air Pollution from Vehicles and Other Internal Combustion Engines
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-08-01.......................... Internal combustion engine 7/1/78 11/2/79, 44 FR 63102...................
emissions restricted.
33-15-08-02.......................... Removal or disabling of motor 7/1/78 11/2/79, 44 FR 63102...................
vehicle pollution control
devices prohibited.
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-10 Control of Pesticides
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-10-01.......................... Pesticide use restricted: 10/1/87 5/12/89, 54 FR 20574...................
Subsection 1 and Subsection
2.
............................. 1/1/89 8/9/90, 55 FR 32403....................
33-15-10-02.......................... Restrictions on the disposal 10/1/87 5/12/89, 54 FR 20574................... Excluding subsections 2, 3,
of surplus pesticides and 4, and 5 which were
empty pesticide containers. subsequently revised and
approved. See below.
33-15-10-02.2, 33-15-10-02.3, 33-15- Restrictions on the disposal 1/1/89 8/9/90, 55 FR 32403....................
10-02.4. of surplus pesticides and
empty pesticide containers.
33-15-10-02.5........................ Restrictions on the disposal 6/1/90 6/26/92, 57 FR 28619...................
of surplus pesticides and
empty pesticide containers.
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-11 Prevention of Air Pollution Emergency Episodes
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-11-01.......................... Air pollution emergency...... 10/1/87 5/12/89, 54 FR 20574...................
33-15-11-02.......................... Air pollution episode 10/1/87 5/12/89, 54 FR 20574...................
criteria.
33-15-11-03.......................... Abatement strategies emission 10/1/87 5/12/89, 54 FR 20574...................
reduction plans.
33-15-11-04.......................... Preplanned abatement 10/1/87 5/12/89, 54 FR 20574...................
strategies plans.
33-15-11--Table 6.................... Air pollution episode 8/1/95 4/21/97, 62 FR 19224...................
criteria.
33-15-11--Table 7.................... Abatement strategies emission 8/1/95 4/21/97, 62 FR 19224...................
reduction plans.
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-14 Designated Air Contaminant Sources, Permit To Construct, Minor Source Permit To Operate, Title V Permit To Operate
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-14-01.......................... Designated air contaminant 8/1/95 4/21/97, 62 FR 19224...................
sources.
33-15-14-01.1........................ Definitions.................. 1/1/96 4/21/97, 62 FR 19224...................
[[Page 18145]]
33-15-14-02.......................... Permit to construct.......... 3/1/94 8/21/95, 60 FR 43396................... Excluding subsections 12,
3.c, 13.b.1, 5, 13.c,
13.i(5), 13.o, and 19 (one
sentence) which were
subsequently revised and
approved. See below.
See additional interpretive
materials cited in 57 FR
28619, 6/26/92, regarding
the State's commitment to
meet the requirements of
EPA's ``Guideline on Air
Quality Models (Revised).''
33-15-14-02.12....................... [Reserved].................. 8/1/95 & 1/ 4/21/97, 62 FR 19224................... Moved this section related to
1/96 fees for Permit to Construct
to a new chapter, 33-15-23,
Fees.
33-15-14-02.3.c...................... Alterations to a source...... 9/1/98 8/31/99, 64 FR 47395................... See additional interpretive
materials cited in 64 FR
47395, 8/31/99.
33-15-14-02.13.b.1................... Exemptions................... 6/1/01 2/28/03, 68 FR 9565....................
33-15-14-02.5 and 33-15-14-02.13.i(5) Review of application-- 3/1/03 8/8/05, 70 FR 45539....................
Standard for granting
permits to construct and
Exemptions.
33-15-14-02.13.c and 33-15-14-02.13.o Exemptions................... 1/1/07 5/27/08, 73 FR 30308...................
