[Federal Register Volume 75, Number 152 (Monday, August 9, 2010)] [Notices] [Pages 47839-47855] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 2010-19474] ======================================================================= ----------------------------------------------------------------------- MILLENNIUM CHALLENGE CORPORATION [MCC 10-08] Notice of Quarterly Report (January 1, 2010-March 31, 2010) AGENCY: Millennium Challenge Corporation. SUMMARY: The Millennium Challenge Corporation (MCC) is reporting for the quarter January 1, 2010 through March 31, 2010, on assistance provided under section 605 of the Millennium Challenge Act of 2003 (22 U.S.C. 7701 et seq.), as amended (the Act), and on transfers or allocations of funds to other federal agencies under section 619(b) of the Act. The following report will be made available to the public by publication in the Federal Register and on the Internet Web site of the MCC (http://www.mcc.gov) in accordance with section 612(b) of the Act. Dated: July 6, 2010. T. Charles Cooper, Vice President, Congressional and Public Affairs, Millennium Challenge Corporation. Assistance provided Under Section 605 ---------------------------------------------------------------------------------------------------------------- Cumulative Projects Obligated Objectives disbursements Measures ---------------------------------------------------------------------------------------------------------------- Country: Madagascar Year: 2010 Quarter 2 Total Obligation: $87,998,166 Entity to which the assistance is provided: MCA Madagascar Total Quarterly Disbursement: -$371,448 ---------------------------------------------------------------------------------------------------------------- Land Tenure Project............. $30,123,098 Increase Land $29,303,833 Area secured with land Titling and certificates or titles Security. in the Zones. Proportion of the population informed about land tenure reforms in the Zones. Legal and regulatory reforms adopted. Number of land documents inventoried in the Zones and Antananarivo. [[Page 47840]] Number of land documents restored in the Zones and Antananarivo. Number of land documents digitized in the Zones and Antananarivo. Average time for Land Services Offices to issue a duplicate copy of a title. Average cost to a user to obtain a duplicate copy of a title from the Land Services Offices. Number of land certificates delivered in the Zones during the period. Number of new guichets fonciers operating in the Zones. The 256 Plan Local d'Occupation Foncier-- Local Plan of Land Occupation (PLOFs) are completed. Finance Project................. $25,937,781 Increase $23,535,169 Volume of funds Competition in the processed annually by Financial Sector. the national payment system. The components necessary to implement the national payment system are operational: Network equipment and integrator, real time gross settlement system (RTGS), retail payment clearing system, telecommunication facilities. Number of accountants and financial experts registered to become Certified Public Accountant (CPA). Percent of Micro- Finance Institution (MFI) loans recorded in the Central Bank database. Agricultural Business Investment $13,687,196 Improve $13,581,752 Number of farmers that Project. Agricultural adopt new technologies Projection or engage in higher Technologies and value production. Market Capacity in Number of enterprises Rural Areas. that adopt new technologies or engage in higher value production. Number of farmers receiving technical assistance. Number of farmers employing technical assistance. Number of businesses receiving technical assistance. Number of Minist[egrave]re de l'Agriculture, de l'Elevage et de la P[ecirc]che--Ministry of Agriculture, Livestock, and Fishing (MAEP) agents trained in marketing and investment promotion. Zones identified and description of beneficiaries within each zone submitted. Number of people receiving information from Agricultural Business Center (ABCs) on business opportunities. Zonal investment strategies for the Zones are developed. Number of ABC clients who register as formal enterprises, cooperatives, or associations. Number of marketing contracts of ABC clients. Program Administration* and $18,250,091 ................... $17,577,500 Control, Monitoring and Evaluation. Pending subsequent reports**.... ............... ................... $1,368,813 ---------------------------------------------------------------------------------------------------------------- * Program administration funds are used to pay items such as salaries, rent, and the cost of office equipment. ** These amounts represent disbursements made that will be allocated to individual projects in the subsequent quarter(s) and reported as such in subsequent quarterly report(s). *** Negative obligations for 2010 resulted from the deobligation of Nicaragua, Madagascar and Honduras. Senegal and Moldova are expected to be obligated in 2010. ---------------------------------------------------------------------------------------------------------------- [[Page 47841]] Cumulative Projects Obligated Objectives disbursements Measures ---------------------------------------------------------------------------------------------------------------- Country: Honduras Year: 2010 Quarter 2 Total Obligation: $205,000,000 Entity to which the assistance is provided: MCA Honduras Total Quarterly Disbursement: $20,203,531 ---------------------------------------------------------------------------------------------------------------- Rural Development Project....... $68,327,183 Increase the $50,641,703 Number of program productivity and farmers harvesting business skills of high-value farmers who horticulture crops. operate small and Number of hectares medium-size farms harvesting high-value and their horticulture crops. employees. Number of business plans prepared by program farmers with assistance from the implementing entity. Total value of net sales. Total number of recruited farmers receiving technical assistance. Value of loans disbursed (disaggregated by trust fund, leveraged from trust fund, and institutions receiving technical assistance from ACDI-VOCA). Number of loans disbursed (disaggregated by trust fund, leveraged from trust fund, and institutions receiving technical assistance from ACDI-VOCA). Percentage of loan portfolio at risk (disaggregated by trust fund and institutions receiving technical assistance from ACDI-VOCA). Funds lent from the trust fund to financial intermediaries through lines of credit. Number of hectares under irrigation. Number of beneficial biological control agents developed for use by program farmers or other farmers for pilot testing. Number of improved coffee hybrids available for cloning. Number of farmers connected to the community irrigation system. Number of certified deliverables across all agricultural public goods grant. Transportation Project.......... $119,237,242 Reduce $90,472,182 Freight shipment