[Federal Register Volume 75, Number 98 (Friday, May 21, 2010)]
[Notices]
[Page 28612]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2010-12262]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-8990-5]


Environmental Impact Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-1399 or http://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements Filed 05/10/2010 
Through 05/14/2010 Pursuant to 40 CFR 1506.9.

Notice

    In accordance with Section 309(a) of the Clean Air Act, EPA is 
required to make its comments on EISs issued by other Federal agencies 
public. Historically, EPA has met this mandate by publishing weekly 
notices of availability of EPA comments, which includes a brief summary 
of EPA's comment letters, in the Federal Register. Since February 2008, 
EPA has been including its comment letters on EISs on its Web site at: 
http://www.epa.gov/compliance/nepa/eisdata.html. Including the entire 
EIS comment letters on the Web site satisfies the Section 309(a) 
requirement to make EPA's comments on EISs available to the public. 
Accordingly, on March 31, 2010, EPA discontinued the publication of the 
notice of availability of EPA comments in the Federal Register.

EIS No. 20100174, Final EIS, USFS, 00, Wallowa-Whitman National Forest 
Invasive Plants Treatment Project, To Protect Native Vegetation by 
Controlling, Containing, or Eradicating Invasive Plant, Wallowa, Baker, 
Malheur and Grant Counties, OR and Adams and Nez Perce Counties, ID, 
Wait Period Ends: 06/21/2010, Contact: Robert W. Rock 541-523-1242.
EIS No. 20100175, Draft EIS, USN, 00, United States Marine Corps Joint 
Strike Fighter F-35B West Coast Basing, To Efficiently and Effectively 
Maintain Combat Capability and Mission Readiness, CA and AZ, Comment 
Period Ends: 07/05/2010, Contact: Adrianne Saboya 619-532-4742.
EIS No. 20100176, Final EIS, USN, WA, Naval Sea Systems Command 
(NAVSEA). Naval Undersea Warfare Center (NUWC), Keyport Complex 
Extension, Propose to Extend the Operational Areas, Three Distinct 
Range Sites: Keyport Range Site; Dabob Bay Range Complex (DBRC) Site, 
Quinault Underwater Tracking Range Site, Gray Harbor, Jefferson, Kitsap 
and Mason Counties, WA, Wait Period Ends: 06/21/2010, Contact: Kimberly 
Kler 360-396-0927.
EIS No. 20100177, Draft EIS, USFS, MN, Tracks Project, Proposing Forest 
Vegetation Management and Related Transportation System Activities, 
Superior National Forest, St. Louis and Lake Counties, MN, Comment 
Period Ends: 07/05/2010, Contact: Susan Duffy 218-365-2097.
EIS No. 20100178, Draft EIS, USACE, LA, Medium Diversion at White 
Ditch, Integrated Feasibility Study, Louisiana Coastal Area (LCA) 
Ecosystem Restoration, Implementation, Plaquemines Parish, LA, Comment 
Period Ends: 07/05/2010, Contact: Dr. Nathan Dayan 504-862-2530.
EIS No. 20100179, Final EIS, TVA, AL, Bellefonte Site Single Nuclear 
Unit Project, Proposes to Complete or Construct and Operate a Single 
1,100-1, 200 MW Nuclear Generation Unit, Jackson County, AL, Wait 
Period Ends: 06/21/2010, Contact: Ruth Horton 865-632-3719.
EIS No. 20100180, Draft EIS, USACE, LA, Convey Atchafalaya River Water 
to Northern Terrebonne Marshes and Multipurpose Operation of Houma 
Navigation Lock, Integrated Feasibility Study, Louisiana Coastal Area 
(LCA) Implementation, Lafourche, Terrebonne, St. Mary Parish, LA, 
Comment Period Ends: 07/05/2010, Contact: Dr. Nathan Dayan 504-862-
2530.
EIS No. 20100181, Final EIS, DOE, MS, Kemper County Integrated 
Gasification Combined-Cycle (IGCC) Project, Construction and Operation 
of Advanced Power Generation Plant, U.S. Army COE Section 404 Permit, 
Kemper County, MS, Wait Period Ends: 06/21/2010, Contact: Richard A. 
Hargis, Jr. 888-322-7426 Ext. 6065.
EIS No. 20100182, Draft EIS, USACE, LA, Small Diversion at Convent/
Blind River, Proposes to construct a Freshwater Diversion Project, 
Integrated Feasibility Study, Louisiana Coastal Area, St. James Parish, 
LA, Comment Period Ends: 07/05/2010, Contact: Dr. William P. Klein, Jr. 
504-862-2540.
EIS No. 20100183, Draft EIS, USACE, LA, Amite River Diversion Canal 
Modification Element of the Section 7006(E)(3) Ecosystem Restoration 
Project, Feasibility Study, Louisiana Coastal Area (LCA) Ascension and 
Livingston Parishes, LA, Comment Period Ends: 07/05/2010, Contact: Dr. 
William P. Klein, Jr. 504-862-2540.

    Dated: May 18, 2010.
Ken Mittelholtz,
Deputy Director, NEPA Compliance Division, Office of Federal 
Activities.
[FR Doc. 2010-12262 Filed 5-20-10; 8:45 am]
BILLING CODE 6560-50-P