33-15-14-02.19 (one sentence--see Amendment of permits......... 3/1/03 1/24/06, 71 FR 3764.................... Only one sentence was revised
explanation). and approved with this
action. That sentence reads:
``In the event that the
modification would be a
major modification as
defined in chapter 33-15-15,
the department shall follow
the procedures established
in chapter 33-15-15.'' The
remainder of subsection 19
was approved on 8/21/95 (60
FR 43396). See above.
33-15-14-03.......................... Minor source permit to 3/1/94 8/21/95, 60 FR 43396................... Excluding subsections 10,
operate. 1.c, 4, 5.a(1)(d), 11, and
16 (one sentence) which were
subsequently revised and
approved. See below. Also
see 40 CFR 52.1834.
33-15-14-03.10....................... [Reserved].................. 8/1/95 & 1/ 4/21/97, 62 FR 19224................... Moved this section related to
1/96 fees for Permit to Operate
to a new chapter, 33-15-23,
Fees.
33-15-14-03.1.c...................... Permit to operate required... 6/1/01 2/28/03, 68 FR 9565....................
33-15-14-03.4, 33-15-14-03.5.a(1)(d) Performance testing, Action 3/1/03 8/8/05, 70 FR 45539....................
& 33-15-14-03.11. on applications, and
Performance and emission
testing.
33-15-14-03.16 (One sentence--see Amendment of permits......... 3/1/03 1/24/06, 71 FR 3764.................... Only one sentence was revised
explanation). and approved with this
action. That sentence reads:
``In the event that the
modification would be a
major modification as
defined in chapter 33-15-15,
the department shall follow
the procedures established
in chapter 33-15-15.'' The
remainder of subsection 16
was approved on 8/21/95 (60
FR 43396). See above.
33-15-14-04.......................... Permit fees (repealed)....... 3/1/94 8/21/95, 60 FR 43396...................
33-15-14-05.......................... Common provisions applicable 3/1/94 8/21/95, 60 FR 43396...................
to both permit to construct
and permit to operate
(repealed).
33-15-14-07.......................... Source exclusions from title 6/1/01 2/28/03, 68 FR 9565....................
V permit to operate
requirements.
--------------------------------------------------------------------------------------------------------------------------------------------------------
[[Page 18146]]
33-15-15 Prevention of Significant Deterioration of Air Quality
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-15-01.......................... General provisions (repealed) 2/1/05 7/19/07, 72 FR 39564................... See additional interpretive
materials cited in 56 FR
12848, 3/28/91, regarding
NOx increments and in 57 FR
28619, 6/26/92, regarding
the State's commitment to
meet the requirements of
EPA's ``Guideline on Air
Quality Models (Revised).''
Also see 40 CFR 52.1829.
33-15-15-01.1........................ Purpose...................... 2/1/05 7/19/07, 72 FR 39564...................
33-15-15-01.2........................ Scope........................ 2/1/05 7/19/07, 72 FR 39564...................
33-15-15-02.......................... Reclassification............. 2/1/05 7/19/07, 72 FR 39564...................
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-17 Restriction of Fugitive Emissions
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-17-01.......................... General provisions-- 6/1/01 2/28/03, 68 FR 9565....................
Applicability and
designation of affected
facilities.
33-15-17-02.......................... Restriction of fugitive 1/1/07 5/27/08, 73 FR 30308...................
particulate emissions.
33-15-17-03.......................... Reasonable precautions for 6/20/78 11/2/79, 44 FR 63102...................
abating and preventing
fugitive particulate
emissions.
33-15-17-04.......................... Restriction of fugitive 6/20/78 11/2/79, 44 FR 63102...................
gaseous emissions.
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-18 Stack Heights
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-18-01.......................... General provisions........... 10/1/87 11/14/88, 53 FR 45763..................
33-15-18-02.......................... Good engineering practice 10/1/87 11/14/88, 53 FR 45763..................
demonstrations.
33-15-18-03.......................... Exemptions................... 10/1/87 11/14/88, 53 FR 45763..................
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-19 Visibility Protection
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-19-01.......................... General provisions........... 10/1/87 9/28/88, 53 FR 37757...................
