[Federal Register Volume 75, Number 141 (Friday, July 23, 2010)]
[Notices]
[Pages 43160-43161]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2010-18100]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-8991-6]


Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-1399 or http://www.epa.gov/compliance/nepa/.


[[Page 43161]]


Weekly receipt of Environmental Impact Statements.
Filed 07/12/2010 through 07/16/2010.
Pursuant to 40 CFR 1506.9.

Notice

    In accordance with Section 309(a) of the Clean Air Act, EPA is 
required to make its comments on EISs issued by other Federal agencies 
public. Historically, EPA has met this mandate by publishing weekly 
notices of availability of EPA comments, which includes a brief summary 
of EPA's comment letters, in the Federal Register. Since February 2008, 
EPA has been including its comment letters on EISs on its Web site at: 
http://www.epa.gov/compliance/nepa/eisdata.html. Including the entire 
EIS comment letters on the Web site satisfies the Section 309(a) 
requirement to make EPA's comments on EISs available to the public. 
Accordingly, on March 31, 2010, EPA discontinued the publication of the 
notice of availability of EPA comments in the Federal Register.

EIS No. 20100262, Final Supplement, USACE, MS, Pascagoula Harbor 
Navigation Channel Project, To Construct Congressionally Authorized 
Widening and Deepening Improvements, to Update the FEIS-1985, Jackson 
County, MS, Wait Period Ends: 08/23/2010, Contact: Vechere' Lampley 
404-562-5227.
EIS No. 20100263, Final EIS, FHWA, VT, Circ-Williston Transportation 
Project, Improvements between I-89 and the Towns Williston and Essex 
and the Village of Essex Junction, City of Burlington, Chittenden 
County, VT, Wait Period Ends: 08/27/2010, Contact: Kenneth R. Sikora, 
Jr. 802-828-4573.
EIS No. 20100264, Draft EIS, WAPA, AZ, Grapevine Canyon Wind Project, 
Proposal to Develop a Wind Energy Generating Facility up to 500 
Megawatts; (2) a 345 kilovolt (kV) Electrical Transmission Tie-Line; 
and (3) a 345-kV electrical Interconnection Switchyard, Coconino 
County, AZ, Comment Period Ends: 09/07/2010, Contact: Matthew Blevins 
800-336-7288.
EIS No. 20100265, Draft EIS, NOAA, VI, Amendment 2 to the Fishery 
Management Plan of Puerto Rico and the U.S. Virgin Islands and 
Amendment 5 to the Reef Fish Fishery Management Plan of Puerto Rico, 
Implementation of Annual Catch Limits (ACLs) and Accountability 
Measures (AMs) for Reef Fish and Queen Conch in the U.S. Caribbean, 
Comment Period Ends: 09/07/2010, Contact: Dr. Roy E. Crabtree 727-824-
5301.
EIS No. 20100266, Draft EIS, USFS, AK, Resurrection Creek Phase II 
Stream and Riparian Restoration Project and Hope Mining Company, 
Proposed Mining Plan of Operations, Seward Ranger District, Chugach 
National Forest, Kenai Peninsula Borough, Alaska, Comment Period Ends: 
09/07/2010, Contact: Bill MacFarlane 907-743-9434.
EIS No. 20100267, Final EIS, FTA, UT, Draper Transit Corridor Project, 
To Improve Transportation Mobility and Connectivity for Residents and 
Commuters in the Project Study Area, Salt Lake County, UT, Wait Period 
Ends: 08/23/2010, Contact: Kritin Kenyon 720-963-3300.
EIS No. 20100268, Draft EIS, NRC, ID, Eagle Rock Enrichment Facility, 
Construct, Operate, and Decommission, Proposed Facility would Enrich 
Uranium for Use in Commercial Nuclear Fuel for Power Reactors, 
Bonneville County, ID, Comment Period Ends: 09/13/2010, Contact: 
Stephen Lemont 301-415-5163.
EIS No. 20100269, Final EIS, USAF, ND, Grand Forks Air Force Base 
Project, Beddown and Flight Operations of Remotely Piloted Aircraft, 
Base Realignment and Closure, (BRAC), ND, Wait Period Ends: 08/23/2010, 
Contact: Doug Allbright 618-229-0841.
EIS No. 20100270, Draft EIS, USACE, MO, Missouri River Commercial 
Dredging, Proposal to Extract Sand and Gravel from the Missouri River, 
U.S. Corp of Engineer's Section 10 and 404 Permits, Kansas City, 
Central Missouri and Greater St. Louis, Missouri, Comment Period Ends: 
09/07/2010, Contact: Cody Wheeler 816-389-3739.

Amended Notices

EIS No. 20100230, Final EIS, FTA, HI, Honolulu High-Capacity Transit 
Corridor Project, Provide High-Capacity Transit Service on O'ahu from 
University of Hawaii-West O'ahu to the Ala Moana Center, City and 
County of Honolulu, O'ahu, Hawaii, Wait Period Ends: 08/16/2010, 
Contact: Ted Matley 415-744-3133. Revision to FR Notice Published 6/25/
2010: Correction to Title and Extending the Wait Period from 07/26/2010 
to 08/16/2010.
EIS No. 20100255, Draft EIS, NPS, WA, Ross Lake National Recreation 
Area Project, General Management Plan, Implementation, Skagit and 
Whatcom Counties, WA, Comment Period Ends: 09/30/2010, Contact:Roy Zipp 
360-873-4590 Ext 31. Revision to FR Notice Published 7/06/2010: 
Correction to Comment Period from 9/10/2010 to 9/30/2010.

    Dated: July 20, 2010.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 2010-18100 Filed 7-22-10; 8:45 am]
BILLING CODE 6560-50-P