[Federal Register Volume 75, Number 152 (Monday, August 9, 2010)]
[Notices]
[Pages 47839-47855]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2010-19474]


=======================================================================
-----------------------------------------------------------------------

MILLENNIUM CHALLENGE CORPORATION

[MCC 10-08]


Notice of Quarterly Report (January 1, 2010-March 31, 2010)

AGENCY: Millennium Challenge Corporation.

SUMMARY: The Millennium Challenge Corporation (MCC) is reporting for 
the quarter January 1, 2010 through March 31, 2010, on assistance 
provided under section 605 of the Millennium Challenge Act of 2003 (22 
U.S.C. 7701 et seq.), as amended (the Act), and on transfers or 
allocations of funds to other federal agencies under section 619(b) of 
the Act. The following report will be made available to the public by 
publication in the Federal Register and on the Internet Web site of the 
MCC (http://www.mcc.gov) in accordance with section 612(b) of the Act.

    Dated: July 6, 2010.
T. Charles Cooper,
Vice President, Congressional and Public Affairs, Millennium Challenge 
Corporation.

                                      Assistance provided Under Section 605
----------------------------------------------------------------------------------------------------------------
                                                                           Cumulative
            Projects                 Obligated          Objectives       disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                     Country: Madagascar Year: 2010 Quarter 2 Total Obligation: $87,998,166
       Entity to which the assistance is provided: MCA Madagascar Total Quarterly Disbursement: -$371,448
----------------------------------------------------------------------------------------------------------------
Land Tenure Project.............      $30,123,098  Increase Land            $29,303,833  Area secured with land
                                                    Titling and                           certificates or titles
                                                    Security.                             in the Zones.
                                                                                         Proportion of the
                                                                                          population informed
                                                                                          about land tenure
                                                                                          reforms in the Zones.
                                                                                         Legal and regulatory
                                                                                          reforms adopted.
                                                                                         Number of land
                                                                                          documents inventoried
                                                                                          in the Zones and
                                                                                          Antananarivo.

[[Page 47840]]

 
                                                                                         Number of land
                                                                                          documents restored in
                                                                                          the Zones and
                                                                                          Antananarivo.
                                                                                         Number of land
                                                                                          documents digitized in
                                                                                          the Zones and
                                                                                          Antananarivo.
                                                                                         Average time for Land
                                                                                          Services Offices to
                                                                                          issue a duplicate copy
                                                                                          of a title.
                                                                                         Average cost to a user
                                                                                          to obtain a duplicate
                                                                                          copy of a title from
                                                                                          the Land Services
                                                                                          Offices.
                                                                                         Number of land
                                                                                          certificates delivered
                                                                                          in the Zones during
                                                                                          the period.
                                                                                         Number of new guichets
                                                                                          fonciers operating in
                                                                                          the Zones.
                                                                                         The 256 Plan Local
                                                                                          d'Occupation Foncier--
                                                                                          Local Plan of Land
                                                                                          Occupation (PLOFs) are
                                                                                          completed.
Finance Project.................      $25,937,781  Increase                 $23,535,169  Volume of funds
                                                    Competition in the                    processed annually by
                                                    Financial Sector.                     the national payment
                                                                                          system.
                                                                                         The components
                                                                                          necessary to implement
                                                                                          the national payment
                                                                                          system are
                                                                                          operational: Network
                                                                                          equipment and
                                                                                          integrator, real time
                                                                                          gross settlement
                                                                                          system (RTGS), retail
                                                                                          payment clearing
                                                                                          system,
                                                                                          telecommunication
                                                                                          facilities.
                                                                                         Number of accountants
                                                                                          and financial experts
                                                                                          registered to become
                                                                                          Certified Public
                                                                                          Accountant (CPA).
                                                                                         Percent of Micro-
                                                                                          Finance Institution
                                                                                          (MFI) loans recorded
                                                                                          in the Central Bank
                                                                                          database.
Agricultural Business Investment      $13,687,196  Improve                  $13,581,752  Number of farmers that
 Project.                                           Agricultural                          adopt new technologies
                                                    Projection                            or engage in higher
                                                    Technologies and                      value production.
                                                    Market Capacity in                   Number of enterprises
                                                    Rural Areas.                          that adopt new
                                                                                          technologies or engage
                                                                                          in higher value
                                                                                          production.
                                                                                         Number of farmers
                                                                                          receiving technical
                                                                                          assistance.
                                                                                         Number of farmers
                                                                                          employing technical
                                                                                          assistance.
                                                                                         Number of businesses
                                                                                          receiving technical
                                                                                          assistance.
                                                                                         Number of
                                                                                          Minist[egrave]re de
                                                                                          l'Agriculture, de
                                                                                          l'Elevage et de la
                                                                                          P[ecirc]che--Ministry
                                                                                          of Agriculture,
                                                                                          Livestock, and Fishing
                                                                                          (MAEP) agents trained
                                                                                          in marketing and
                                                                                          investment promotion.
                                                                                         Zones identified and
                                                                                          description of
                                                                                          beneficiaries within
                                                                                          each zone submitted.
                                                                                         Number of people
                                                                                          receiving information
                                                                                          from Agricultural
                                                                                          Business Center (ABCs)
                                                                                          on business
                                                                                          opportunities.
                                                                                         Zonal investment
                                                                                          strategies for the
                                                                                          Zones are developed.
                                                                                         Number of ABC clients
                                                                                          who register as formal
                                                                                          enterprises,
                                                                                          cooperatives, or
                                                                                          associations.
                                                                                         Number of marketing
                                                                                          contracts of ABC
                                                                                          clients.
Program Administration* and           $18,250,091  ...................      $17,577,500
 Control, Monitoring and
 Evaluation.
Pending subsequent reports**....  ...............  ...................       $1,368,813
----------------------------------------------------------------------------------------------------------------
* Program administration funds are used to pay items such as salaries, rent, and the cost of office equipment.
** These amounts represent disbursements made that will be allocated to individual projects in the subsequent
 quarter(s) and reported as such in subsequent quarterly report(s).
*** Negative obligations for 2010 resulted from the deobligation of Nicaragua, Madagascar and Honduras. Senegal
 and Moldova are expected to be obligated in 2010.
----------------------------------------------------------------------------------------------------------------


[[Page 47841]]


 
                                                                           Cumulative
            Projects                 Obligated          Objectives       disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                      Country: Honduras Year: 2010 Quarter 2 Total Obligation: $205,000,000
       Entity to which the assistance is provided: MCA Honduras Total Quarterly Disbursement: $20,203,531
----------------------------------------------------------------------------------------------------------------
Rural Development Project.......      $68,327,183  Increase the             $50,641,703  Number of program
                                                    productivity and                      farmers harvesting
                                                    business skills of                    high-value
                                                    farmers who                           horticulture crops.
                                                    operate small and                    Number of hectares
                                                    medium-size farms                     harvesting high-value
                                                    and their                             horticulture crops.
                                                    employees.                           Number of business
                                                                                          plans prepared by
                                                                                          program farmers with
                                                                                          assistance from the
                                                                                          implementing entity.
                                                                                         Total value of net
                                                                                          sales.
                                                                                         Total number of
                                                                                          recruited farmers
                                                                                          receiving technical
                                                                                          assistance.
                                                                                         Value of loans
                                                                                          disbursed
                                                                                          (disaggregated by
                                                                                          trust fund, leveraged
                                                                                          from trust fund, and
                                                                                          institutions receiving
                                                                                          technical assistance
                                                                                          from ACDI-VOCA).
                                                                                         Number of loans
                                                                                          disbursed
                                                                                          (disaggregated by
                                                                                          trust fund, leveraged
                                                                                          from trust fund, and
                                                                                          institutions receiving
                                                                                          technical assistance
                                                                                          from ACDI-VOCA).
                                                                                         Percentage of loan
                                                                                          portfolio at risk
                                                                                          (disaggregated by
                                                                                          trust fund and
                                                                                          institutions receiving
                                                                                          technical assistance
                                                                                          from ACDI-VOCA).
                                                                                         Funds lent from the
                                                                                          trust fund to
                                                                                          financial
                                                                                          intermediaries through
                                                                                          lines of credit.
                                                                                         Number of hectares
                                                                                          under irrigation.
                                                                                         Number of beneficial
                                                                                          biological control
                                                                                          agents developed for
                                                                                          use by program farmers
                                                                                          or other farmers for
                                                                                          pilot testing.
                                                                                         Number of improved
                                                                                          coffee hybrids
                                                                                          available for cloning.
                                                                                         Number of farmers
                                                                                          connected to the
                                                                                          community irrigation
                                                                                          system.
                                                                                         Number of certified
                                                                                          deliverables across
                                                                                          all agricultural
                                                                                          public goods grant.
Transportation Project..........     $119,237,242  Reduce                   $90,472,182  Freight shipment cost
                                                    transportation                        from Tegucigalpa to
                                                    costs between                         Puerto Cortes.
                                                    targeted                             Average annual daily
                                                    production centers                    traffic volume--CA-5.
                                                    and national,                        International roughness
                                                    regional and                          index (IRI)--CA-5.
                                                    global markets.                      Kilometers of road
                                                                                          upgraded--CA-5.
                                                                                         Percent of contracted
                                                                                          road works disbursed--
                                                                                          CA-5.
                                                                                         Average annual daily
                                                                                          traffic volume--
                                                                                          secondary roads.
                                                                                         International roughness
                                                                                          index (IRI)--secondary
                                                                                          roads.
                                                                                         Kilometers of road
                                                                                          upgraded--secondary
                                                                                          roads.
                                                                                         Percent of contracted
                                                                                          road works disbursed--
                                                                                          secondary roads.
                                                                                         Average annual daily
                                                                                          traffic volume--rural
                                                                                          roads.
                                                                                         Average speed--rural
                                                                                          roads.
                                                                                         Kilometers of road
                                                                                          upgraded--rural roads.
                                                                                         Percent of contracted
                                                                                          road works disbursed--
                                                                                          rural roads.
                                                                                         Signed contracts for
                                                                                          feasibility and/or
                                                                                          design studies.
                                                                                         Percent of contracted
                                                                                          studies disbursed.
                                                                                         Kilometers (km) of
                                                                                          roads under design.
                                                                                         Signed contracts for
                                                                                          roads works.
                                                                                         Kilometers (km) of
                                                                                          roads under works
                                                                                          contracts.
Program Administration* and           $17,435,575  ...................       $9,715,941
 Control, Monitoring and
 Evaluation.
Pending subsequent reports**....  ...............  ...................       $1,521,767
----------------------------------------------------------------------------------------------------------------


