[Federal Register Volume 75, Number 109 (Tuesday, June 8, 2010)]
[Notices]
[Page 32460]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2010-13557]



-----------------------------------------------------------------------



DEPARTMENT OF ENERGY



Federal Energy Regulatory Commission



[Docket No. CP10-438-000]




Natural Gas Pipeline Company of America LLC; Notice of Request 

Under Blanket Authorization



May 28, 2010.

    Take notice that on May 20, 2010, Natural Gas Pipeline Company of 

America LLC (Natural), 3250 Lacey Road, Suite 700, Downers Grove, 

Illinois 60515, filed in Docket No. CP10-438-000, an application 

pursuant to sections 157.205, 157.208, 157.211 and 157.212 of the 

Commission's Regulations under the Natural Gas Act (NGA) as amended, to 

construct and operate facilities necessary to deliver natural gas to 

its affiliate, Kinder Morgan Louisiana Pipeline LLC (KMLP) in Johnsons 

Bayou, Cameron Parish, Louisiana, under Natural's blanket certificate 

issued in Docket No. CP82-402-000,\1\ all as more fully set forth in 

the application which is on file with the Commission and open to the 

public for inspection.

---------------------------------------------------------------------------



    \1\ 20 FERC ] 62,415 (1982).

---------------------------------------------------------------------------



    Natural proposes to construct and operate a delivery interconnect 

off its UTOS Lateral with the Southwest Louisiana lateral (Southwest 

Loop). To accomplish this, Natural would construct and operate 

approximately 320 feet of 12-inch diameter pipeline; a dual 8-inch 

meter on a new metering platform; and such other appurtenant facilities 

required to effect the interconnects to deliver up to 200,000 Dth/day 

of natural gas from its UTOS Lateral to KMLP. Natural would also 

construct certain section 2.55(a) non-jurisdictional facilities such as 

instrumentation and cathodic protection for all piping and equipment. 

Natural also states that KMLP would reimburse Natural for the estimated 

$2,500,000 construction cost of the proposed facilities.

    Any questions concerning this application may be directed to Bruce 

H. Newsome, Vice President, Regulatory Products and Services, Natural 

Gas Pipeline Company of America LLC, 3250 Lacey Road, 7th Floor, 

Downers Grove, Illinois 60515-7918, or via telephone at (630) 725-3070, 

or by e-mail [email protected].

    This filing is available for review at the Commission or may be 

viewed on the Commission's Web site at http://www.ferc.gov, using the 

``eLibrary'' link. Enter the docket number excluding the last three 

digits in the docket number filed to access the document. For 

assistance, please contact FERC Online Support at FERC 

[email protected] or call toll-free at (866) 206-3676, or, for 

TTY, contact (202) 502-8659. Comments, protests and interventions may 

be filed electronically via the Internet in lieu of paper. See, 18 CFR 

385.2001(a)(1)(iii) and the instructions on the Commission's Web site 

under the ``e-Filing'' link. The Commission strongly encourages 

intervenors to file electronically.

    Any person or the Commission's staff may, within 60 days after 

issuance of the instant notice by the Commission, file pursuant to Rule 

214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 

intervene or notice of intervention and pursuant to section 157.205 of 

the regulations under the NGA (18 CFR 157.205), a protest to the 

request. If no protest is filed within the time allowed therefore, the 

proposed activity shall be deemed to be authorized effective the day 

after the time allowed for filing a protest. If a protest is filed and 

not withdrawn within 30 days after the allowed time for filing a 

protest, the instant request shall be treated as an application for 

authorization pursuant to section 7 of the NGA.



Kimberly D. Bose,

Secretary.

[FR Doc. 2010-13557 Filed 6-7-10; 8:45 am]

BILLING CODE 6717-01-P