cost transportation from Tegucigalpa to costs between Puerto Cortes. targeted Average annual daily production centers traffic volume--CA-5. and national, International roughness regional and index (IRI)--CA-5. global markets. Kilometers of road upgraded--CA-5. Percent of contracted road works disbursed-- CA-5. Average annual daily traffic volume-- secondary roads. International roughness index (IRI)--secondary roads. Kilometers of road upgraded--secondary roads. Percent of contracted road works disbursed-- secondary roads. Average annual daily traffic volume--rural roads. Average speed--rural roads. Kilometers of road upgraded--rural roads. Percent of contracted road works disbursed-- rural roads. Signed contracts for feasibility and/or design studies. Percent of contracted studies disbursed. Kilometers (km) of roads under design. Signed contracts for roads works. Kilometers (km) of roads under works contracts. Program Administration* and $17,435,575 ................... $9,715,941 Control, Monitoring and Evaluation. Pending subsequent reports**.... ............... ................... $1,521,767 ---------------------------------------------------------------------------------------------------------------- [[Page 47842]] Cumulative Projects Obligated Objectives disbursements Measures ---------------------------------------------------------------------------------------------------------------- Country: Cape Verde Year: 2010 Quarter 2 Total Obligation: $110,078,488 Entity to which the assistance is provided: MCA Cape Verde Total Quarterly Disbursement: $6,855,235 ---------------------------------------------------------------------------------------------------------------- Watershed and Agricultural $11,351,549 Increase $8,732,927 Productivity: Support. agricultural Horticulture, Paul production in watershed. three targeted Productivity: watershed areas on Horticulture, Faja three islands. watershed. Productivity: Horticulture, Mosteiros watershed. Number of farmers adopting drip irrigation. Area irrigated with drip irrigation. Percent of contracted irrigation works disbursed (cumulative). Reservoirs constructed. Number of farmers that have completed training in at least 3 of 5 core agricultural disciplines. Infrastructure Improvement...... $83,160,208 Increase $55,788,977 Travel time ratio: integration of the percentage of internal market beneficiary population and reduce further than 30 transportation minutes from nearest costs. market. Kilometers of roads rehabilitated. Percent of contracted Santiago Roads works disbursed (cumulative). Percent of contracted Santo Antao Bridge works disbursed (cumulative). Kilometers (km) of roads under design. Signed contracts for roads works. Kilometers (km) of roads under works contracts. Port of Praia: percent of contracted port works disbursed (cumulative). Cargo village: percent of works completed. Quay 2 improvements: percent of works completed. Access road: percent of works completed. Private Sector Development...... $2,081,223 Spur private sector $1,297,409 Micro-Finance development on all Institution (MFI) islands through recovery rate, increased adjusted. investment in the MFI portfolio at risk, priority sectors adjusted. and through Ratio of MFIs financial sector operationally self- reform. sufficient. Program Administration* and $13,485,508 ................... $9,836,845 Control, Monitoring and Evaluation. Pending subsequent reports**.... ............... ................... $337,480 ---------------------------------------------------------------------------------------------------------------- Cumulative Projects Obligated Objectives disbursements Measures ---------------------------------------------------------------------------------------------------------------- Country: Nicaragua Year: 2010 Quarter 2 Total Obligation: $113,546,407 Entity to which the assistance is provided: MCA Nicaragua Total Quarterly Disbursement: $5,858,883 ---------------------------------------------------------------------------------------------------------------- Property Regularization Project. $7,205,205 Increase Investment $5,586,254 Automated database of by strengthening registry and cadastre property rights. installed in the 10 municipalities of Leon. Value of land, urban. Value of land, rural. Time to conduct a land transaction. Number of additional parcels with a registered title, urban. Number of additional parcels with a registered title, urban. Number of protected areas demarcated. Area covered by cadastral mapping. Cost to conduct a land transaction. Transportation Project.......... $57,999,999 Reduce $51,794,412 Annual Average daily transportation traffic volume: N1 costs between Leon Section R1. and Chinandega and Annual Average daily national, regional traffic volume: N1 and global markets. Section R2. Annual Average daily traffic volume: Port Sandino (S13). Annual Average daily traffic volume: Villanueva-Guasaule Annual. Average daily traffic volume: Somotillo- Cinco Pinos (S1). Annual average daily traffic volume: Le[oacute]n-Poneloya- Las Pe[ntilde]itas. International Roughness Index: N-I Section R1. [[Page 47843]] International Roughness Index: N-I Section R2. International Roughness Index: Port Sandino (S13. International roughness index: Villanueva- Guasaule. International roughness index: Somotillo-Cinco Pinos. International roughness index: Le[oacute]n- Poneloya-Las Pe[ntilde]itas. Kilometers of NI upgraded: R1 and R2 and S13. Kilometers of NI upgraded: Villanueva- Guasaule. Kilometers of S1 road upgraded. Kilometers of S9 road upgraded. Kilometers of designed primary roads (including N-I/Puerto Sandino and V-G). Kilometers of designed secondary roads. Rural Development Project....... $32,897,500 Increase the value $23,425,961 Number of beneficiaries added of farms and with business plans enterprises in the prepared with region. assistance from the Rural Development Business Project. Numbers of manzanas (1 Manzana = 1.7 hectares), by sector, harvesting higher- value crops. Number of manzanas of beneficiaries of the program that harvest higher-value crops with irrigation or commercial reforestation under Improvement of Water Supply Activities. Number of beneficiaries implementing business plans. Average increase in income of beneficiaries due to program. Program Administration*, Due $15,443,703 ................... $11,414,813 Diligence, Monitoring and Evaluation. Pending subsequent reports**.... ............... ................... $1,459,801 ---------------------------------------------------------------------------------------------------------------- Cumulative Projects Obligated Objectives disbursements Measures ---------------------------------------------------------------------------------------------------------------- Country: Georgia Year: 2010 Quarter 2 Total Obligation: $395,300,000 Entity to which the assistance is provided: MCA Georgia Total Quarterly Disbursement: $12,569,994 ---------------------------------------------------------------------------------------------------------------- Regional Infrastructure $310,750,000 Key Regional $146,760,084 Household savings from Rehabilitation. Infrastructure Infrastructure Rehabilitated. Rehabilitation Activities. Savings in vehicle operating costs (VOC). International roughness index (IRI). Annual average daily traffic (AADT). Travel Time. Kilometers of road paved. Percent of contracted works disbursed. Signed contracts for feasibility and/or design studies. Percent of contracted studies disbursed. Kilometers of roads under design. Signed contracts for road works. Kilometers of toads under works contracts. Sites rehabilitated (phases I, II, III)-- pipeline. Construction works completed (phase II)-- pipeline. Savings in household expenditures for all subprojects. Population Served by all subprojects. Subprojects completed. Value of project grant agreements signed. Value of project works and goods contracts Signed. Subprojects with works initiated. Regional Enterprise Development. $52,530,800 Enterprises in $38,981,083 Jobs Created by Regions Developed. Agribusiness Development Activity (ADA) and by Georgia Regional Development Fund (GRDF). Household net income-- ADA and GRDF. Jobs created--ADA. Firm income ADA. Household net income-- ADA. Beneficiaries (direct and indirect)--ADA. Grant agreements signed--ADA. [[Page 47844]] Increase in gross revenues of portfolio companies (PC). Increase in portfolio company employees. Increase in wages paid to the portfolio company employees. Cumulative number of Portfolio companies. Funds disbursed to the portfolio companies. Program Administration*, Due $32,019,200 ................... $17,670,271 Diligence, Monitoring and Evaluation. Pending subsequent reports**.... ............... ................... $239,930 ---------------------------------------------------------------------------------------------------------------- November 2008, MCC and the Georgian government signed a Compact amendment making up to $100 million of additional funds available to the Millennium Challenge Georgia Fund. These funds will be used to complete works in the Roads, Regional Infrastructure Development, and Energy Rehabilitation Projects contemplated by the original Compact. The amendment was ratified by the Georgian parliament and entered into force on January 30, 2009. ---------------------------------------------------------------------------------------------------------------- Cumulative Projects Obligated Objectives disbursements Measures ---------------------------------------------------------------------------------------------------------------- Country: Vanuatu Year: 2010 Quarter 2 Total Obligation: $65,690,000 Entity to which the assistance is provided: MCA Vanuatu Total Quarterly Disbursement: $3,126,997 ---------------------------------------------------------------------------------------------------------------- Transportation Infrastructure $60,162,579 Facilitate $45,219,525 Number of international Project. transportation to tourists--Efate. increase tourism Number of international and business tourists--Santo. development. Number of room nights occupied--Efate. Number of room nights occupied--Santo. Average annual daily traffic--Efate. Average annual daily traffic--Santo. Kilometers of road upgraded--Efate. Kilometers of roads upgraded--Santo. Signed contracts for feasibility and/or design studies. Percent of contracted studies disbursed. Kilometers (km) of roads under design. Signed contracts for roads works. Kilometers (km) of roads under works contracts. Percent of contracted roads works disbursed. Program Administration*, Due $5,527,421 ................... $3,029,668 Diligence, Monitoring and Evaluation. Pending subsequent reports**.... ............... ................... $40,780 ---------------------------------------------------------------------------------------------------------------- Cumulative Projects Obligated Objectives disbursements Measures ---------------------------------------------------------------------------------------------------------------- Country: Armenia Year: 2010 Quarter 2 Total Obligation: $235,650,000 Entity to which the assistance is provided: MCA Armenia Total Quarterly Disbursement: $9,068,556 ---------------------------------------------------------------------------------------------------------------- Irrigated Agriculture Project $152,709,208 Increase $45,101,470 Recovery of Water User (Agriculture and Water). agricultural Associations (WUA) productivity and operations and Improve and maintenance cost by Quality of water charges. Irrigation. Primary canals rehabilitated. Tertiary canals rehabilitated. Percent of contracted irrigation works disbursed. Value of signed contracts for irrigation works. Number of farmers using better on-farm water management. Number of farmers trained. Number of agribusinesses assisted. Value of agricultural loans to farmers/ agribusinesses. Rural Road Rehabilitation $67,100,000 Better access to $7,870,944 Average annual daily Project. economic and traffic. social International roughness infrastructure. index. Kilometers of roads rehabilitated. Percent of contracted roads works disbursed. Signed contracts for roads works. Percent of contracted studies disbursed. kilometers (km) of roads under design. Signed contracts for feasibility and/or design studies. Kilometers (km) of roads under works contracts. [[Page 47845]] Program Administration*, Due $15,840,792 ................... $9,116,839 Diligence, Monitoring and Evaluation. Pending subsequent reports**.... ............... ................... $1,007,199 ---------------------------------------------------------------------------------------------------------------- Cumulative Projects Obligated Objectives disbursements Measures ---------------------------------------------------------------------------------------------------------------- Country: Benin Year: 2010 Quarter 2 Total Obligation: $307,298,040 Entity to which the assistance is provided: MCA Benin Total Quarterly Disbursement: $8,344,844 ---------------------------------------------------------------------------------------------------------------- Access to Financial Services.... $19,649,999 Expand Access to $3,943,254 Volume of credits Financial Services. granted by the Micro- Finance Institutions (MFI). Volume of saving collected by the Micro- Finance Institutions. Average portfolio at risk >90 days of microfinance institutions at the national level. Operational self- sufficiency of MFIs at the national level. Average time required by Cellule de Surveillance des Structures Financi[egrave]res D[eacute]centralis[eac ute]es (CSSFD) in treating MFI applications. Number of institutions receiving grants through the Facility. Second call for proposal for grants launched. Number of MFIs inspected by CSSFD. Access to Justice............... $34,270,000 Improved Ability of $2,474,444 Average time to enforce Justice System to a contract. Enforce