[[Page 47842]]


 
                                                                           Cumulative
            Projects                 Obligated          Objectives       disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                     Country: Cape Verde Year: 2010 Quarter 2 Total Obligation: $110,078,488
       Entity to which the assistance is provided: MCA Cape Verde Total Quarterly Disbursement: $6,855,235
----------------------------------------------------------------------------------------------------------------
Watershed and Agricultural            $11,351,549  Increase                  $8,732,927  Productivity:
 Support.                                           agricultural                          Horticulture, Paul
                                                    production in                         watershed.
                                                    three targeted                       Productivity:
                                                    watershed areas on                    Horticulture, Faja
                                                    three islands.                        watershed.
                                                                                         Productivity:
                                                                                          Horticulture,
                                                                                          Mosteiros watershed.
                                                                                         Number of farmers
                                                                                          adopting drip
                                                                                          irrigation.
                                                                                         Area irrigated with
                                                                                          drip irrigation.
                                                                                         Percent of contracted
                                                                                          irrigation works
                                                                                          disbursed
                                                                                          (cumulative).
                                                                                         Reservoirs constructed.
                                                                                         Number of farmers that
                                                                                          have completed
                                                                                          training in at least 3
                                                                                          of 5 core agricultural
                                                                                          disciplines.
Infrastructure Improvement......      $83,160,208  Increase                 $55,788,977  Travel time ratio:
                                                    integration of the                    percentage of
                                                    internal market                       beneficiary population
                                                    and reduce                            further than 30
                                                    transportation                        minutes from nearest
                                                    costs.                                market.
                                                                                         Kilometers of roads
                                                                                          rehabilitated.
                                                                                         Percent of contracted
                                                                                          Santiago Roads works
                                                                                          disbursed
                                                                                          (cumulative).
                                                                                         Percent of contracted
                                                                                          Santo Antao Bridge
                                                                                          works disbursed
                                                                                          (cumulative).
                                                                                         Kilometers (km) of
                                                                                          roads under design.
                                                                                         Signed contracts for
                                                                                          roads works.
                                                                                         Kilometers (km) of
                                                                                          roads under works
                                                                                          contracts.
                                                                                         Port of Praia: percent
                                                                                          of contracted port
                                                                                          works disbursed
                                                                                          (cumulative).
                                                                                         Cargo village: percent
                                                                                          of works completed.
                                                                                         Quay 2 improvements:
                                                                                          percent of works
                                                                                          completed.
                                                                                         Access road: percent of
                                                                                          works completed.
Private Sector Development......       $2,081,223  Spur private sector       $1,297,409  Micro-Finance
                                                    development on all                    Institution (MFI)
                                                    islands through                       recovery rate,
                                                    increased                             adjusted.
                                                    investment in the                    MFI portfolio at risk,
                                                    priority sectors                      adjusted.
                                                    and through                          Ratio of MFIs
                                                    financial sector                      operationally self-
                                                    reform.                               sufficient.
Program Administration* and           $13,485,508  ...................       $9,836,845
 Control, Monitoring and
 Evaluation.
Pending subsequent reports**....  ...............  ...................         $337,480
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objectives       disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                     Country: Nicaragua Year: 2010 Quarter 2 Total Obligation: $113,546,407
       Entity to which the assistance is provided: MCA Nicaragua Total Quarterly Disbursement: $5,858,883
----------------------------------------------------------------------------------------------------------------
Property Regularization Project.       $7,205,205  Increase Investment       $5,586,254  Automated database of
                                                    by strengthening                      registry and cadastre
                                                    property rights.                      installed in the 10
                                                                                          municipalities of
                                                                                          Leon.
                                                                                         Value of land, urban.
                                                                                         Value of land, rural.
                                                                                         Time to conduct a land
                                                                                          transaction.
                                                                                         Number of additional
                                                                                          parcels with a
                                                                                          registered title,
                                                                                          urban.
                                                                                         Number of additional
                                                                                          parcels with a
                                                                                          registered title,
                                                                                          urban.
                                                                                         Number of protected
                                                                                          areas demarcated.
                                                                                         Area covered by
                                                                                          cadastral mapping.
                                                                                         Cost to conduct a land
                                                                                          transaction.
Transportation Project..........      $57,999,999  Reduce                   $51,794,412  Annual Average daily
                                                    transportation                        traffic volume: N1
                                                    costs between Leon                    Section R1.
                                                    and Chinandega and                   Annual Average daily
                                                    national, regional                    traffic volume: N1
                                                    and global markets.                   Section R2.
                                                                                         Annual Average daily
                                                                                          traffic volume: Port
                                                                                          Sandino (S13).
                                                                                         Annual Average daily
                                                                                          traffic volume:
                                                                                          Villanueva-Guasaule
                                                                                          Annual.
                                                                                         Average daily traffic
                                                                                          volume: Somotillo-
                                                                                          Cinco Pinos (S1).
                                                                                         Annual average daily
                                                                                          traffic volume:
                                                                                          Le[oacute]n-Poneloya-
                                                                                          Las Pe[ntilde]itas.
                                                                                         International Roughness
                                                                                          Index: N-I Section R1.

[[Page 47843]]

 
                                                                                         International Roughness
                                                                                          Index: N-I Section R2.
                                                                                         International Roughness
                                                                                          Index: Port Sandino
                                                                                          (S13.
                                                                                         International roughness
                                                                                          index: Villanueva-
                                                                                          Guasaule.
                                                                                         International roughness
                                                                                          index: Somotillo-Cinco
                                                                                          Pinos.
                                                                                         International roughness
                                                                                          index: Le[oacute]n-
                                                                                          Poneloya-Las
                                                                                          Pe[ntilde]itas.
                                                                                         Kilometers of NI
                                                                                          upgraded: R1 and R2
                                                                                          and S13.
                                                                                         Kilometers of NI
                                                                                          upgraded: Villanueva-
                                                                                          Guasaule.
                                                                                         Kilometers of S1 road
                                                                                          upgraded.
                                                                                         Kilometers of S9 road
                                                                                          upgraded.
                                                                                         Kilometers of designed
                                                                                          primary roads
                                                                                          (including N-I/Puerto
                                                                                          Sandino and V-G).
                                                                                         Kilometers of designed
                                                                                          secondary roads.
Rural Development Project.......      $32,897,500  Increase the value       $23,425,961  Number of beneficiaries
                                                    added of farms and                    with business plans
                                                    enterprises in the                    prepared with
                                                    region.                               assistance from the
                                                                                          Rural Development
                                                                                          Business Project.
                                                                                         Numbers of manzanas (1
                                                                                          Manzana = 1.7
                                                                                          hectares), by sector,
                                                                                          harvesting higher-
                                                                                          value crops.
                                                                                         Number of manzanas of
                                                                                          beneficiaries of the
                                                                                          program that harvest
                                                                                          higher-value crops
                                                                                          with irrigation or
                                                                                          commercial
                                                                                          reforestation under
                                                                                          Improvement of Water
                                                                                          Supply Activities.
                                                                                         Number of beneficiaries
                                                                                          implementing business
                                                                                          plans.
                                                                                         Average increase in
                                                                                          income of
                                                                                          beneficiaries due to
                                                                                          program.
Program Administration*, Due          $15,443,703  ...................      $11,414,813
 Diligence, Monitoring and
 Evaluation.
Pending subsequent reports**....  ...............  ...................       $1,459,801
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objectives       disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                      Country: Georgia Year: 2010 Quarter 2 Total Obligation: $395,300,000
        Entity to which the assistance is provided: MCA Georgia Total Quarterly Disbursement: $12,569,994
----------------------------------------------------------------------------------------------------------------
Regional Infrastructure              $310,750,000  Key Regional            $146,760,084  Household savings from
 Rehabilitation.                                    Infrastructure                        Infrastructure
                                                    Rehabilitated.                        Rehabilitation
                                                                                          Activities.
                                                                                         Savings in vehicle
                                                                                          operating costs (VOC).
                                                                                         International roughness
                                                                                          index (IRI).
                                                                                         Annual average daily
                                                                                          traffic (AADT).
                                                                                         Travel Time.
                                                                                         Kilometers of road
                                                                                          paved.
                                                                                         Percent of contracted
                                                                                          works disbursed.
                                                                                         Signed contracts for
                                                                                          feasibility and/or
                                                                                          design studies.
                                                                                         Percent of contracted
                                                                                          studies disbursed.
                                                                                         Kilometers of roads
                                                                                          under design.
                                                                                         Signed contracts for
                                                                                          road works.
                                                                                         Kilometers of toads
                                                                                          under works contracts.
                                                                                         Sites rehabilitated
                                                                                          (phases I, II, III)--
                                                                                          pipeline.
                                                                                         Construction works
                                                                                          completed (phase II)--
                                                                                          pipeline.
                                                                                         Savings in household
                                                                                          expenditures for all
                                                                                          subprojects.
                                                                                         Population Served by
                                                                                          all subprojects.
                                                                                         Subprojects completed.
                                                                                         Value of project grant
                                                                                          agreements signed.
                                                                                         Value of project works
                                                                                          and goods contracts
                                                                                          Signed.
                                                                                         Subprojects with works
                                                                                          initiated.
Regional Enterprise Development.      $52,530,800  Enterprises in           $38,981,083  Jobs Created by
                                                    Regions Developed.                    Agribusiness
                                                                                          Development Activity
                                                                                          (ADA) and by Georgia
                                                                                          Regional Development
                                                                                          Fund (GRDF).
                                                                                         Household net income--
                                                                                          ADA and GRDF.
                                                                                         Jobs created--ADA.
                                                                                         Firm income ADA.
                                                                                         Household net income--
                                                                                          ADA.
                                                                                         Beneficiaries (direct
                                                                                          and indirect)--ADA.
                                                                                         Grant agreements
                                                                                          signed--ADA.