33-15-19-02.......................... Review of new major 10/1/87 9/28/88, 53 FR 37757...................
stationary sources and major
modifications.
33-15-19-03.......................... Visibility monitoring........ 10/1/87 9/28/88, 53 FR 37757...................
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-20 Control of Emissions from Oil and Gas Well Production Facilities
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-20-01.......................... General provisions........... 6/1/92 8/21/95, 60 FR 43396...................
33-15-20-02.......................... Registration and reporting 6/1/92 8/21/95, 60 FR 43396...................
requirements.
33-15-20-03.......................... Prevention of significant 6/1/92 8/21/95, 60 FR 43396...................
deterioration applicability
and source information
requirements.
33-15-20-04.......................... Requirements for control of 6/1/90 6/26/92, 57 FR 28619...................
production facility
emissions.
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-23 Fees
--------------------------------------------------------------------------------------------------------------------------------------------------------
33-15-23-01.......................... Definitions.................. 8/1/95 4/21/97, 62 FR 19224...................
33-15-23-02.......................... Permit to construct fees..... 8/1/95 4/21/97, 62 FR 19224...................
33-15-23-03.......................... Minor source permit to 8/1/95 4/21/97, 62 FR 19224...................
operate fees.
--------------------------------------------------------------------------------------------------------------------------------------------------------
\1\ In order to determine the EPA effective date for a specific provision listed in this table, consult the Federal Register notice cited in this column
for the particular provision.
[[Page 18147]]
(d) EPA-approved source-specific requirements.
----------------------------------------------------------------------------------------------------------------
State
Name of source Nature of effective EPA approval date and citation Explanations
requirement date \2\
----------------------------------------------------------------------------------------------------------------
Leland Olds Station Units 1 & SIP Chapter 8, 5/6/77 10/17/77, 42 FR 55471.
2............................ Section 8.3,
Continuous
Milton R. Young Unit 1 Emission
Heskett Station Units 1 & 2 Monitoring
Stanton Station Unit 1 Requirements for
American Crystal Sugar at Existing
Drayton Stationary
Sources,
including
amendments to
Permits to
Operate and
Department Order
Tesoro Mandan Refinery........ SIP Chapter 8, 2/27/07 5/27/08, 73 FR 30308.
Section 8.3.1,
Continuous
Opacity
Monitoring for
Fluid Bed
Catalytic
Cracking Units:
Tesoro Refining
and Marketing
Co., Mandan
Refinery.
----------------------------------------------------------------------------------------------------------------
\2\ In order to determine the EPA effective date for a specific provision listed in this table, consult the
Federal Register notice cited in this column for the particular provision.
(e) EPA-approved nonregulatory provisions
----------------------------------------------------------------------------------------------------------------
Applicable geographic State submittal EPA approval
Name of nonregulatory SIP or non-attainment date/Adopted date and Explanations
provision area date citation \3\
----------------------------------------------------------------------------------------------------------------
(1) Implementation Plan for Statewide............ Submitted: 1/24/ 5/31/72, 37 FR Excluding subsequent
the Control of Air Pollution 72; Adopted: 1/ 10842; with all revisions, as
for the State of North Dakota. 24/72; clarifications follows: Chapters 6,
Clarification on 3/2/76, 41 11, and 12 and
submitted: 6/14/ FR 8956. Sections 2.11,
73, 2/19/74, 6/ 3.2.1, 3.7, 5.2.1,
26/74, 11/21/ 6.10, 6.11, 6.13,
74, 4/23/75. 8.3, and 8.3.1.
Revisions to these
non-regulatory
provisions have
subsequently been
approved. See below.
Chapters:
1. Introduction
2. Legal Authority
3. Control Strategy
4. Compliance Schedule
5. Prevention of Air
Pollution Emergency
Episodes
7. Review of New Sources
and Modifications
8. Source Surveillance
9. Resources
10. Inter-governmental
Cooperation
11. Rules and Regulations
With subsequent revisions to
the chapters as follows:
(2) Revisions to SIP ..................... Submitted: 5/26/ 10/17/77, 42 FR
Chapter 8, Section 8.3. 77. 55471.
