DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Termination of License by Implied Surrender and
Soliciting Comments, Protests, and Motions To Intervene
July 9, 2010.
Take notice that the following hydroelectric proceeding has been
initiated by the Commission:
a. Type of Proceeding: Termination of license by implied surrender.
b. Project No.: 3037-014.
c. Date Initiated: July 01, 2010.
d. Licensee/owner/former owners: Roosevelt Hydroelectric Company;
Rhode Island Department of Environmental Management; BTSFEO, LLC
(BTSFEO); and Tai-O Associates L.P. (Tai-O).
e. Name and Location of Project: The constructed 700-kilowatt (kW)
Elizabeth Webbing Mills Project is located on the Blackstone River in
Providence County, Rhode Island.
f. Proceeding Initiated Pursuant to: Standard Article 16 of the
project's license and 18 CFR 6.4 (2010).
g. FERC Contact: Diane Murray, (202) 502-8838.
h. Deadline for filing comments, protests, and motions to
intervene: August 9, 2010.
Comments, Motions to Intervene, and Protests may be filed
electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the
instructions on the Commission's Web site under the ``eFiling'' link.
Please include the project number (P-3037-014) on any documents or
motions filed. If unable to be filed electronically, documents may be
paper-filed. To paper-file, an original
[[Page 41859]]
and eight copies should be mailed to: Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings, please go to
the Commission's Web site located at http://www.ferc.gov/filing-comments.asp.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person in the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
i. Description of Existing Facilities: (1) A granite masonry dam,
156 feet long and 10 feet high with provisions for installing 12-inch
flashboards; (2) a reservoir of negligible storage capacity; (3) a
headrace, 14 to 40 feet wide and 39 feet long; (4) a powerhouse, 40
feet wide and 39 feet long, containing a turbine with a rated capacity
of 745 kW, connected to a generator with a rated capacity of 700 kW;
(5) a 400-foot-long, 5-kV transmission line, a 1,000-kVA transformer,
and a 70-foot-long, 15-kV transmission line; (6) a tailrace; and (7)
other appurtenances.
j. Description of Proceeding:
18 CFR 6.4 of the Commission's regulations provides, among other
things, that it is deemed to be intent of a licensee to surrender a
license, if the licensee abandons a project for a period of three
years. In addition, standard Article 16 of the license for Project No.
3037, provides, in pertinent part:
If the Licensee shall cause or suffer essential project property
to be removed or destroyed or to become unfit for use, without
adequate replacement, or shall abandon or discontinue good faith
operation of the project or refuse or neglect to comply with the
terms of the license and the lawful orders of the Commission * * *,
the Commission will deem it to be the intent of the Licensee to
surrender the license * * *
A minor license for the project was issued in 1981 to Roosevelt
Hydro Electric Company (Roosevelt Hydro). 16 FERC ] 62,040 (1981). The
project has not operated since 2001 when Roosevelt Hydro filed for
bankruptcy and is currently in disrepair. BTSFEO purchased the project
in 2004 through the bankruptcy proceeding, and in December 2006 it sold
the project to Tai-O. In September 2009, Tai-O entered into a contract
with Rhode Island DEM to sell the project to Rhode Island DEM. The sale
has been completed.
By order issued July 09, 2010, the Commission dismissed an
application for approval to transfer the license to Tai-O (because Tai-
O sold the project and does not intend to act as a licensee) and
initiated a proceeding to terminate the license for Project No. 3037 by
implied surrender.
k. Location of the Order: A copy of the order is available for
inspection and reproduction at the Commission in the Public Reference
Room or may be viewed on the Commission's website at http://www.ferc.gov using the ``eLibrary'' link. Enter the docket number
excluding the last three digits in the docket number field to access
the document. For assistance, call toll-free 1-866-208-3676 or e-mail
[email protected]. For TTY, call (202) 502-8659.
l. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
m. Filing and Service of Responsive Documents--Any filings must
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or
``MOTION TO INTERVENE'', and ``RECOMMENDATIONS FOR TERMS AND
CONDITIONS'', as applicable, and the Project Number of the proceeding.
n. Agency Comments--Federal, states, and local agencies are invited
to file comments on the described proceeding. If an agency does not
file comments within the time specified for filing comments, it will be
presumed to have no comments.
Kimberly D. Bose,
Secretary.