Contracts Percent of firms and Reconcile reporting confidence Claims. in the judicial system. Number of cases processed at Arbitration Center per year. Number of Information, Education and Communication Campaign (IEC) sessions hosted by Chamber of Commerce (CAMeC). Passage of new legal codes. Average time required for Tribunaux de premiere instance-- arbitration centers and courts of first instance (TPI) to reach a final decision on a case. Average time required for Court of Appeals to reach a final decision on a case. Percent of cases resolved in TPI per year. Percent of cases resolved in Court of Appeals per year. Number of Court inspections per year. Number of Court employees trained. Number of beneficiaries of legal aid services. Complete construction on 9 new court houses. Average time required to register a business (soci[eacute]t[eacute] ). Average time required to register a business (sole proprietorship). Number of businesses accessing CAMEC service. Business registration center (CFE) information and outreach campaign executed throughout Benin. Access to Land.................. $36,020,000 Strengthen property $13,378,640 Total value of rights and investment in targeted increase urban land parcels. investment in Total value of rural and urban investment in targeted land. rural land parcels. Average cost required to obtain a new land title through on demand process. Average cost required to convert occupancy permit to land title through systematic process. Percentage of respondents perceiving land security in the Occupancy Permit (PH) into Land titles (TF) or Rural Land Plan Foncier Rural (PFR) areas. Number of new land disputes reported by commune heads. Seven studies complete. Land code texts adopted (laws, decrees and land code). [[Page 47846]] Value ($) of equipment purchased. Number of land certificates issued within MCA-Benin implementation. Number of habitation permits converted to land titles. Number of Continuously Operating Reference (CORS) stations installed. Number of public and private surveyors trained. Number of communes with new cadastres. Land market information system established. Access to Markets............... $169,447,001 Improve Access to $32,086,625 Volume of merchandise Markets through traffic through the Improvements to Port Autonome de the Port of Cotonou. Cotonou. Bulk ship carriers waiting times at the port. Container ship waiting times at the port. Port design-build contract awarded. Port crime levels (number of thefts). Internal port circulation time. Average time to clear customs. Execution rate of training plan. Port meets-- international port security standards (ISPS). Public consultation completed (3). Environmental permits issued. Program Administration*, Due $47,911,040 ................... $22,482,370 Diligence, Monitoring and Evaluation. Pending subsequent reports**.... ............... ................... $283,061 ---------------------------------------------------------------------------------------------------------------- Cumulative Projects Obligated Objectives disbursements Measures ---------------------------------------------------------------------------------------------------------------- Country: Ghana Year: 2010 Quarter 2 Total Obligation: $547,009,000 Entity to which the assistance is provided: MCA Ghana Total Quarterly Disbursement: $21,933,254 ---------------------------------------------------------------------------------------------------------------- Agriculture Project............. $227,899,382 Enhance $73,381,076 Number of farmers Profitability of trained. cultivation, Number of services to agribusinesses agriculture and assisted. product handling Number of hectares in support of the under production with expansion of MCC support. commercial Value of agricultural agriculture among loans to farmers/ groups of agribusinesses. smallholder farms. Value of signed contracts for feasibility and/or design studies (irrigation). Percent of contracted (design/feasibility) studies complete (irrigation). Value of signed contracts for irrigation works (irrigation). Percent of contracted irrigation works disbursed. Percent of people aware of their land rights. Total number of parcels surveyed in the Pilot Land Registration Areas (PLRAs). Volume of products passing through post- harvest treatment. Rural Development Project....... $89,361,539 Strengthen the $14,660,025 Number of students rural institutions enrolled in schools that provide affected by Education services Facilities Sub- complementary to, Activity. and supportive of, Number of schools agricultural and rehabilitated. agriculture Number of basic school business blocks constructed to development. Ministry of Education (MOE) construction standards. Number of schools designed and due diligence completed. Distance to collect water. Time to collect water. Incidence of guinea worm. Average number of days lost due to guinea worm. Number of people affected by Water and Sanitation Facilities Sub-Activity. Number of stand-alone boreholes/wells/ nonconventional water systems constructed/ rehabilitated. Number of small-town water systems constructed. Number of pipe extension projects constructed. Number of stand-alone boreholes/wells/non- conventional water systems identified and due diligence performed for rehabilitation/ construction. [[Page 47847]] Number of small-town water systems designed and due diligence completed for construction. Number of pipe extension projects designed and due diligence completed for construction. Number of agricultural processing plants in target districts with electricity due to Rural Electrification Sub-Activity. Number of electricity projects identified and due diligence completed. Transportation.................. $174,285,120 Reduce the $35,543,256 International roughness transportation index. costs affecting Annualized average agriculture daily traffic. commerce at sub- Kilometers of road regional levels. completed. Percent of contracted road works disbursed. Value of signed contracts for road works. Kilometers of road designed. Percent of contracted design/feasibility studies completed. Value of signed contracts for feasibility and/or design studies. Travel time for walk-on passengers. Travel time for small vehicles. Travel time for trucks. Annual average daily traffic (vehicles). Annual average daily traffic (passengers). Landing stages rehabilitated. Ferry terminal upgraded. Rehabilitation of Akosombo Floating Dock completed. Percent of contracted work disbursed landings and terminals. Value of signed contracts for works: Ferry and floating dock. Value of signed contracts for works: Landings and terminals. Program Administration*, Due $55,462,959 ................... $21,548,749 Diligence, Monitoring and Evaluation. Pending subsequent reports**.... ............... ................... -$1,755 ---------------------------------------------------------------------------------------------------------------- Cumulative Projects Obligated Objectives