Drawbridge Operation Regulation; Company Canal, Bourg, LA

AGENCY: Coast Guard, DHS.

ACTION: Notice of temporary deviation from regulations.

-----------------------------------------------------------------------

SUMMARY: The Commander, Eighth Coast Guard District, has issued a 
temporary deviation from the regulation governing the operation of the 
LA 24 vertical lift span bridge across Company Canal, mile 8.1, at 
Bourg, Terrebonne Parish, Louisiana. The deviation is necessary to 
perform electrical rehabilitation work on the bridge. This deviation 
allows the bridge to remain closed to navigation for twelve consecutive 
days.

DATES: This deviation is effective from 6 a.m. on Monday, October 25 
through 10 p.m. on Friday, November 5, 2010.

ADDRESSES: Documents mentioned in this preamble as being available in 
the docket are part of docket USCG-2010-0687 and are available online 
by going to http://www.regulations.gov, inserting USCG-2010-0687 in the 
``Keyword'' box and then clicking ``Search.'' They are also available 
for inspection or copying at the Docket Management Facility (M-30), 
U.S. Department of Transportation, West Building Ground Floor, Room 
W12-140, 1200 New Jersey Avenue, SE., Washington, DC 20590, between 9 
a.m. and 5 p.m., Monday through Friday, except Federal holidays.

FOR FURTHER INFORMATION CONTACT: If you have questions on this rule, 
call or e-mail Kay Wade, Bridge Administration Branch, Coast Guard; 
telephone 504-671-2128, e-mail [email protected]. If you have 
questions on viewing the docket, call Renee V. Wright, Program Manager, 
Docket Operations, telephone 202-366-9826.

SUPPLEMENTARY INFORMATION: The Louisiana Department of Transportation 
and Development has requested a temporary deviation from the operating 
schedule of the vertical lift span bridge across Company Canal at mile 
8.1 in Bourg, Terrebonne Parish, Louisiana. The vertical clearance of 
the bridge in the closed-to-navigation position is 5.17 feet above Mean 
High Water Elevation 3.0 feet Mean Sea Level.
    In accordance with 33 CFR 117.438(b), the vertical lift span of the 
bridge currently opens on signal except that, from 10 p.m. to 6 a.m. 
the draw opens on signal if at least 4 hours notice is given. This 
deviation allows the vertical lift span of the bridge to remain closed 
to navigation for twelve consecutive days from 6 a.m. Monday, October 
25 through 10 p.m. Friday, November 5, 2010.
    The closure is necessary in order to replace electrical conductors 
and conduit throughout the bridge structure, including the removal and 
replacement of all navigation lights on the span and fender system. 
This maintenance is essential for the continued operation of the 
bridge. Temporary navigational lighting will be provided during the 
closure and power outage period. Notices will be published in the 
Eighth Coast Guard District Local Notice to Mariners and will be 
broadcast via the Coast Guard Broadcast Notice to Mariners System.
    Navigation on the waterway consists of commercial and recreational 
fishing vessels, small to medium crew boats, and small tugs with and 
without tows. There are no commercial docks or marine type facilities 
within one mile of the bridge along Company Canal or Bayou Terrebonne. 
The bridge opens for the passage of navigation an average of 53 times 
per month. There are two alternate waterway routes available via the 
Gulf Intracoastal Waterway east to Bayou Lafourche and west to 
Navigation Canal. Small vessels may pass under the bridge while in the 
closed-to-navigation position provided caution is exercised. In an 
emergency, the bridge can be returned to operation with a 36 hour 
notice.
    Due to prior experience and coordination with waterway users, it 
has been determined that this closure will not have a significant 
effect on vessels that use the waterway.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the designated 
time period. This deviation from the operating regulations is 
authorized under 33 CFR 117.35.

    Dated: July 23, 2010.
David M. Frank,
Bridge Administrator.
[FR Doc. 2010-18961 Filed 8-2-10; 8:45 am]