[Federal Register Volume 75, Number 99 (Monday, May 24, 2010)]
[Proposed Rules]
[Pages 28766-28769]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2010-12344]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2010-0200]
RIN 1625-AA09
Drawbridge Operation Regulations; Passaic River, Clifton, NJ
AGENCY: Coast Guard, DHS.
ACTION: Notice of proposed rulemaking.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard proposes to change the drawbridge operating
regulations governing the operation of the Route 3 Bridge, mile 11.8,
across the Passaic River at Clifton, New Jersey. Under this proposed
rule the Route 3 Bridge need not open for the passage of vessel
traffic.
DATES: Comments and related material must be received by the Coast
Guard on or before June 23, 2010.
ADDRESSES: You may submit comments identified by docket number USCG-
2010-0200 using any one of the following methods:
(1) Federal Rulemaking Portal: http://www.regulations.gov.
(2) Fax: 202-493-2251.
(3) Mail: Docket Management Facility (M-30), U.S. Department of
Transportation, West Building Ground Floor, Room W12-140, 1200 New
Jersey Avenue, SE., Washington, DC 20590-0001.
(4) Hand delivery: Same as mail address above, between 9 a.m. and 5
p.m., Monday through Friday, except Federal holidays. The telephone
number is 202-366-9329.
To avoid duplication, please use only one of these methods. See the
``Public Participation and Request for Comments'' portion of the
SUPPLEMENTARY INFORMATION section below for instructions on submitting
comments.
FOR FURTHER INFORMATION CONTACT: If you have questions on this proposed
rule, call or e-mail Mr. Joe Arca, Project Officer, First Coast Guard
District, telephone 212-668-7165, e-mail [email protected]. If you have
questions on viewing or submitting material to the docket, call Renee
V. Wright, Program Manager, Docket Operations, telephone 202-366-9826.
SUPPLEMENTARY INFORMATION:
Public Participation and Request for Comments
We encourage you to participate in this rulemaking by submitting
[[Page 28767]]
comments and related materials. All comments received will be posted,
without change to http://www.regulations.gov and will include any
personal information you have provided.
Submitting Comments
If you submit a comment, please include the docket number for this
rulemaking (USCG-2010-0200), indicate the specific section of this
document to which each comment applies, and provide a reason for each
suggestion or recommendation. You may submit your comments and material
online (http://www.regulations.gov), or by fax, mail or hand delivery,
but please use only one of these means. If you submit a comment online
via http://www.regulations.gov, it will be considered received by the
Coast Guard when you successfully transmit the comment. If you fax,
hand delivery, or mail your comment, it will be considered as having
been received by the Coast Guard when it is received at the Docket
Management Facility. We recommend that you include your name and a
mailing address, an e-mail address, or a phone number in the body of
your document so that we can contact you if we have questions regarding
your submission.
To submit your comment online, go to http://www.regulations.gov,
click on the ``submit a comment'' box, which will then become
highlighted in blue. In the ``Document Type'' drop down menu select
``Proposed Rules'' and insert ``USCG-2010-0200'' in the ``Keyword''
box. Click ``Search'' then click on the balloon shape in the
``Actions'' column. If you submit your comments by mail or hand
delivery, submit them in an unbound format, no larger than 8\1/2\ by 11
inches, suitable for copying and electronic filing. If you submit them
by mail and would like to know that they reached the Facility, please
enclose a stamped, self-addressed postcard or envelope. We will
consider all comments and material received during the comment period
and may change the rule based on your comments.
Viewing Comments and Documents
To view comments, as well as documents mentioned in this preamble
as being available in the docket, go to http://www.regulations.gov,
click on the ``read comments'' box, which will then become highlighted
in blue. In the ``Keyword'' box insert ``USCG-2010-0200'' and click
``Search.'' Click the ``Open Docket Folder'' in the ``Actions'' column.
You may also visit either the Docket Management Facility in Room W12-
140 on the ground floor of the Department of Transportation West
Building, 1200 New Jersey Avenue, SE., Washington, DC 20590, between 9
a.m. and 5 p.m., Monday through Friday, except Federal holidays. We
have an agreement with the Department of Transportation to use the
Docket Management Facility.
Privacy Act
Anyone can search the electronic form of comments received into any
of our dockets by the name of the individual submitting the comment (or
signing the comment, if submitted on behalf of an association,
business, labor union, etc.). You may review a Privacy Act notice
regarding our public dockets in the January 17, 2008, issue of the
Federal Register (73 FR 3316).