[[Page 47844]]

 
                                                                                         Increase in gross
                                                                                          revenues of portfolio
                                                                                          companies (PC).
                                                                                         Increase in portfolio
                                                                                          company employees.
                                                                                         Increase in wages paid
                                                                                          to the portfolio
                                                                                          company employees.
                                                                                         Cumulative number of
                                                                                          Portfolio companies.
                                                                                         Funds disbursed to the
                                                                                          portfolio companies.
Program Administration*, Due          $32,019,200  ...................      $17,670,271
 Diligence, Monitoring and
 Evaluation.
Pending subsequent reports**....  ...............  ...................         $239,930
----------------------------------------------------------------------------------------------------------------
November 2008, MCC and the Georgian government signed a Compact amendment making up to $100 million of
 additional funds available to the Millennium Challenge Georgia Fund. These funds will be used to complete works
 in the Roads, Regional Infrastructure Development, and Energy Rehabilitation Projects contemplated by the
 original Compact. The amendment was ratified by the Georgian parliament and entered into force on January 30,
 2009.
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objectives       disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                       Country: Vanuatu Year: 2010 Quarter 2 Total Obligation: $65,690,000
        Entity to which the assistance is provided: MCA Vanuatu Total Quarterly Disbursement: $3,126,997
----------------------------------------------------------------------------------------------------------------
Transportation Infrastructure         $60,162,579  Facilitate               $45,219,525  Number of international
 Project.                                           transportation to                     tourists--Efate.
                                                    increase tourism                     Number of international
                                                    and business                          tourists--Santo.
                                                    development.                         Number of room nights
                                                                                          occupied--Efate.
                                                                                         Number of room nights
                                                                                          occupied--Santo.
                                                                                         Average annual daily
                                                                                          traffic--Efate.
                                                                                         Average annual daily
                                                                                          traffic--Santo.
                                                                                         Kilometers of road
                                                                                          upgraded--Efate.
                                                                                         Kilometers of roads
                                                                                          upgraded--Santo.
                                                                                         Signed contracts for
                                                                                          feasibility and/or
                                                                                          design studies.
                                                                                         Percent of contracted
                                                                                          studies disbursed.
                                                                                         Kilometers (km) of
                                                                                          roads under design.
                                                                                         Signed contracts for
                                                                                          roads works.
                                                                                         Kilometers (km) of
                                                                                          roads under works
                                                                                          contracts.
                                                                                         Percent of contracted
                                                                                          roads works disbursed.
Program Administration*, Due           $5,527,421  ...................       $3,029,668
 Diligence, Monitoring and
 Evaluation.
Pending subsequent reports**....  ...............  ...................          $40,780
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objectives       disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                      Country: Armenia Year: 2010 Quarter 2 Total Obligation: $235,650,000
        Entity to which the assistance is provided: MCA Armenia Total Quarterly Disbursement: $9,068,556
----------------------------------------------------------------------------------------------------------------
Irrigated Agriculture Project        $152,709,208  Increase                 $45,101,470  Recovery of Water User
 (Agriculture and Water).                           agricultural                          Associations (WUA)
                                                    productivity and                      operations and
                                                    Improve and                           maintenance cost by
                                                    Quality of                            water charges.
                                                    Irrigation.                          Primary canals
                                                                                          rehabilitated.
                                                                                         Tertiary canals
                                                                                          rehabilitated.
                                                                                         Percent of contracted
                                                                                          irrigation works
                                                                                          disbursed.
                                                                                         Value of signed
                                                                                          contracts for
                                                                                          irrigation works.
                                                                                         Number of farmers using
                                                                                          better on-farm water
                                                                                          management.
                                                                                         Number of farmers
                                                                                          trained.
                                                                                         Number of
                                                                                          agribusinesses
                                                                                          assisted.
                                                                                         Value of agricultural
                                                                                          loans to farmers/
                                                                                          agribusinesses.
Rural Road Rehabilitation             $67,100,000  Better access to          $7,870,944  Average annual daily
 Project.                                           economic and                          traffic.
                                                    social                               International roughness
                                                    infrastructure.                       index.
                                                                                         Kilometers of roads
                                                                                          rehabilitated.
                                                                                         Percent of contracted
                                                                                          roads works disbursed.
                                                                                         Signed contracts for
                                                                                          roads works.
                                                                                         Percent of contracted
                                                                                          studies disbursed.
                                                                                         kilometers (km) of
                                                                                          roads under design.
                                                                                         Signed contracts for
                                                                                          feasibility and/or
                                                                                          design studies.
                                                                                         Kilometers (km) of
                                                                                          roads under works
                                                                                          contracts.

[[Page 47845]]