(3) Revisions to SIP ..................... Submitted: 1/17/ 8/12/80, 45 FR
Chapter 2, Section 2.11. 80. 53475.
(4) SIP Chapter 6, Air ..................... Submitted: 1/17/ 8/12/80, 45 FR
Quality Surveillance. 80. 53475.
(5) Revisions to SIP ..................... Submitted: 1/26/ 9/28/88, 53 FR
Chapter 6, Section 6.10. 88. 37757.
(6) Revisions to SIP ..................... Submitted: 4/18/ 10/5/89, 54 FR
Chapter 3, Section 3.7. 89. 41094.
(7) Revisions to SIP ..................... Submitted: 4/18/ 8/9/90, 55 FR
Chapter 3, Section 3.2.1. 89. 32403.
(8) Revisions to SIP ..................... Submitted: 4/18/ 8/9/90, 55FR
Chapter 5, Section 5.2.1. 89. 32403.
(9) Revisions to SIP ..................... Submitted: 4/18/ 8/9/90, 55 FR
Chapter 6, Section 6.11. 89. 32403.
(10) Revisions to SIP ..................... Submitted: 1/9/ 4/21/97, 62 FR
Chapter 6, Section 6.13. 96. 19224.
(11) Revisions to Chapter ..................... ................ ................ See the table listed
11, Rules & Regulations. above under Sec.
52.1820(c)(1) for
most current version
of EPA-approved
North Dakota
regulations.
[[Page 18148]]
(12) SIP to meet Air Statewide............ Submitted: 1/17/ 8/12/80, 45 FR
Quality Monitoring 40 CFR 80. 53475.
part 58, subpart c,
paragraph 58.20 and
public notification
required under section
127 of the Clean Air Act.
(13) Stack Height Statewide............ Submitted: 4/18/ 6/7/89, 54 FR
Demonstration Analysis. 86 and 7/21/87. 24334.
(14) Visibility New Statewide............ Submitted: 1/26/ 9/28/88, 53 FR
Source Review and 88. 37757.
Visibility Monitoring.
(15) Commitment to revise Statewide............ Submitted: 5/11/ 11/14/88, 53 FR See also 40 CFR
stack height rules in 88. 45763. 52.1832.
response to NRDC v.
Thomas, 838 F.2d 1224 (DC
Cir. 1988).
(16) Visibility General Statewide............ Submitted: 4/18/ 10/5/89, 54 FR See also 40 CFR
Plan and Long-term 89. 41094. 52.1831.
Strategy.
(17) Group III PM10 SIP.. Statewide............ Submitted: 4/18/ 8/9/90, 55 FR See additional
89. 32403. interpretive
materials cited in
55 FR 32403, 8/9/90.
(18) Commitment to meet Statewide............ Submitted: 2/14/ 6/26/92, 57 FR See additional
all requirements of EPA's 92. 28619. interpretive
Guideline on Air Quality materials cited in
Models (revised) for air 57 FR 28619, 6/26/
quality modeling 92. Also see 40 CFR
demonstrations associated 52.1824.
with the permitting of
new PSD sources, PSD
major modifications, and
sources to be located in
nonattainment areas.
(19) Small Business Statewide............ Submitted: 11/2/ 1/11/94, 59 FR See additional
Assistance Program (SIP 92 and 1/18/93. 1485. interpretive
Chapter 12). materials cited in
59 FR 1485, 1/11/94.
(20) Revisions to SIP ..................... Submitted: 3/8/ 5/27/08, 73 FR
Chapter 8, Section 8.3.1. 07 30308.
----------------------------------------------------------------------------------------------------------------
\3\ In order to determine the EPA effective date for a specific provision listed in this table, consult the
Federal Register notice cited in this column for the particular provision.
[FR Doc. E9-9020 Filed 4-20-09; 8:45 am]
BILLING CODE 6560-50-P