Public Meeting
We do not now plan to hold a public meeting. But you may submit a
request for one using one of the four methods specified under
ADDRESSES. Please explain why one would be beneficial. If we determine
that one would aid this rulemaking, we will hold one at a time and
place announced by a later notice in the Federal Register.
Background and Purpose
The Route 3 Bridge has a vertical clearance of 35 feet at mean high
water, and 40 feet at mean low water in the closed position. The
existing drawbridge operating regulations listed at 33 CFR 117.739(n),
require the bridge to open on signal after at least a 24 hour advance
notice is given by calling the number posted at the bridge.
The existing Route 3 Bridge will soon be replaced with a new fixed
highway bridge on a different alignment because it is in poor condition
and must be replaced as soon as possible. A submarine utility
communication cable is presently located on the proposed alignment of
the new replacement bridge and will need to be temporarily relocated
during the construction of the new Route 3 highway bridge.
The best alternative and least disruptive impact to the environment
is to temporarily relocate the communication cable to the underside of
the existing Route 3 Bridge. As a result of that temporary installation
of the communication cable the existing Route 3 Bridge will not be able
to be opened for vessel traffic.
The Route 3 Bridge has not received a request to open since 1998.
On September 10, 2009, the bridge owner, New Jersey Department of
Transportation (NJDOT), requested a change to the drawbridge operation
regulations to allow the existing Route 3 Bridge to not open for the
passage of vessel traffic in order to facilitate the temporary
installation of the communication cable and permit the new bridge
construction to commence.
Once the new bridge construction is completed and the new bridge is
opened for vehicular traffic the old existing Route 3 Bridge will be
removed.
Discussion of Proposed Rule
The existing regulation for the Route 3 Bridge requires it to open
on signal after at least a 24 hour advance notice is given by calling
the number posted at the bridge.
The Route 3 Bridge has not received a request to open since 1998,
and no requests to open are anticipated.
The bridge is scheduled to be demolished due to the construction of
a new replacement bridge. A communications cable must be attached
temporarily in order to facilitate the new bridge construction. It was
decided that since the Route 3 Bridge has not opened since 1998, that
relocating the communications cable on to the old bridge should not
impact navigation.
Regulatory Analyses
We developed this proposed rule after considering numerous statutes
and executive orders related to rulemaking. Below we summarize our
analyses based on 13 of these statutes or executive orders.
Regulatory Planning and Review
This proposed rule is not a ``significant regulatory action'' under
section 3(f) of Executive Order 12866, Regulatory Planning and Review,
and does not require an assessment of potential costs and benefits
under section 6(a)(3) of that Order. The Office of Management and
Budget has not reviewed it under that Order. This conclusion is based
upon the fact that the Route 3 Bridge has not opened since 1998, and no
requests to open are anticipated before its removal.
Small Entities
Under the Regulatory Flexibility Act (5 U.S.C. 601-612), we have
considered whether this proposed rule would have a significant economic
impact on a substantial number of small entities. The term ``small
entities'' comprises small businesses, not-for-profit organizations
that are independently owned and operated and are not dominant in their
fields, and governmental jurisdictions with populations of less than
50,000.
The Coast Guard certifies under 5 U.S.C. 605(b) that this proposed
rule
[[Page 28768]]
would not have a significant economic impact on a substantial number of
small entities. This action will not have a significant economic impact
on a substantial number of small entities for the following reasons.
This conclusion is based upon the fact that the Route 3 Bridge has not
opened since 1998, and no requests to open are anticipated before its
removal.
If you think that your business, organization, or governmental
jurisdiction qualifies as a small entity and that this rule would have
a significant economic impact on it, please submit a comment (see
ADDRESSES) explaining why you think it qualifies and how and to what
degree this rule would economically affect it.
Assistance for Small Entities
Under section 213(a) of the Small Business Regulatory Enforcement
Fairness Act of 1996 (Pub. L. 104-121), we want to assist small
entities in understanding this proposed rule so that they can better
evaluate its effects on them and participate in the rulemaking. If the
rule would affect your small business, organization, or governmental
jurisdiction and you have questions concerning its provisions or
options for compliance, please contact Commander (dpb), First Coast
Guard District, Bridge Branch, One South Street, New York, NY, 10004.
The telephone number is (212) 668-7165. The Coast Guard will not
retaliate against small entities that question or complain about this
proposed rule or any policy or action of the Coast Guard.
Collection of Information
This proposed rule would call for no new collection of information
under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501-3520).