 
Program Administration*, Due          $15,840,792  ...................       $9,116,839
 Diligence, Monitoring and
 Evaluation.
Pending subsequent reports**....  ...............  ...................       $1,007,199
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objectives       disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                       Country: Benin Year: 2010 Quarter 2 Total Obligation: $307,298,040
         Entity to which the assistance is provided: MCA Benin Total Quarterly Disbursement: $8,344,844
----------------------------------------------------------------------------------------------------------------
Access to Financial Services....      $19,649,999  Expand Access to          $3,943,254  Volume of credits
                                                    Financial Services.                   granted by the Micro-
                                                                                          Finance Institutions
                                                                                          (MFI).
                                                                                         Volume of saving
                                                                                          collected by the Micro-
                                                                                          Finance Institutions.
                                                                                         Average portfolio at
                                                                                          risk >90 days of
                                                                                          microfinance
                                                                                          institutions at the
                                                                                          national level.
                                                                                         Operational self-
                                                                                          sufficiency of MFIs at
                                                                                          the national level.
                                                                                         Average time required
                                                                                          by Cellule de
                                                                                          Surveillance des
                                                                                          Structures
                                                                                          Financi[egrave]res
                                                                                          D[eacute]centralis[eac
                                                                                          ute]es (CSSFD) in
                                                                                          treating MFI
                                                                                          applications.
                                                                                         Number of institutions
                                                                                          receiving grants
                                                                                          through the Facility.
                                                                                         Second call for
                                                                                          proposal for grants
                                                                                          launched.
                                                                                         Number of MFIs
                                                                                          inspected by CSSFD.
Access to Justice...............      $34,270,000  Improved Ability of       $2,474,444  Average time to enforce
                                                    Justice System to                     a contract.
                                                    Enforce Contracts                    Percent of firms
                                                    and Reconcile                         reporting confidence
                                                    Claims.                               in the judicial
                                                                                          system.
                                                                                         Number of cases
                                                                                          processed at
                                                                                          Arbitration Center per
                                                                                          year.
                                                                                         Number of Information,
                                                                                          Education and
                                                                                          Communication Campaign
                                                                                          (IEC) sessions hosted
                                                                                          by Chamber of Commerce
                                                                                          (CAMeC).
                                                                                         Passage of new legal
                                                                                          codes.
                                                                                         Average time required
                                                                                          for Tribunaux de
                                                                                          premiere instance--
                                                                                          arbitration centers
                                                                                          and courts of first
                                                                                          instance (TPI) to
                                                                                          reach a final decision
                                                                                          on a case.
                                                                                         Average time required
                                                                                          for Court of Appeals
                                                                                          to reach a final
                                                                                          decision on a case.
                                                                                         Percent of cases
                                                                                          resolved in TPI per
                                                                                          year.
                                                                                         Percent of cases
                                                                                          resolved in Court of
                                                                                          Appeals per year.
                                                                                         Number of Court
                                                                                          inspections per year.
                                                                                         Number of Court
                                                                                          employees trained.
                                                                                         Number of beneficiaries
                                                                                          of legal aid services.
                                                                                         Complete construction
                                                                                          on 9 new court houses.
                                                                                         Average time required
                                                                                          to register a business
                                                                                          (soci[eacute]t[eacute]
                                                                                          ).
                                                                                         Average time required
                                                                                          to register a business
                                                                                          (sole proprietorship).
                                                                                         Number of businesses
                                                                                          accessing CAMEC
                                                                                          service.
                                                                                         Business registration
                                                                                          center (CFE)
                                                                                          information and
                                                                                          outreach campaign
                                                                                          executed throughout
                                                                                          Benin.
Access to Land..................      $36,020,000  Strengthen property      $13,378,640  Total value of
                                                    rights and                            investment in targeted
                                                    increase                              urban land parcels.
                                                    investment in                        Total value of
                                                    rural and urban                       investment in targeted
                                                    land.                                 rural land parcels.
                                                                                         Average cost required
                                                                                          to obtain a new land
                                                                                          title through on
                                                                                          demand process.
                                                                                         Average cost required
                                                                                          to convert occupancy
                                                                                          permit to land title
                                                                                          through systematic
                                                                                          process.
                                                                                         Percentage of
                                                                                          respondents perceiving
                                                                                          land security in the
                                                                                          Occupancy Permit (PH)
                                                                                          into Land titles (TF)
                                                                                          or Rural Land Plan
                                                                                          Foncier Rural (PFR)
                                                                                          areas.
                                                                                         Number of new land
                                                                                          disputes reported by
                                                                                          commune heads.
                                                                                         Seven studies complete.
                                                                                         Land code texts adopted
                                                                                          (laws, decrees and
                                                                                          land code).

[[Page 47846]]

 
                                                                                         Value ($) of equipment
                                                                                          purchased.
                                                                                         Number of land
                                                                                          certificates issued
                                                                                          within MCA-Benin
                                                                                          implementation.
                                                                                         Number of habitation
                                                                                          permits converted to
                                                                                          land titles.
                                                                                         Number of Continuously
                                                                                          Operating Reference
                                                                                          (CORS) stations
                                                                                          installed.
                                                                                         Number of public and
                                                                                          private surveyors
                                                                                          trained.
                                                                                         Number of communes with
                                                                                          new cadastres.
                                                                                         Land market information
                                                                                          system established.
Access to Markets...............     $169,447,001  Improve Access to        $32,086,625  Volume of merchandise
                                                    Markets through                       traffic through the
                                                    Improvements to                       Port Autonome de
                                                    the Port of                           Cotonou.
                                                    Cotonou.                             Bulk ship carriers
                                                                                          waiting times at the
                                                                                          port.
                                                                                         Container ship waiting
                                                                                          times at the port.
                                                                                         Port design-build
                                                                                          contract awarded.
                                                                                         Port crime levels
                                                                                          (number of thefts).
                                                                                         Internal port
                                                                                          circulation time.
                                                                                         Average time to clear
                                                                                          customs.
                                                                                         Execution rate of
                                                                                          training plan.
                                                                                         Port meets--
                                                                                          international port
                                                                                          security standards
                                                                                          (ISPS).
                                                                                         Public consultation
                                                                                          completed (3).
                                                                                         Environmental permits
                                                                                          issued.
Program Administration*, Due          $47,911,040  ...................      $22,482,370
 Diligence, Monitoring and
 Evaluation.
Pending subsequent reports**....  ...............  ...................         $283,061
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objectives       disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                       Country: Ghana Year: 2010 Quarter 2 Total Obligation: $547,009,000
         Entity to which the assistance is provided: MCA Ghana Total Quarterly Disbursement: $21,933,254
----------------------------------------------------------------------------------------------------------------
Agriculture Project.............     $227,899,382  Enhance                  $73,381,076  Number of farmers
                                                    Profitability of                      trained.
                                                    cultivation,                         Number of
                                                    services to                           agribusinesses
                                                    agriculture and                       assisted.
                                                    product handling                     Number of hectares
                                                    in support of the                     under production with
                                                    expansion of                          MCC support.
                                                    commercial                           Value of agricultural
                                                    agriculture among                     loans to farmers/
                                                    groups of                             agribusinesses.
                                                    smallholder farms.                   Value of signed
                                                                                          contracts for
                                                                                          feasibility and/or
                                                                                          design studies
                                                                                          (irrigation).
                                                                                         Percent of contracted
                                                                                          (design/feasibility)
                                                                                          studies complete
                                                                                          (irrigation).
                                                                                         Value of signed
                                                                                          contracts for
                                                                                          irrigation works
                                                                                          (irrigation).
                                                                                         Percent of contracted
                                                                                          irrigation works
                                                                                          disbursed.
                                                                                         Percent of people aware
                                                                                          of their land rights.
                                                                                         Total number of parcels
                                                                                          surveyed in the Pilot
                                                                                          Land Registration
                                                                                          Areas (PLRAs).
                                                                                         Volume of products
                                                                                          passing through post-
                                                                                          harvest treatment.
Rural Development Project.......      $89,361,539  Strengthen the           $14,660,025  Number of students
                                                    rural institutions                    enrolled in schools
                                                    that provide                          affected by Education
                                                    services                              Facilities Sub-
                                                    complementary to,                     Activity.
                                                    and supportive of,                   Number of schools
                                                    agricultural and                      rehabilitated.
                                                    agriculture                          Number of basic school
                                                    business                              blocks constructed to
                                                    development.                          Ministry of Education
                                                                                          (MOE) construction
                                                                                          standards.
                                                                                         Number of schools
                                                                                          designed and due
                                                                                          diligence completed.
                                                                                         Distance to collect
                                                                                          water.
                                                                                         Time to collect water.
                                                                                         Incidence of guinea
                                                                                          worm.
                                                                                         Average number of days
                                                                                          lost due to guinea
                                                                                          worm.
                                                                                         Number of people
                                                                                          affected by Water and
                                                                                          Sanitation Facilities
                                                                                          Sub-Activity.
                                                                                         Number of stand-alone
                                                                                          boreholes/wells/
                                                                                          nonconventional water
                                                                                          systems constructed/
                                                                                          rehabilitated.
                                                                                         Number of small-town
                                                                                          water systems
                                                                                          constructed.
                                                                                         Number of pipe
                                                                                          extension projects
                                                                                          constructed.
                                                                                         Number of stand-alone
                                                                                          boreholes/wells/non-
                                                                                          conventional water
                                                                                          systems identified and
                                                                                          due diligence
                                                                                          performed for
                                                                                          rehabilitation/
                                                                                          construction.

[[Page 47847]]

