[Federal Register Volume 75, Number 87 (Thursday, May 6, 2010)]
[Notices]
[Page 24943]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2010-10632]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP10-176-000]
Millennium Pipeline Company, LLC; Notice of Request Under Blanket
Authorization
April 28, 2010.
Take notice that on April 23, 2010, Millenium Pipeline Company, LLC
(Millennium), One Blue Hill Plaza, Seventh Floor, PO Box 1565, Pearl
River, New York 10965 filed in Docket No. CP10-176-000, a prior notice
request pursuant to sections 157.205 and 157.208 of the Commission's
regulations under the Natural Gas Act (NGA). Millennium seeks
authorization to increase the Commission-approved maximum allowable
operating pressure (MAOP) on its Hickory Grove Lateral Line from 1072
pounds per square inch gage (psig) to 1200 psig. The Hickory Grove
Lateral is located in Chemung County, New York and extends from
Millennium's mainline facilities at a tie-in at Chambers Road near
Horseheads, New York to an interconnection with the facilities of
Southern Tier Transmission Company (STT) near Hickory Grove Road, in
Horseheads, New York. Millennium proposes to perform these activities
under its blanket certificate issued in Docket No. CP98-155-000 [97
FERC ] 61,292, at 62,327 (2001)], all as more fully set forth in the
application which is on file with the Commission and open to public
inspection.
Specifically, the facility at issue is approximately 2.6 mile, 12-
inch lateral pipeline segment of Millenniums Line A-5 in Chemung
County, New York, extending from Millennium's 30-inch mainline to an
interconnect with STT at Hickory Grove in Horseheads, New York. The
Hickory Grove Lateral was constructed in 1993 by Columbia Gas
Transmission, LLC and the pipeline was originally designed, tested and
qualified for an MAOP of 1236 psig in a Class Three Location under
applicable Department of Transportation (DOT) regulations. The
facilities were transferred to Millennium by certificate issued to
Millennium in Docket No. CP98-150, et al; however, in Millenniums
application the MAOP of the pipeline is listed at 1072 psig. The
proposed increase to the Commission-approved MAOP of the Hickory Grove
Lateral is being made to correct the apparent inconsistency between the
Commission-approved MAOP and the MAOP at which Millennium intends to
operate the segment. Recently, Anschulz Exploration Corporation (AEC)
requested to connect certain gathering facilities to the Hickory Grove
Lateral to allow a new supply of gas to flow through the Hickory Grove
Lateral to Millennium's mainline system, which operates a 1200 psig.
The increase in Commission-approved MAOP is required to receive local
production gas, to be produced by AEC; and, increasing the Commission-
approved MAOP corrects an apparent mistake in Millenniums original
certificate application.
The filing may be viewed on the Web at http://www.ferc.gov using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, contact FERC at [email protected] or call toll-
free, (886) 208-3676 or TYY, (202) 502-8659.
Any questions regarding this application may be directed to Gary A.
Kruse, Vice President--General Counsel and Secretary, Millennium
Pipeline Company, LLC, One Blue Hill Plaza, Seventh Floor, PO Box 1565,
Pearl River, New York 10965, (845) 620-1300, or to Thomas E. Holmberg,
Baker Botts LLP, 1299 Pennsylvania Avenue, NW., Washington, DC 20004,
(202) 639-7700.
Any person or the Commission's Staff may, within 60 days after the
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and, pursuant to section 157.205 of
the Commission's Regulations under the NGA (18 CFR 157.205) a protest
to the request. If no protest is filed within the time allowed
therefore, the proposed activity shall be deemed to be authorized
effective the day after the time allowed for protest. If a protest is
filed and not withdrawn within 30 days after the time allowed for
filing a protest, the instant request shall be treated as an
application for authorization pursuant to section 7 of the NGA.
The Commission strongly encourages electronic filings of comments,
protests, and interventions via the internet in lieu of paper. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site (http://www.ferc.gov) under the ``e-Filing'' link. Persons unable
to file electronically should submit an original and 14 copies of the
protest or intervention to the Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC 20426.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-10632 Filed 5-5-10; 8:45 am]
BILLING CODE 6717-01-P