Federalism
A rule has implications for federalism under Executive Order 13132,
Federalism, if it has a substantial direct effect on State or local
governments and would either preempt State law or impose a substantial
direct cost of compliance on them. We have analyzed this proposed rule
under that Order and have determined that it does not have implications
for federalism.
Unfunded Mandates Reform Act
The Unfunded Mandates Reform Act of 1995 (2 U.S.C. 1531-1538)
requires Federal agencies to assess the effects of their discretionary
regulatory actions. In particular, the Act addresses actions that may
result in the expenditure by a State, local, or Tribal government, in
the aggregate, or by the private sector of $100,000,000 (adjusted for
inflation) or more in any one year. Though this proposed rule will not
result in such an expenditure, we do discuss the effects of this rule
elsewhere in this preamble.
Taking of Private Property
This proposed rule would not cause a taking of private property or
otherwise have taking implications under Executive Order 12630,
Governmental Actions and Interference with Constitutionally Protected
Property Rights.
Civil Justice Reform
This proposed rule meets applicable standards in sections 3(a) and
3(b)(2) of Executive Order 12988, Civil Justice Reform, to minimize
litigation, eliminate ambiguity, and reduce burden.
Protection of Children
We have analyzed this proposed rule under Executive Order 13045,
Protection of Children from Environmental Health Risks and Safety
Risks. This rule is not an economically significant rule and would not
create an environmental risk to health or risk to safety that might
disproportionately affect children.
Indian Tribal Governments
This proposed rule does not have Tribal implications under
Executive Order 13175, Consultation and Coordination with Indian Tribal
Governments, because it would not have a substantial direct effect on
one or more Indian Tribes, on the relationship between the Federal
Government and Indian Tribes, or on the distribution of power and
responsibilities between the Federal Government and Indian Tribes.
Energy Effects
We have analyzed this proposed rule under Executive Order 13211,
Actions Concerning Regulations That Significantly Affect Energy Supply,
Distribution, or Use. We have determined that it is not a ``significant
energy action'' under that order because it is not a ``significant
regulatory action'' under Executive Order 12866 and is not likely to
have a significant adverse effect on the supply, distribution, or use
of energy. The Administrator of the Office of Information and
Regulatory Affairs has not designated it as a significant energy
action. Therefore, it does not require a Statement of Energy Effects
under Executive Order 13211.
Technical Standards
The National Technology Transfer and Advancement Act (NTTAA) (15
U.S.C. 272 note) directs agencies to use voluntary consensus standards
in their regulatory activities unless the agency provides Congress,
through the Office of Management and Budget, with an explanation of why
using these standards would be inconsistent with applicable law or
otherwise impractical. Voluntary consensus standards are technical
standards (e.g., specifications of materials, performance, design, or
operation; test methods; sampling procedures; and related management
systems practices) that are developed or adopted by voluntary consensus
standards bodies.
This proposed rule does not use technical standards. Therefore, we
did not consider the use of voluntary consensus standards.
Environment
We have analyzed this proposed rule under Department of Homeland
Security Management Directive 023-01, and Commandant Instruction
M16475.lD which guides the Coast Guard in complying with the National
Environmental Policy Act of 1969 (NEPA) (42 U.S.C. 4321-4370f), and
have made a preliminary determination that this action is one of a
category of actions which do not individually or cumulatively have a
significant effect on the human environment because it simply
promulgates the operating regulations or procedures for drawbridges. We
seek any comments or information that may lead to the discovery of a
significant environmental impact from this proposed rule.
List of Subjects in 33 CFR Part 117
Bridges.
For the reasons discussed in the preamble, the Coast Guard proposes
to amend 33 CFR part 117 as follows:
PART 117--DRAWBRIDGE OPERATION REGULATIONS
1. The authority citation for part 117 continues to read as
follows:
Authority: 33 U.S.C. 499; 33 CFR 1.05-1(g); Department of
Homeland Security Delegation No. 0170.1.
2. Section 117.739 is amended by revising paragraph (n) to read as
follows:
Sec. 117.739 Passaic River.
* * * * *
(n) The draw of the Route 3 Bridge, mile 11.8, need not be opened
for the passage of vessel traffic.
* * * * *
[[Page 28769]]
Dated: May 3, 2010.
Joseph L. Nimmich,
Rear Admiral, U.S. Coast Guard, Commander, First Coast Guard District.
[FR Doc. 2010-12344 Filed 5-21-10; 8:45 am]
BILLING CODE 9110-04-P