 
                                                                                         Number of small-town
                                                                                          water systems designed
                                                                                          and due diligence
                                                                                          completed for
                                                                                          construction.
                                                                                         Number of pipe
                                                                                          extension projects
                                                                                          designed and due
                                                                                          diligence completed
                                                                                          for construction.
                                                                                         Number of agricultural
                                                                                          processing plants in
                                                                                          target districts with
                                                                                          electricity due to
                                                                                          Rural Electrification
                                                                                          Sub-Activity.
                                                                                         Number of electricity
                                                                                          projects identified
                                                                                          and due diligence
                                                                                          completed.
Transportation..................     $174,285,120  Reduce the               $35,543,256  International roughness
                                                    transportation                        index.
                                                    costs affecting                      Annualized average
                                                    agriculture                           daily traffic.
                                                    commerce at sub-                     Kilometers of road
                                                    regional levels.                      completed.
                                                                                         Percent of contracted
                                                                                          road works disbursed.
                                                                                         Value of signed
                                                                                          contracts for road
                                                                                          works.
                                                                                         Kilometers of road
                                                                                          designed.
                                                                                         Percent of contracted
                                                                                          design/feasibility
                                                                                          studies completed.
                                                                                         Value of signed
                                                                                          contracts for
                                                                                          feasibility and/or
                                                                                          design studies.
                                                                                         Travel time for walk-on
                                                                                          passengers.
                                                                                         Travel time for small
                                                                                          vehicles.
                                                                                         Travel time for trucks.
                                                                                         Annual average daily
                                                                                          traffic (vehicles).
                                                                                         Annual average daily
                                                                                          traffic (passengers).
                                                                                         Landing stages
                                                                                          rehabilitated.
                                                                                         Ferry terminal
                                                                                          upgraded.
                                                                                         Rehabilitation of
                                                                                          Akosombo Floating Dock
                                                                                          completed.
                                                                                         Percent of contracted
                                                                                          work disbursed
                                                                                          landings and
                                                                                          terminals.
                                                                                         Value of signed
                                                                                          contracts for works:
                                                                                          Ferry and floating
                                                                                          dock.
                                                                                         Value of signed
                                                                                          contracts for works:
                                                                                          Landings and
                                                                                          terminals.
Program Administration*, Due          $55,462,959  ...................      $21,548,749
 Diligence, Monitoring and
 Evaluation.
Pending subsequent reports**....  ...............  ...................          -$1,755
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objectives       disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                    Country: El Salvador Year: 2010 Quarter 2 Total Obligation: $460,940,000
      Entity to which the assistance is provided: MCA El Salvador Total Quarterly Disbursement: $26,132,618
----------------------------------------------------------------------------------------------------------------
Human Development Project.......      $95,073,000  Increase human and       $15,830,730  Employment rate of
                                                    physical capital                      graduates of middle
                                                    of residents of                       technical schools.
                                                    the Northern Zone                    Graduation rates of
                                                    to take advantage                     middle technical
                                                    of employment and                     schools.
                                                    business                             Middle technical
                                                    opportunities.                        schools remodeled and
                                                                                          equipped.
                                                                                         Scholarships granted to
                                                                                          students of middle
                                                                                          technical schools.
                                                                                         Students of non-formal
                                                                                          training.
                                                                                         Cost of water.
                                                                                         Time collecting water.
                                                                                         Households benefiting
                                                                                          with water solutions
                                                                                          built.
                                                                                         Potable water and basic
                                                                                          sanitation systems
                                                                                          with construction
                                                                                          contracts signed.
                                                                                         Cost of electricity.
                                                                                         Electricity
                                                                                          consumption.
                                                                                         Households benefiting
                                                                                          with a connection to
                                                                                          the electricity
                                                                                          network.
                                                                                         Household benefiting
                                                                                          with the installation
                                                                                          of isolated solar
                                                                                          systems.
                                                                                         Kilometers of new
                                                                                          electrical lines with
                                                                                          construction contracts
                                                                                          signed.
                                                                                         Population benefiting
                                                                                          from strategic
                                                                                          infrastructure.
                                                                                         Community
                                                                                          Infrastructure Works
                                                                                          with Construction
                                                                                          Contracts Signed.
Productive Development Project..      $87,466,000  Increase production      $21,919,506  Number of hectares
                                                    and employment in                     under production with
                                                    the Northern Zone.                    MCC support.
                                                                                         Number of farmers
                                                                                          trained.

[[Page 47848]]

 
                                                                                         Value of agricultural
                                                                                          loans to farmers/
                                                                                          agribusinesses.
                                                                                         Number of
                                                                                          agribusinesses
                                                                                          assisted.
Connectivity Project............     $233,559,999  Reduce travel cost       $41,423,394  Average annual daily
                                                    and time within                       traffic.
                                                    the Northern Zone,                   International roughness
                                                    with the rest of                      index.
                                                    the country, and                     Kilometers of roads
                                                    within the region.                    rehabilitated.
                                                                                         Kilometers of roads
                                                                                          under works contract.
                                                                                         Signed contracts for
                                                                                          roads works.
                                                                                         Percent of contracted
                                                                                          roads works disbursed.
Program Administration* and           $54,718,001  ...................      $13,105,371
 Control, Monitoring and
 Evaluation.
Pending Subsequent Report**.....  ...............  ...................               $0
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objectives       disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                        Country: Mali Year: 2010 Quarter 2 Total Obligation: $460,811,164
         Entity to which the assistance is provided: MCA Mali Total Quarterly Disbursement: $18,557,892
----------------------------------------------------------------------------------------------------------------
Bamako S[eacute]nou Airport          $181,254,264  Establish an             $11,978,769  Total wage bill of
 Improvement Project.                               independent and                       tourism industry.
                                                    secure link to the                   Freight volume.
                                                    regional and                         Employment at airport.
                                                    global economy.                      Signature of design
                                                                                          contract.
                                                                                         Average number of
                                                                                          weekly flights
                                                                                          (arrivals).
                                                                                         Passenger traffic
                                                                                          (annual average).
                                                                                         Percent works complete.
                                                                                         Airside Infrastructure
                                                                                          Design, and Airside
                                                                                          Infrastructure
                                                                                          Construction
                                                                                          Supervision, (AIR A01)
                                                                                          and Landside
                                                                                          Infrastructure Design
                                                                                          (New Terminal &
                                                                                          Associated Works) and
                                                                                          Landside Construction
                                                                                          Supervision is
                                                                                          launched.
                                                                                         Time required for
                                                                                          passenger processing
                                                                                          at departures and
                                                                                          arrivals.
                                                                                         Passenger satisfaction
                                                                                          level.
                                                                                         Percent works complete.
                                                                                         Percent of airport
                                                                                          management and
                                                                                          maintenance plan
                                                                                          implemented.
                                                                                         Airport meets Federal
                                                                                          Aviation
                                                                                          Administration (FAA)
                                                                                          and International
                                                                                          Civil Aviation
                                                                                          Organization (ICAO)
                                                                                          security standards.
                                                                                         Technical assistance
                                                                                          delivered to project.
Alatona Irrigation Project......     $234,884,675  Increase the             $46,189,523  Number of agricultural
                                                    agricultural                          jobs created in
                                                    production and                        Alatona zone.
                                                    productivity in                      Main season rice
                                                    the Alatona zone                      yields.
                                                    of the ON.                           International roughness
                                                                                          index (IRI) on the
                                                                                          Niono-Goma Coura
                                                                                          Route.
                                                                                         Average daily vehicle
                                                                                          count.
                                                                                         Percentage works
                                                                                          complete.
                                                                                         Total irrigated land in
                                                                                          the Alatona zone.
                                                                                         Irrigation system
                                                                                          efficiency on Alatona
                                                                                          Canal during the rainy
                                                                                          season and the dry
                                                                                          season.
                                                                                         Kilometers of road
                                                                                          under design/
                                                                                          feasibility study.
                                                                                         Value of signed
                                                                                          contracts for road
                                                                                          works.
                                                                                         Kilometers of road
                                                                                          under works contract.
                                                                                         Percent of works
                                                                                          completed on main
                                                                                          system construction.
                                                                                         Percent of contracted
                                                                                          irrigation works
                                                                                          disbursed for tranche
                                                                                          1.
                                                                                         Value of signed
                                                                                          contracts for
                                                                                          irrigation works.
                                                                                         Value of signed
                                                                                          contracts for
                                                                                          feasibility and/or
                                                                                          design studies.
                                                                                         Percent of contracted
                                                                                          (design/feasibility)
                                                                                          studies disbursed.
                                                                                         Area planted by new
                                                                                          settlers (wet season).
                                                                                         Titles registered in
                                                                                          the land registration
                                                                                          office of the Alatona
                                                                                          zone (for 5- or 10-
                                                                                          hectare farms).
                                                                                         Total land payments
                                                                                          made.
                                                                                         Total market gardens
                                                                                          allocated in Alatona
                                                                                          zones for the
                                                                                          populations affected
                                                                                          by the project (PAPs).

[[Page 47849]]

