[Federal Register Volume 75, Number 103 (Friday, May 28, 2010)]
[Notices]
[Pages 30012-30013]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2010-12852]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 11068-014]


Friant Power Authority Orange Cove Irrigation District; Notice of 
Application Accepted for Filing, Soliciting Motions To Intervene and 
Protests, Ready for Environmental Analysis, and Soliciting Comments, 
Recommendations, Terms and Conditions, and Fishway Prescriptions

May 20, 2010.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Application Type: Amendment of license to increase the installed 
capacity.
    b. Project No.: 11068-014.
    c. Date Filed: February 22, 2010, and supplemented on May 13, 2010.
    d. Applicant: Friant Power Authority and Orange Cove Irrigation 
District.
    e. Name of Project: Fishwater Release Hydroelectric Project.
    f. Location: The project is located at the Bureau of Reclamation's 
Friant Dam on the San Joaquin River in Fresno County, California.
    g. Filed Pursuant to: Federal Power Act, 16 USC 791a-825r.
    h. Applicant Contact: Bill Carlisle, General Manager, Friant Power 
Authority, c/o South San Joaquin Municipal Utility District, P.O. Box 
279, Delano, CA 93216; telephone (661) 725-0610.
    Fergus Morrissey, Orange Cove Irrigation District, 1130 Park 
Boulevard, Orange Cove, CA 93646; telephone (559) 626-4461.
    i. FERC Contact: Linda Stewart, telephone: (202) 502-6680, and e-
mail address: [email protected].
    j. Deadline for filing motions to intervene and protests, comments, 
recommendations, terms and conditions, and fishway prescriptions is 60 
days from the issuance of this notice; reply comments are due 105 days 
from the issuance date of this notice. All documents (original and 
eight copies) should be filed with: Secretary, Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. 
Please include the project number (P-11068-014) on any comments or 
motions filed.
    k. Description of Request: Friant Power Authority and Orange Cove 
Irrigation District (licensees) propose to construct a different 
powerhouse from the one authorized in the October 13, 2006 Order 
Amending License. Instead of constructing a new powerhouse containing a 
single turbine generating unit with an installed capacity of 1.8 
megawatts (MW) and hydraulic capacity of 130 cubic feet per second 
(cfs), the licensees propose to construct a new powerhouse containing a 
single turbine generating unit with an installed capacity of 7.0 MW and 
hydraulic capacity of 370 cfs. The proposed new powerhouse would be 
constructed at a location different from the location authorized in the 
license.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street, NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. This filing may also be viewed 
on the Commission's Web site at http://ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. You may also register 
online at http://www.ferc.gov/docs-filing/esubscription.asp to be 
notified via e-mail of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or e-mail 
[email protected], for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.

[[Page 30013]]

    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the title ``PROTEST'', ``MOTION TO 
INTERVENE'', ``COMMENTS,'' ``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' 
``TERMS AND CONDITIONS,'' or ``FISHWAY PRESCRIPTIONS''; (2) set forth 
in the heading the name of the applicant and the project number of the 
application to which the filing responds; (3) furnish the name, 
address, and telephone number of the person protesting or intervening; 
and (4) otherwise comply with the requirements of 18 CFR 385.2001 
through 385.2005. All comments, recommendations, terms and conditions 
or prescriptions must set forth their evidentiary basis and otherwise 
comply with the requirements of 18 CFR 4.34(b). All comments, 
recommendations, terms and conditions or prescriptions should relate to 
project works which are the subject of the license amendment. Agencies 
may obtain copies of the application directly from the applicant. A 
copy of any protest or motion to intervene must be served upon each 
representative of the applicant specified in the particular 
application. If an intervener files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency. A copy of all other 
filings in reference to this application must be accompanied by proof 
of service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 
385.2010.
    p. As provided for in 18 CFR 4.34(b)(5)(i), a license applicant 
must file, no later than 60 days following the date of issuance of this 
notice of acceptance and ready for environmental analysis: (1) A copy 
of the water quality certification; (2) a copy of the request for 
certification, including proof of the date on which the certifying 
agency received the request; or (3) evidence of waiver of water quality 
certification.
    q. e-Filing: Motions to intervene, protests, comments, 
recommendations, terms and conditions, and fishway prescriptions may be 
filed electronically via the Internet in lieu of paper. See, 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
at http://www.ferc.gov under the ``e-Filing'' link.

Kimberly D. Bose,
Secretary.
[FR Doc. 2010-12852 Filed 5-27-10; 8:45 am]
BILLING CODE 6717-01-P