disbursements Measures ---------------------------------------------------------------------------------------------------------------- Country: El Salvador Year: 2010 Quarter 2 Total Obligation: $460,940,000 Entity to which the assistance is provided: MCA El Salvador Total Quarterly Disbursement: $26,132,618 ---------------------------------------------------------------------------------------------------------------- Human Development Project....... $95,073,000 Increase human and $15,830,730 Employment rate of physical capital graduates of middle of residents of technical schools. the Northern Zone Graduation rates of to take advantage middle technical of employment and schools. business Middle technical opportunities. schools remodeled and equipped. Scholarships granted to students of middle technical schools. Students of non-formal training. Cost of water. Time collecting water. Households benefiting with water solutions built. Potable water and basic sanitation systems with construction contracts signed. Cost of electricity. Electricity consumption. Households benefiting with a connection to the electricity network. Household benefiting with the installation of isolated solar systems. Kilometers of new electrical lines with construction contracts signed. Population benefiting from strategic infrastructure. Community Infrastructure Works with Construction Contracts Signed. Productive Development Project.. $87,466,000 Increase production $21,919,506 Number of hectares and employment in under production with the Northern Zone. MCC support. Number of farmers trained. [[Page 47848]] Value of agricultural loans to farmers/ agribusinesses. Number of agribusinesses assisted. Connectivity Project............ $233,559,999 Reduce travel cost $41,423,394 Average annual daily and time within traffic. the Northern Zone, International roughness with the rest of index. the country, and Kilometers of roads within the region. rehabilitated. Kilometers of roads under works contract. Signed contracts for roads works. Percent of contracted roads works disbursed. Program Administration* and $54,718,001 ................... $13,105,371 Control, Monitoring and Evaluation. Pending Subsequent Report**..... ............... ................... $0 ---------------------------------------------------------------------------------------------------------------- Cumulative Projects Obligated Objectives disbursements Measures ---------------------------------------------------------------------------------------------------------------- Country: Mali Year: 2010 Quarter 2 Total Obligation: $460,811,164 Entity to which the assistance is provided: MCA Mali Total Quarterly Disbursement: $18,557,892 ---------------------------------------------------------------------------------------------------------------- Bamako S[eacute]nou Airport $181,254,264 Establish an $11,978,769 Total wage bill of Improvement Project. independent and tourism industry. secure link to the Freight volume. regional and Employment at airport. global economy. Signature of design contract. Average number of weekly flights (arrivals). Passenger traffic (annual average). Percent works complete. Airside Infrastructure Design, and Airside Infrastructure Construction Supervision, (AIR A01) and Landside Infrastructure Design (New Terminal & Associated Works) and Landside Construction Supervision is launched. Time required for passenger processing at departures and arrivals. Passenger satisfaction level. Percent works complete. Percent of airport management and maintenance plan implemented. Airport meets Federal Aviation Administration (FAA) and International Civil Aviation Organization (ICAO) security standards. Technical assistance delivered to project. Alatona Irrigation Project...... $234,884,675 Increase the $46,189,523 Number of agricultural agricultural jobs created in production and Alatona zone. productivity in Main season rice the Alatona zone yields. of the ON. International roughness index (IRI) on the Niono-Goma Coura Route. Average daily vehicle count. Percentage works complete. Total irrigated land in the Alatona zone. Irrigation system efficiency on Alatona Canal during the rainy season and the dry season. Kilometers of road under design/ feasibility study. Value of signed contracts for road works. Kilometers of road under works contract. Percent of works completed on main system construction. Percent of contracted irrigation works disbursed for tranche 1. Value of signed contracts for irrigation works. Value of signed contracts for feasibility and/or design studies. Percent of contracted (design/feasibility) studies disbursed. Area planted by new settlers (wet season). Titles registered in the land registration office of the Alatona zone (for 5- or 10- hectare farms). Total land payments made. Total market gardens allocated in Alatona zones for the populations affected by the project (PAPs). [[Page 47849]] Decree transferring legal control of the project impact area is passed. Selection criteria for new settlers approved. Contractor implementing the ``Mapping of Agricultural and Communal Land Parcels'' contract is mobilized. School enrollment rate. Percent of Alatona population with access to drinking water. Number of schools available in the Alatona. Number of health centers available in the Alatona. Number of concessions that have been compensated. Resettlement census verified. Adoption rate of improved agriculture techniques among populations affected by the project (PAPs). Number of operational mixed cooperatives. Area planted by PAPs (wet season rice). Area planted with shallots during dry season. Number of farmers completing literacy training. Number of people completing the rice and shallot production techniques module. Number of farmers completing land titling training. Water management system design and capacity building strategy implemented. Call for proposals for the applied research grants launched. Average portfolio at risk among Alatona microfinance institutions. Average loan repayment rate of Alatona clients (farmers organizations or individual farmers). Amount of credit extended to Alatona farmers. Number of farmers accessing grant assistance for first loan from financial institutions. Financial institution partners identified (report on assessment of the financial institutions in the Office du Niger-- Office of Niger zone (ON zone)). Industrial Park Project......... $2,643,432 Develop a platform $2,637,472 Occupancy level. for industrial Average number of days activity to be required for operator located within the to connect to Airport domain. Industrial Park water and electricity services. Program Administration* and $42,028,793 ................... $18,330,983 Control, Monitoring and Evaluation. Pending Subsequent Report**..... ............... ................... $3 ---------------------------------------------------------------------------------------------------------------- Cumulative Projects Obligated Objectives