 
                                                                                         Decree transferring
                                                                                          legal control of the
                                                                                          project impact area is
                                                                                          passed.
                                                                                         Selection criteria for
                                                                                          new settlers approved.
                                                                                         Contractor implementing
                                                                                          the ``Mapping of
                                                                                          Agricultural and
                                                                                          Communal Land
                                                                                          Parcels'' contract is
                                                                                          mobilized.
                                                                                         School enrollment rate.
                                                                                         Percent of Alatona
                                                                                          population with access
                                                                                          to drinking water.
                                                                                         Number of schools
                                                                                          available in the
                                                                                          Alatona.
                                                                                         Number of health
                                                                                          centers available in
                                                                                          the Alatona.
                                                                                         Number of concessions
                                                                                          that have been
                                                                                          compensated.
                                                                                         Resettlement census
                                                                                          verified.
                                                                                         Adoption rate of
                                                                                          improved agriculture
                                                                                          techniques among
                                                                                          populations affected
                                                                                          by the project (PAPs).
                                                                                         Number of operational
                                                                                          mixed cooperatives.
                                                                                         Area planted by PAPs
                                                                                          (wet season rice).
                                                                                         Area planted with
                                                                                          shallots during dry
                                                                                          season.
                                                                                         Number of farmers
                                                                                          completing literacy
                                                                                          training.
                                                                                         Number of people
                                                                                          completing the rice
                                                                                          and shallot production
                                                                                          techniques module.
                                                                                         Number of farmers
                                                                                          completing land
                                                                                          titling training.
                                                                                         Water management system
                                                                                          design and capacity
                                                                                          building strategy
                                                                                          implemented.
                                                                                         Call for proposals for
                                                                                          the applied research
                                                                                          grants launched.
                                                                                         Average portfolio at
                                                                                          risk among Alatona
                                                                                          microfinance
                                                                                          institutions.
                                                                                         Average loan repayment
                                                                                          rate of Alatona
                                                                                          clients (farmers
                                                                                          organizations or
                                                                                          individual farmers).
                                                                                         Amount of credit
                                                                                          extended to Alatona
                                                                                          farmers.
                                                                                         Number of farmers
                                                                                          accessing grant
                                                                                          assistance for first
                                                                                          loan from financial
                                                                                          institutions.
                                                                                         Financial institution
                                                                                          partners identified
                                                                                          (report on assessment
                                                                                          of the financial
                                                                                          institutions in the
                                                                                          Office du Niger--
                                                                                          Office of Niger zone
                                                                                          (ON zone)).
Industrial Park Project.........       $2,643,432  Develop a platform        $2,637,472  Occupancy level.
                                                    for industrial                       Average number of days
                                                    activity to be                        required for operator
                                                    located within the                    to connect to
                                                    Airport domain.                       Industrial Park water
                                                                                          and electricity
                                                                                          services.
Program Administration* and           $42,028,793  ...................      $18,330,983
 Control, Monitoring and
 Evaluation.
Pending Subsequent Report**.....  ...............  ...................               $3
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objectives       disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                      Country: Mongolia Year: 2010 Quarter 2 Total Obligation: $284,902,443
        Entity to which the assistance is provided: MCA Mongolia Total Quarterly Disbursement: $2,169,773
----------------------------------------------------------------------------------------------------------------
Property Rights Project.........      $22,910,728  Increase security         $1,317,528  Number of studies
                                                    and capitalization                    completed.
                                                    of land assets                       Legal and regulatory
                                                    held by lower-                        reforms adopted.
                                                    income Mongolians,                   Number of landholders
                                                    and increased peri-                   reached by public
                                                    urban herder                          outreach efforts.
                                                    productivity and                     Personnel Trained.
                                                    incomes.                             Number of Buildings
                                                                                          rehabilitated/
                                                                                          constructed.
                                                                                         Value of equipment
                                                                                          purchased.
                                                                                         Rural hectares Mapped.
                                                                                         Urban Parcels Mapped.
                                                                                         Rural Hectares
                                                                                          Formalized.
                                                                                         Urban parcels
                                                                                          formalized.

[[Page 47850]]

 
Rail Project....................     $188,378,000  Increase rail               $369,560  Increase in gross
                                                    traffic and                           domestic product due
                                                    shipping                              to rail improvements.
                                                    efficiency.                          Freight turnover.
                                                                                         Mine traffic.
                                                                                         Percent of wagons
                                                                                          leased by private
                                                                                          firms.
                                                                                         Railway operating
                                                                                          ratio.
                                                                                         Customer satisfaction.
                                                                                         Wagon time to
                                                                                          destination.
                                                                                         Average locomotive
                                                                                          availability.
Vocational Education Project....      $25,492,856  Increase employment       $1,431,975  Rate of employment.
                                                    and income among                     Students completing
                                                    unemployed and                        newly designed long-
                                                    underemployed                         term programs.
                                                    Mongolians.                          Percent of active
                                                                                          teachers receiving
                                                                                          certification
                                                                                          training.
                                                                                         Technical and
                                                                                          vocational education
                                                                                          and training (TVET)
                                                                                          legislation passed.
Health Project..................      $16,969,757  Increase the              $1,273,192  Diabetes and
                                                    adoption of                           hypertension
                                                    behaviors that                        controlled.
                                                    reduce non-                          Percentage of cancer
                                                    communicable                          cases diagnosed in
                                                    diseases (NCDIs)                      early stages.
                                                    among target                         Road and traffic safety
                                                    populations and                       activity finalized and
                                                    improved medical                      key interventions
                                                    treatment and                         developed.
                                                    control of NCDIs.
Program Administration* and           $31,151,102  ...................       $7,523,502
 Control, Monitoring and
 Evaluation.
Pending subsequent reports**....  ...............  ...................          $43,201
----------------------------------------------------------------------------------------------------------------
In late 2009, the MCC's Board of Directors approved the allocation of a portion of the funds originally
 designated for the rail project to the expansion of the health, vocational education and property right
 projects from the rail project, and the remaining portion to the addition of a road project.
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objectives       disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                     Country: Mozambique Year: 2010 Quarter 2 Total Obligation: $506,924,053
       Entity to which the assistance is provided: MCA Mozambique Total Quarterly Disbursement: $4,957,265
----------------------------------------------------------------------------------------------------------------
Water and Sanitation Project....     $203,585,393  Increase access to        $3,085,162  Time to get to non-
                                                    reliable and                          private water source.
                                                    quality water and                    Percent of urban
                                                    sanitation                            population with
                                                    facilities.                           improved water
                                                                                          sources.
                                                                                         Percent of urban
                                                                                          population with
                                                                                          improved sanitation
                                                                                          facilities.
                                                                                         Number of private
                                                                                          household water
                                                                                          connections in urban
                                                                                          areas.
                                                                                         Number of private
                                                                                          household sanitation
                                                                                          connections in urban
                                                                                          areas.
                                                                                         Number of standpipes in
                                                                                          urban areas.
                                                                                         Final detailed design
                                                                                          for 5 towns submitted.
                                                                                         Final detailed design
                                                                                          for 3 cities
                                                                                          submitted.
                                                                                         Percent of rural
                                                                                          population with access
                                                                                          to improved water
                                                                                          sources.
                                                                                         Number of rural water
                                                                                          points constructed.
                                                                                         Final design report 1
                                                                                          (400 WP) submitted.
                                                                                         Final design report II
                                                                                          (200 Water points)
                                                                                          submitted.
                                                                                         Implementing agreement
                                                                                          signed with the
                                                                                          Administration for
                                                                                          Water and Sanitation
                                                                                          (AIAS) Infrastructure.
                                                                                         Change in international
                                                                                          roughness index (IRI).
Road Rehabilitation Project.....     $176,307,480  Increase access to        $1,339,678  Average annual daily
                                                    productive                            traffic volume.
                                                    resources and                        Kilometers of road
                                                    markets.                              rehabilitated.
                                                                                         Kilometers of road
                                                                                          under design.
                                                                                         Percent of Namialo-Rio
                                                                                          L[uacute]rio Road--
                                                                                          Metoro feasibility,
                                                                                          design, and
                                                                                          supervision contract
                                                                                          disbursed.
                                                                                         Percent of Rio Ligonha-
                                                                                          Nampula feasibility,
                                                                                          design, and
                                                                                          supervision contract
                                                                                          disbursed.
                                                                                         Percent of Chimuara-
                                                                                          Nicoadala feasibility,
                                                                                          design, and
                                                                                          supervision contract
                                                                                          disbursed.
                                                                                         Kilometers of roads
                                                                                          under works contract.
                                                                                         Percent of Namialo-Rio
                                                                                          L[uacute]rio Road
                                                                                          construction contract
                                                                                          disbursed.

[[Page 47851]]

 
                                                                                         Percent of Rio
                                                                                          L[uacute]rio--Metoro
                                                                                          Road construction
                                                                                          contract disbursed.
                                                                                         Percent of Rio Ligonha-
                                                                                          Nampula Road
                                                                                          construction contract
                                                                                          disbursed.
                                                                                         Percent of Chimuara-
                                                                                          Nicoadala Road
                                                                                          construction contract
                                                                                          disbursed.
                                                                                         Feasibility/
                                                                                          Environmental and
                                                                                          Social Assessment
                                                                                          studies, design,
                                                                                          supervision, and
                                                                                          construction contract
                                                                                          (ESA) for Namialo-Rio
                                                                                          L[uacute]rio--Metoro
                                                                                          Road segment signed.
                                                                                         Feasibility/ESA
                                                                                          contract for Rio
                                                                                          Ligonha-Nampula Road
                                                                                          segment signed.
                                                                                         Feasibility/ESA
                                                                                          contract for Chimuara-
                                                                                          Nicoadala Road signed.
                                                                                         Time to get land usage
                                                                                          rights direito de uso
                                                                                          e aproveitamento da
                                                                                          terra (state-granted
                                                                                          land right) (DUAT).
Land Tenure Services Project....      $39,068,307  Establish                 $3,125,681  Cost to get land usage
                                                    efficient, secure                     rights DUAT.
                                                    land access for                      Total number of
                                                    households and                        officials and
                                                    investors.                            residents reached with
                                                                                          land strategy and
                                                                                          policy awareness and
                                                                                          outreach messages.
                                                                                         Land strategy approved.
                                                                                         Number of buildings
                                                                                          rehabilitated or
                                                                                          built.
                                                                                         Total value of procured
                                                                                          equipment and
                                                                                          materials.
                                                                                         Number of people
                                                                                          trained.
                                                                                         Rural hectares mapped
                                                                                          in Site Specific
                                                                                          Activity.
                                                                                         Rural hectares mapped
                                                                                          in Community Land Fund
                                                                                          Initiative.
                                                                                         Urban parcels mapped.
                                                                                         Rural hectares
                                                                                          formalized through
                                                                                          Site Specific
                                                                                          Activity.
                                                                                         Rural hectares
                                                                                          formalized through
                                                                                          Community Land Fund
                                                                                          Initiative.
                                                                                         Urban parcels
                                                                                          formalized.
                                                                                         Number of communities
                                                                                          delimited.
                                                                                         Number of households
                                                                                          having land
                                                                                          formalized.
                                                                                         Income from coconuts
                                                                                          and coconut products.
Farmer Income Support Project...      $18,400,117  Improve coconut           $1,979,071  Survival rate of
                                                    productivity and                      coconut seedling.
                                                    diversification                      Number of diseased or
                                                    into cash crop.                       dead palm trees
                                                                                          cleared.
                                                                                         Number of coconut
                                                                                          seedlings planted.
                                                                                         Hectares under
                                                                                          production.
                                                                                         Number of farmers
                                                                                          trained in pest and
                                                                                          disease control.
                                                                                         Number of farmers
                                                                                          trained in crop
                                                                                          diversification
                                                                                          technologies.
Program Administration* and           $69,562,756  ...................      $10,618,260  Contract for project
 Control, Monitoring and                                                                  implementation signed.
 Evaluation.
Pending Subsequent Report**.....  ...............  ...................         $947,078
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objectives       disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                      Country: Lesotho Year: 2010 Quarter 2 Total Obligation: $362,527,119
        Entity to which the assistance is provided: MCA Lesotho Total Quarterly Disbursement: $8,132,856
----------------------------------------------------------------------------------------------------------------
Water Project...................     $164,027,999  Improve the water         $7,962,527  School days lost due to
                                                    supply for                            water borne diseases.
                                                    industrial and                       Diarrhea notification
                                                    domestic needs,                       at health centers.
                                                    and enhance rural                    Time saved due to
                                                    livelihoods                           access to water
                                                    through improved                      source.
                                                    watershed                            Rural household (HH)
                                                    management.                           provided with access
                                                                                          to improved water
                                                                                          supply.
                                                                                         Rural HH provided with
                                                                                          access to improved
                                                                                          ventilated latrines.
                                                                                         Rural water points
                                                                                          constructed.
                                                                                         Number of new latrines
                                                                                          built.
                                                                                         Urban HH with access to
                                                                                          potable water supply.
                                                                                         Number of enterprises
                                                                                          connected to water
                                                                                          network.
                                                                                         Households connected to
                                                                                          improved water
                                                                                          network.
                                                                                         Cubic meters of treated
                                                                                          water from metolong
                                                                                          dam delivered through
                                                                                          a conveyance system to
                                                                                          Water and Sewerage
                                                                                          Authority (WASA).
                                                                                         Value of water
                                                                                          treatment contract
                                                                                          works award.

[[Page 47852]]

 
                                                                                         Value of conveyance
                                                                                          system contract work
                                                                                          award.
                                                                                         Species population.
                                                                                         Livestock grazing per
                                                                                          area.
                                                                                         Area put under
                                                                                          conservation.
Health Project..................     $122,398,000  Increase access to        $5,594,923  People with HIV still
                                                    life-extending ART                    alive 12 months after
                                                    and essential                         initiation of
                                                    health services by                    treatment.
                                                    providing a                          TB notification (per
                                                    sustainable                           100,000 pop.).
                                                    delivery platform.                   Proportion of blood
                                                                                          units collected
                                                                                          annually.
                                                                                         Deliveries conducted in
                                                                                          the health centers.
                                                                                         Immunization coverage
                                                                                          rate.
                                                                                         Number of Health
                                                                                          Centers (H/C)
                                                                                          constructed and fully
                                                                                          equipped.
                                                                                         Value of contract works
                                                                                          for health center
                                                                                          construction.
                                                                                         Percentage of contract
                                                                                          works for health
                                                                                          center construction
                                                                                          disbursed.
                                                                                         Percentage of contract
                                                                                          works for Botshalo
                                                                                          Complex disbursed.
                                                                                         Percentage of contract
                                                                                          works for Out-Patient
                                                                                          Department (OPD)
                                                                                          Centers disbursed.
                                                                                         Percentage of HSS
                                                                                          Contract disbursed.
                                                                                         Proportion of People
                                                                                          Living With AIDS
                                                                                          (PLWA) receiving
                                                                                          Antiretroviral
                                                                                          treatment (ARV) (by
                                                                                          age and sex).
                                                                                         Referred tests from
                                                                                          central laboratory per
                                                                                          year by types
                                                                                          (number).
Private Sector Development            $36,470,318  Stimulate                 $3,190,732  Average time (days)
 Project.                                           investment by                         required to enforce a
                                                    improving access                      contract.
                                                    to credit,                           Pending commercial
                                                    reducing                              cases.
                                                    transaction costs                    Cases filed at the
                                                    and increasing the                    commercial court.
                                                    participation of                     Value of commercial
                                                    women in the                          cases.
                                                    economy.                             Judicial staff trained.
                                                                                         Administrative and
                                                                                          clerical staff
                                                                                          trained.
                                                                                         Awareness campaigns.
                                                                                         Portfolio of loans.
                                                                                         Loan processing time.
                                                                                         Bank accounts.
                                                                                         Paper-based payments.
                                                                                         Electronic payments.
                                                                                         Value of contract
                                                                                          services signed.
                                                                                         Debit/smart cards
                                                                                          issued.
                                                                                         Mortgage bonds
                                                                                          registered.
                                                                                         Value of registered
                                                                                          mortgage bonds.
                                                                                         New land disputes
                                                                                          brought to the Land
                                                                                          Tribunal and Courts of
                                                                                          Law.
                                                                                         Time to complete a land
                                                                                          transaction.
                                                                                         Time to complete
                                                                                          transfer of land
                                                                                          rights.
                                                                                         Land transactions
                                                                                          recorded.
                                                                                         Land parcels
                                                                                          formalized.
                                                                                         Number of land
                                                                                          administration
                                                                                          personnel trained.
                                                                                         Land Act adopted.
                                                                                         People trained on
                                                                                          gender equality and
                                                                                          economic rights.
                                                                                         ID cards issued.
                                                                                         Population registered
                                                                                          in the national
                                                                                          database.
Program Administration* and           $39,654,682  ...................      $12,059,494
 Control, Monitoring and
 Evaluation.
Pending Subsequent Report**.....  ...............  ...................         $150,871
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objectives       disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                      Country: Morocco Year: 2010 Quarter 2 Total Obligation: $697,500,000
        Entity to which the assistance is provided: MCA Morocco Total Quarterly Disbursement: $12,316,461
----------------------------------------------------------------------------------------------------------------
Fruit Tree Productivity.........     $300,896,445  Reduce volatility        $15,609,252  Total annual volume of
                                                    of agricultural                       production of dates
                                                    production and                        and olives.
                                                    increase volume of                   Cropped area covered by
                                                    fruit agricultural                    olive trees.
                                                    production.                          Survival rate of newly
                                                                                          planted olive trees
                                                                                          after 2 years project-
                                                                                          supported
                                                                                          establishment period.
                                                                                         Yield of rehabilitated
                                                                                          olive trees.
                                                                                         Cropped area covered by
                                                                                          date trees.

[[Page 47853]]