disbursements Measures ---------------------------------------------------------------------------------------------------------------- Country: Mongolia Year: 2010 Quarter 2 Total Obligation: $284,902,443 Entity to which the assistance is provided: MCA Mongolia Total Quarterly Disbursement: $2,169,773 ---------------------------------------------------------------------------------------------------------------- Property Rights Project......... $22,910,728 Increase security $1,317,528 Number of studies and capitalization completed. of land assets Legal and regulatory held by lower- reforms adopted. income Mongolians, Number of landholders and increased peri- reached by public urban herder outreach efforts. productivity and Personnel Trained. incomes. Number of Buildings rehabilitated/ constructed. Value of equipment purchased. Rural hectares Mapped. Urban Parcels Mapped. Rural Hectares Formalized. Urban parcels formalized. [[Page 47850]] Rail Project.................... $188,378,000 Increase rail $369,560 Increase in gross traffic and domestic product due shipping to rail improvements. efficiency. Freight turnover. Mine traffic. Percent of wagons leased by private firms. Railway operating ratio. Customer satisfaction. Wagon time to destination. Average locomotive availability. Vocational Education Project.... $25,492,856 Increase employment $1,431,975 Rate of employment. and income among Students completing unemployed and newly designed long- underemployed term programs. Mongolians. Percent of active teachers receiving certification training. Technical and vocational education and training (TVET) legislation passed. Health Project.................. $16,969,757 Increase the $1,273,192 Diabetes and adoption of hypertension behaviors that controlled. reduce non- Percentage of cancer communicable cases diagnosed in diseases (NCDIs) early stages. among target Road and traffic safety populations and activity finalized and improved medical key interventions treatment and developed. control of NCDIs. Program Administration* and $31,151,102 ................... $7,523,502 Control, Monitoring and Evaluation. Pending subsequent reports**.... ............... ................... $43,201 ---------------------------------------------------------------------------------------------------------------- In late 2009, the MCC's Board of Directors approved the allocation of a portion of the funds originally designated for the rail project to the expansion of the health, vocational education and property right projects from the rail project, and the remaining portion to the addition of a road project. ---------------------------------------------------------------------------------------------------------------- Cumulative Projects Obligated Objectives disbursements Measures ---------------------------------------------------------------------------------------------------------------- Country: Mozambique Year: 2010 Quarter 2 Total Obligation: $506,924,053 Entity to which the assistance is provided: MCA Mozambique Total Quarterly Disbursement: $4,957,265 ---------------------------------------------------------------------------------------------------------------- Water and Sanitation Project.... $203,585,393 Increase access to $3,085,162 Time to get to non- reliable and private water source. quality water and Percent of urban sanitation population with facilities. improved water sources. Percent of urban population with improved sanitation facilities. Number of private household water connections in urban areas. Number of private household sanitation connections in urban areas. Number of standpipes in urban areas. Final detailed design for 5 towns submitted. Final detailed design for 3 cities submitted. Percent of rural population with access to improved water sources. Number of rural water points constructed. Final design report 1 (400 WP) submitted. Final design report II (200 Water points) submitted. Implementing agreement signed with the Administration for Water and Sanitation (AIAS) Infrastructure. Change in international roughness index (IRI). Road Rehabilitation Project..... $176,307,480 Increase access to $1,339,678 Average annual daily productive traffic volume. resources and Kilometers of road markets. rehabilitated. Kilometers of road under design. Percent of Namialo-Rio L[uacute]rio Road-- Metoro feasibility, design, and supervision contract disbursed. Percent of Rio Ligonha- Nampula feasibility, design, and supervision contract disbursed. Percent of Chimuara- Nicoadala feasibility, design, and supervision contract disbursed. Kilometers of roads under works contract. Percent of Namialo-Rio L[uacute]rio Road construction contract disbursed. [[Page 47851]] Percent of Rio L[uacute]rio--Metoro Road construction contract disbursed. Percent of Rio Ligonha- Nampula Road construction contract disbursed. Percent of Chimuara- Nicoadala Road construction contract disbursed. Feasibility/ Environmental and Social Assessment studies, design, supervision, and construction contract (ESA) for Namialo-Rio L[uacute]rio--Metoro Road segment signed. Feasibility/ESA contract for Rio Ligonha-Nampula Road segment signed. Feasibility/ESA contract for Chimuara- Nicoadala Road signed. Time to get land usage rights direito de uso e aproveitamento da terra (state-granted land right) (DUAT). Land Tenure Services Project.... $39,068,307 Establish $3,125,681 Cost to get land usage efficient, secure rights DUAT. land access for Total number of households and officials and investors. residents reached with land strategy and policy awareness and outreach messages. Land strategy approved. Number of buildings rehabilitated or built. Total value of procured equipment and materials. Number of people trained. Rural hectares mapped in Site Specific Activity. Rural hectares mapped in Community Land Fund Initiative. Urban parcels mapped. Rural hectares formalized through Site Specific Activity. Rural hectares formalized through Community Land Fund Initiative. Urban parcels formalized. Number of communities delimited. Number of households having land formalized. Income from coconuts and coconut products. Farmer Income Support Project... $18,400,117 Improve coconut $1,979,071 Survival rate of productivity and coconut seedling. diversification Number of diseased or into cash crop. dead palm trees cleared. Number of coconut seedlings planted. Hectares under production. Number of farmers trained in pest and disease control. Number of farmers trained in crop diversification technologies. Program Administration* and $69,562,756 ................... $10,618,260 Contract for project Control, Monitoring and implementation signed. Evaluation. Pending Subsequent Report**..... ............... ................... $947,078 ---------------------------------------------------------------------------------------------------------------- Cumulative Projects Obligated Objectives disbursements Measures ---------------------------------------------------------------------------------------------------------------- Country: Lesotho Year: 2010 Quarter 2 Total Obligation: $362,527,119 Entity to which the assistance is provided: MCA Lesotho Total Quarterly Disbursement: $8,132,856 ---------------------------------------------------------------------------------------------------------------- Water Project................... $164,027,999 Improve the water $7,962,527 School days lost due to supply for water borne diseases. industrial and Diarrhea notification domestic needs, at health centers. and enhance rural Time saved due to livelihoods access to water through improved source. watershed Rural household (HH) management. provided with access to improved water supply. Rural HH provided with access to improved ventilated latrines. Rural water points constructed. Number of new latrines built. Urban HH with access to potable water supply. Number of enterprises connected to water network. Households connected to improved water network. Cubic meters of treated water from metolong dam delivered through a conveyance system to Water and Sewerage Authority (WASA). Value of water treatment contract works award. [[Page 47852]] Value of conveyance system contract work award. Species population. Livestock grazing per area. Area put under conservation. Health Project.................. $122,398,000 Increase access to $5,594,923 People with HIV still life-extending ART alive 12 months after and essential initiation of health services by treatment. providing a TB notification (per sustainable 100,000 pop.). delivery platform. Proportion of blood units collected annually. Deliveries conducted in the health centers. Immunization coverage rate. Number of Health Centers (H/C) constructed and fully equipped. Value of contract works for health center construction. Percentage of contract works for health center construction disbursed. Percentage of contract works for Botshalo Complex disbursed. Percentage of contract works for Out-Patient Department (OPD) Centers disbursed. Percentage of HSS Contract disbursed. Proportion of People Living With AIDS (PLWA) receiving Antiretroviral treatment (ARV) (by age and sex). Referred tests from central laboratory per year by types (number). Private Sector Development $36,470,318 Stimulate $3,190,732 Average time (days) Project. investment by required to enforce a improving access contract. to credit, Pending commercial reducing cases. transaction costs Cases filed at the and increasing the commercial court. participation of Value of commercial women in the cases. economy. Judicial staff trained. Administrative and clerical staff trained. Awareness campaigns. Portfolio of loans. Loan processing time. Bank accounts. Paper-based payments. Electronic payments. Value of contract services signed. Debit/smart cards issued. Mortgage bonds registered. Value of registered mortgage bonds. New land disputes brought to the Land Tribunal and Courts of Law. Time to complete a land transaction. Time to complete transfer of land rights. Land transactions recorded. Land parcels formalized. Number of land administration personnel trained. Land Act adopted. People trained on gender equality and economic rights. ID cards issued. Population registered in the national database. Program Administration* and $39,654,682 ................... $12,059,494 Control, Monitoring and Evaluation. Pending Subsequent Report**..... ............... ................... $150,871 ---------------------------------------------------------------------------------------------------------------- Cumulative Projects Obligated Objectives disbursements Measures ---------------------------------------------------------------------------------------------------------------- Country: Morocco Year: 2010 Quarter 2 Total Obligation: $697,500,000 Entity to which the assistance is provided: MCA Morocco Total Quarterly Disbursement: $12,316,461 ---------------------------------------------------------------------------------------------------------------- Fruit Tree Productivity......... $300,896,445 Reduce volatility $15,609,252 Total annual volume of of agricultural production of dates production and and olives. increase volume of Cropped area covered by fruit agricultural olive trees. production. Survival rate of newly planted olive trees after 2 years project- supported establishment period. Yield of rehabilitated olive trees. Cropped area covered by date trees. [[Page 47853]] Yield of rehabilitated date palms. Small Scale Fisheries........... $116,168,027 Improve quality of $2,492,975 State of fish stock. fish moving Domestic fish through domestic consumption level. channels and Fisherman net revenue. assure the Average fisherman sales sustainable use of price at Point de fishing resources. D[eacute]barquement Am[eacute]nag[eacute]s (PDA). Volume sold at wholesale markets. Fish sale price. Average sales price. Volume of sales among mobile fish vendors. Artisan and Fez Medina.......... $111,873,858 Increase value $637,900 Average revenue of added to tourism potters receiving and artisan Artisan Production sectors. Activity. Employment and wages among project graduates. Tourist arrivals. Artisan profits (artisans engaged in product finishing and points of sale). Employment created. Small and Medium Enterprises (SME) value added. Financial Services.............. $46,200,000 Increase supply and $12,974,091 Gross loan portfolio decrease costs of outstanding of financial services microcredit available to associations. microenterprises. Portfolio at risk >30 days ratio. Operating expense ratio. Enterprise Support.............. $33,850,000 Improved survival $2,588,790 Average annual sales of rate of new SMEs participating and INDH-funded businesses. income generating Survival rate of activities; participating increased revenue businesses. for new SMEs and INDH-funded income generating activities. Program Administration* and $88,511,670 ................... $12,828,073 Control, Monitoring and Evaluation. Pending Subsequent Report**..... ............... ................... $173,509 ---------------------------------------------------------------------------------------------------------------- Cumulative Projects Obligated Objectives disbursements Measures ---------------------------------------------------------------------------------------------------------------- Country: Tanzania Year: 2010 Quarter 2 Total Obligation: $698,136,000 Entity to which the assistance is provided: MCA Tanzania Total Quarterly Disbursement: $3,562,670 ---------------------------------------------------------------------------------------------------------------- Energy Sector................... $206,042,428 Increase value $4,382,035 New power customers. added to Energy generation-- businesses. Kigoma. Transmission capacity. Percentage disbursed for design and supervision contract Consulting Engineer (CE) year 1 budgeted. Transport Sector................ $368,847,428 Increase cash crop $3,811,282 International roughness revenue and index (Tunduma, Tanga, aggregate visitor Nantumbo, Peramiho). spending. Average annual daily traffic (Tunduma, Tanga, Nantumbo, Peramiho). Kilometers upgraded/ completed (Tunduma, Tanga, Nantumbo, Peramiho). Percent disbursed on construction works (Tunduma, Tanga, Nantumbo, Peramiho). Signed contracts for construction works (Tunduma, Tanga, Nantumbo, Peramiho). Percent disbursed for feasibility and/or design studies (Tunduma, Tanga, Nantumbo, Peramiho). Signed contracts for feasibility and/or design studies (Tunduma, Tanga, Nantumbo, Peramiho). Kilometers of roads under design (Tunduma, Tanga, Nantumbo, Peramiho). International roughness index (Zanzibar Rural Roads). Average annual daily traffic (Zanzibar Rural Roads). Kilometers upgraded/ completed (Zanzibar Rural Roads). Percent disbursed on construction works (Zanzibar Rural Roads). [[Page 47854]] Signed contracts for construction works (Zanzibar Rural Roads). Percent disbursed for feasibility and/or design studies (Zanzibar Rural Roads). Signed contracts for feasibility and/or design studies (Zanzibar Rural Roads). Kilometers of roads under design (Zanzibar Rural Roads). Passenger arrivals. Percentage of upgrade complete (airport). Percent disbursed on construction works (airport). Signed contracts for construction works (airport). Water Sector Project............ $65,692,143 Increase investment $1,619,625 Prevalence of diarrhea in human and (Dar es Salaam). physical capital Prevalence of diarrhea and to reduce the (Morogoro). prevalence of Prevalence of cholera water-related (Dar es Salaam). disease. Prevalence of cholera (Morogoro). Volume of individual water consumption (Dar es Salaam). Volume of individual water consumption (Morogoro). Number of households using improved source for drinking water (Dar es Salaam). Number of households using improved source for drinking water (Morogoro). Number of businesses using improved water source (Dar es Salaam). Number of businesses using improved water source (Morogoro). Volume of water produced (Lower Ruvu). Volume of water produced (Morogoro). Volume of non-revenue water (Dar es Salaam). Operations and maintenance cost recovery ratio (Dar es Salaam). Operations and maintenance cost recovery ratio (Morogoro). Percent disbursed on construction works. Signed contracts for construction works. Program Administration* and $57,554,001 ................... $4,742,878 Control, Monitoring and Evaluation. Pending Subsequent Report**..... ............... ................... $206,197 ---------------------------------------------------------------------------------------------------------------- Cumulative Projects Obligated Objectives disbursements Measures ---------------------------------------------------------------------------------------------------------------- Country: Burkina Faso Year: 2010 Quarter 2 Total Obligation: $478,943,569 Entity to which the assistance is provided: MCA Burkina Faso Total Quarterly Disbursement: $2,203,660 ---------------------------------------------------------------------------------------------------------------- Roads Project................... $194,130,681 Enhance access to $30,195 To Be Determined (TBD). markets through investments in the road network. Rural Land Governance Project... $59,934,614 Increase investment $995,715 TBD. in land and rural productivity through improved land tenure security and land management. Agriculture Development Project. $141,910,059 Expand the $72,153 TBD. productive use of land in order to increase the volume and value of agricultural production in project zones. Bright 2 Schools Project........ $26,829,669 Increase primary $26,829,669 TBD. school completion rates. Program Administration* and $56,138,546 ................... $8,428,572 Control, Monitoring and Evaluation. Pending Subsequent Report**..... ............... ................... $65,145 ---------------------------------------------------------------------------------------------------------------- [[Page 47855]] Cumulative Projects Obligated Objectives disbursements Measures ---------------------------------------------------------------------------------------------------------------- Country: Namibia Year: 2010 Quarter 2 Total Obligation: $304,477,817 Entity to which the assistance is provided: MCA Namibia Total Quarterly Disbursement: $1,800,085 ---------------------------------------------------------------------------------------------------------------- Education Project............... $144,976,559 Improve the $899,988 To Be Determined (TBD). education sector's effectiveness, efficiency and quality. Tourism Project................. $66,959,291 Increase incomes $302,775 TBD. and create employment opportunities by improving the marketing, management and infrastructure of Etosha National Park. Agriculture Project............. $46,965,320 Sustainably improve $42,682 TBD. the economic performance and profitability of the livestock sector and increase the volume of the indigenous natural products for export. Program Administration* and $45,576,647 ................... $3,977,655 Control, Monitoring and Evaluation. Pending Subsequent Report**..... ............... ................... $1,071,642 ---------------------------------------------------------------------------------------------------------------- Cumulative Projects Obligated Objectives disbursements Measures ---------------------------------------------------------------------------------------------------------------- Country: Moldova Year: 2010 Quarter 2 Total Obligation: $7,970,942 Entity to which the assistance is provided: MCA Moldova Total Quarterly Disbursement: $0 ---------------------------------------------------------------------------------------------------------------- Road Rehabilitation Project..... $800,000 ................... $0 To Be Determined (TBD). Transition to High Value $6,788,251 ................... $0 TBD. Agriculture. Program Administration and $382,691 ................... $0 TBD. Monitoring and Evaluation. ---------------------------------------------------------------------------------------------------------------- * Program administration funds are used to pay items such as salaries, rent, and the cost of office equipment. ** These amounts represent disbursements made that will be allocated to individual projects in the subsequent quarter(s) and reported as such in subsequent quarterly report(s). *** The obligated funds reflect a preliminary grant to Moldova for the purpose of implementing a compact. MCC has awarded Moldova a compact grant of $262 million which will take effect once Moldova meets certain conditions. ---------------------------------------------------------------------------------------------------------------- 619(b) Transfer or Allocation of Funds ---------------------------------------------------------------------------------------------------------------- [FR Doc. 2010-19474 Filed 8-6-10; 8:45 am] BILLING CODE 9211-03-P