 
                                                                                         Yield of rehabilitated
                                                                                          date palms.
Small Scale Fisheries...........     $116,168,027  Improve quality of        $2,492,975  State of fish stock.
                                                    fish moving                          Domestic fish
                                                    through domestic                      consumption level.
                                                    channels and                         Fisherman net revenue.
                                                    assure the                           Average fisherman sales
                                                    sustainable use of                    price at Point de
                                                    fishing resources.                    D[eacute]barquement
                                                                                          Am[eacute]nag[eacute]s
                                                                                          (PDA).
                                                                                         Volume sold at
                                                                                          wholesale markets.
                                                                                         Fish sale price.
                                                                                         Average sales price.
                                                                                         Volume of sales among
                                                                                          mobile fish vendors.
Artisan and Fez Medina..........     $111,873,858  Increase value              $637,900  Average revenue of
                                                    added to tourism                      potters receiving
                                                    and artisan                           Artisan Production
                                                    sectors.                              Activity.
                                                                                         Employment and wages
                                                                                          among project
                                                                                          graduates.
                                                                                         Tourist arrivals.
                                                                                         Artisan profits
                                                                                          (artisans engaged in
                                                                                          product finishing and
                                                                                          points of sale).
                                                                                         Employment created.
                                                                                         Small and Medium
                                                                                          Enterprises (SME)
                                                                                          value added.
Financial Services..............      $46,200,000  Increase supply and      $12,974,091  Gross loan portfolio
                                                    decrease costs of                     outstanding of
                                                    financial services                    microcredit
                                                    available to                          associations.
                                                    microenterprises.                    Portfolio at risk >30
                                                                                          days ratio.
                                                                                         Operating expense
                                                                                          ratio.
Enterprise Support..............      $33,850,000  Improved survival         $2,588,790  Average annual sales of
                                                    rate of new SMEs                      participating
                                                    and INDH-funded                       businesses.
                                                    income generating                    Survival rate of
                                                    activities;                           participating
                                                    increased revenue                     businesses.
                                                    for new SMEs and
                                                    INDH-funded income
                                                    generating
                                                    activities.
Program Administration* and           $88,511,670  ...................      $12,828,073
 Control, Monitoring and
 Evaluation.
Pending Subsequent Report**.....  ...............  ...................         $173,509
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objectives       disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                      Country: Tanzania Year: 2010 Quarter 2 Total Obligation: $698,136,000
        Entity to which the assistance is provided: MCA Tanzania Total Quarterly Disbursement: $3,562,670
----------------------------------------------------------------------------------------------------------------
Energy Sector...................     $206,042,428  Increase value            $4,382,035  New power customers.
                                                    added to                             Energy generation--
                                                    businesses.                           Kigoma.
                                                                                         Transmission capacity.
                                                                                         Percentage disbursed
                                                                                          for design and
                                                                                          supervision contract
                                                                                          Consulting Engineer
                                                                                          (CE) year 1 budgeted.
Transport Sector................     $368,847,428  Increase cash crop        $3,811,282  International roughness
                                                    revenue and                           index (Tunduma, Tanga,
                                                    aggregate visitor                     Nantumbo, Peramiho).
                                                    spending.                            Average annual daily
                                                                                          traffic (Tunduma,
                                                                                          Tanga, Nantumbo,
                                                                                          Peramiho).
                                                                                         Kilometers upgraded/
                                                                                          completed (Tunduma,
                                                                                          Tanga, Nantumbo,
                                                                                          Peramiho).
                                                                                         Percent disbursed on
                                                                                          construction works
                                                                                          (Tunduma, Tanga,
                                                                                          Nantumbo, Peramiho).
                                                                                         Signed contracts for
                                                                                          construction works
                                                                                          (Tunduma, Tanga,
                                                                                          Nantumbo, Peramiho).
                                                                                         Percent disbursed for
                                                                                          feasibility and/or
                                                                                          design studies
                                                                                          (Tunduma, Tanga,
                                                                                          Nantumbo, Peramiho).
                                                                                         Signed contracts for
                                                                                          feasibility and/or
                                                                                          design studies
                                                                                          (Tunduma, Tanga,
                                                                                          Nantumbo, Peramiho).
                                                                                         Kilometers of roads
                                                                                          under design (Tunduma,
                                                                                          Tanga, Nantumbo,
                                                                                          Peramiho).
                                                                                         International roughness
                                                                                          index (Zanzibar Rural
                                                                                          Roads).
                                                                                         Average annual daily
                                                                                          traffic (Zanzibar
                                                                                          Rural Roads).
                                                                                         Kilometers upgraded/
                                                                                          completed (Zanzibar
                                                                                          Rural Roads).
                                                                                         Percent disbursed on
                                                                                          construction works
                                                                                          (Zanzibar Rural
                                                                                          Roads).

[[Page 47854]]

 
                                                                                         Signed contracts for
                                                                                          construction works
                                                                                          (Zanzibar Rural
                                                                                          Roads).
                                                                                         Percent disbursed for
                                                                                          feasibility and/or
                                                                                          design studies
                                                                                          (Zanzibar Rural
                                                                                          Roads).
                                                                                         Signed contracts for
                                                                                          feasibility and/or
                                                                                          design studies
                                                                                          (Zanzibar Rural
                                                                                          Roads).
                                                                                         Kilometers of roads
                                                                                          under design (Zanzibar
                                                                                          Rural Roads).
                                                                                         Passenger arrivals.
                                                                                         Percentage of upgrade
                                                                                          complete (airport).
                                                                                         Percent disbursed on
                                                                                          construction works
                                                                                          (airport).
                                                                                         Signed contracts for
                                                                                          construction works
                                                                                          (airport).
Water Sector Project............      $65,692,143  Increase investment       $1,619,625  Prevalence of diarrhea
                                                    in human and                          (Dar es Salaam).
                                                    physical capital                     Prevalence of diarrhea
                                                    and to reduce the                     (Morogoro).
                                                    prevalence of                        Prevalence of cholera
                                                    water-related                         (Dar es Salaam).
                                                    disease.                             Prevalence of cholera
                                                                                          (Morogoro).
                                                                                         Volume of individual
                                                                                          water consumption (Dar
                                                                                          es Salaam).
                                                                                         Volume of individual
                                                                                          water consumption
                                                                                          (Morogoro).
                                                                                         Number of households
                                                                                          using improved source
                                                                                          for drinking water
                                                                                          (Dar es Salaam).
                                                                                         Number of households
                                                                                          using improved source
                                                                                          for drinking water
                                                                                          (Morogoro).
                                                                                         Number of businesses
                                                                                          using improved water
                                                                                          source (Dar es
                                                                                          Salaam).
                                                                                         Number of businesses
                                                                                          using improved water
                                                                                          source (Morogoro).
                                                                                         Volume of water
                                                                                          produced (Lower Ruvu).
                                                                                         Volume of water
                                                                                          produced (Morogoro).
                                                                                         Volume of non-revenue
                                                                                          water (Dar es Salaam).
                                                                                         Operations and
                                                                                          maintenance cost
                                                                                          recovery ratio (Dar es
                                                                                          Salaam).
                                                                                         Operations and
                                                                                          maintenance cost
                                                                                          recovery ratio
                                                                                          (Morogoro).
                                                                                         Percent disbursed on
                                                                                          construction works.
                                                                                         Signed contracts for
                                                                                          construction works.
Program Administration* and           $57,554,001  ...................       $4,742,878
 Control, Monitoring and
 Evaluation.
Pending Subsequent Report**.....  ...............  ...................         $206,197
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objectives       disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                    Country: Burkina Faso Year: 2010 Quarter 2 Total Obligation: $478,943,569
      Entity to which the assistance is provided: MCA Burkina Faso Total Quarterly Disbursement: $2,203,660
----------------------------------------------------------------------------------------------------------------
Roads Project...................     $194,130,681  Enhance access to            $30,195  To Be Determined (TBD).
                                                    markets through
                                                    investments in the
                                                    road network.
Rural Land Governance Project...      $59,934,614  Increase investment         $995,715  TBD.
                                                    in land and rural
                                                    productivity
                                                    through improved
                                                    land tenure
                                                    security and land
                                                    management.
Agriculture Development Project.     $141,910,059  Expand the                   $72,153  TBD.
                                                    productive use of
                                                    land in order to
                                                    increase the
                                                    volume and value
                                                    of agricultural
                                                    production in
                                                    project zones.
Bright 2 Schools Project........      $26,829,669  Increase primary         $26,829,669  TBD.
                                                    school completion
                                                    rates.
Program Administration* and           $56,138,546  ...................       $8,428,572
 Control, Monitoring and
 Evaluation.
Pending Subsequent Report**.....  ...............  ...................          $65,145
----------------------------------------------------------------------------------------------------------------


[[Page 47855]]


 
                                                                           Cumulative
            Projects                 Obligated          Objectives       disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                      Country: Namibia Year: 2010 Quarter 2 Total Obligation: $304,477,817
        Entity to which the assistance is provided: MCA Namibia Total Quarterly Disbursement: $1,800,085
----------------------------------------------------------------------------------------------------------------
Education Project...............     $144,976,559  Improve the                 $899,988  To Be Determined (TBD).
                                                    education sector's
                                                    effectiveness,
                                                    efficiency and
                                                    quality.
Tourism Project.................      $66,959,291  Increase incomes            $302,775  TBD.
                                                    and create
                                                    employment
                                                    opportunities by
                                                    improving the
                                                    marketing,
                                                    management and
                                                    infrastructure of
                                                    Etosha National
                                                    Park.
Agriculture Project.............      $46,965,320  Sustainably improve          $42,682  TBD.
                                                    the economic
                                                    performance and
                                                    profitability of
                                                    the livestock
                                                    sector and
                                                    increase the
                                                    volume of the
                                                    indigenous natural
                                                    products for
                                                    export.
Program Administration* and           $45,576,647  ...................       $3,977,655
 Control, Monitoring and
 Evaluation.
Pending Subsequent Report**.....  ...............  ...................       $1,071,642
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objectives       disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                       Country: Moldova Year: 2010 Quarter 2 Total Obligation: $7,970,942
            Entity to which the assistance is provided: MCA Moldova Total Quarterly Disbursement: $0
----------------------------------------------------------------------------------------------------------------
Road Rehabilitation Project.....         $800,000  ...................               $0  To Be Determined (TBD).
Transition to High Value               $6,788,251  ...................               $0  TBD.
 Agriculture.
Program Administration and               $382,691  ...................               $0  TBD.
 Monitoring and Evaluation.
----------------------------------------------------------------------------------------------------------------
* Program administration funds are used to pay items such as salaries, rent, and the cost of office equipment.
** These amounts represent disbursements made that will be allocated to individual projects in the subsequent
 quarter(s) and reported as such in subsequent quarterly report(s).
*** The obligated funds reflect a preliminary grant to Moldova for the purpose of implementing a compact. MCC
 has awarded Moldova a compact grant of $262 million which will take effect once Moldova meets certain
 conditions.
----------------------------------------------------------------------------------------------------------------
619(b) Transfer or Allocation of Funds
----------------------------------------------------------------------------------------------------------------

[FR Doc. 2010-19474 Filed 8-6-10; 8:45 am]
BILLING CODE 9211-03-P