Notice of Availability of the Final Environmental Impact
Statement (FEIS) for Training Range and Garrison Support Facilities
Construction and Operation at Fort Stewart, GA
AGENCY: Department of the Army, DoD.
ACTION: Notice of Availability (NOA).
-----------------------------------------------------------------------
SUMMARY: The Department of the Army announces the availability of an
FEIS to analyze the environmental and socioeconomic impacts resulting
from the proposed construction and operation of 12 range projects and
two garrison support facilities at Fort Stewart, Georgia.
DATES: The waiting period for the FEIS will end 30 days after the
publication of an NOA in the Federal Register by the U.S. Environmental
Protection Agency.
ADDRESSES: For further information regarding the FEIS, please contact
Mr. Charles Walden, Project Manager, Directorate of Public Works,
Prevention and Compliance Branch, Environmental Division, 1550 Frank
Cochran Drive, Building 1137-A, Fort Stewart, Georgia 31314-4928 or via
e-mail at: [email protected].
FOR FURTHER INFORMATION CONTACT: Ms. Dina McKain, Public Affairs
Office, at (912) 435-9874 during normal business hours.
SUPPLEMENTARY INFORMATION: To meet the needs of Soldiers at Fort
Stewart, additional ranges and garrison support facilities are
required. This Final EIS examines the potential environmental and
socioeconomic impacts of the construction and operation of 12 ranges (a
Multipurpose Machine Gun Range, an Infantry Platoon Battle Course, a
Known Distance Range, two Modified Record Fire Ranges, a Qualification
Training Range, an Infantry Squad Battle Course, a Fire and Movement
Range, a Digital Multipurpose Training Range, a 25 Meter Zero Range, a
Combat Pistol Range, and a Convoy Live-Fire Course and associated
engagement boxes) and two garrison support facilities (a Sky Warrior
Unmanned Aerial System (UAS) facility and a 10th Engineering Battalion
Complex) to be constructed over a 4-year time period. It also examines
potential impacts to surrounding lands and/or local communities.
In addition to consideration of a No Action Alternative
(Alternative A), under which the construction and operation of the
ranges and facilities would not take place, the FEIS analyzed two
action alternatives. Alternative B includes project sites which
predominantly utilize footprints of existing ranges, limit construction
and restrictions to existing maneuver terrain, are located in
relatively close proximity to the cantonment area to reduce unit
transit time, and have fewer overall environmental impacts. Alternative
C includes sites that are not predominantly pre-existing range sites
and generally are located at greater distances from the cantonment
area. These locations generally have a higher level of environmental
impacts. After consideration of all anticipated operational and
environmental impacts, the Army has selected Alternative B as its
preferred alternative.
Impacts were analyzed for a wide range of environmental resource
areas including, but not limited to, air quality, noise, water
resources, biological resources (to include protected species),
cultural resources, socioeconomics, infrastructure (utilities and
transportation), land use, and solid and hazardous materials/waste, as
well as cumulative environmental effects. No significant impacts are
anticipated on any environmental resources. Moderate adverse impacts
have been identified for soils, water quality, protected species,
timber resources, wildland fire, and noise. Adverse impacts to other
resource areas were negligible or minor.
The Final EIS is available at local libraries surrounding Fort
Stewart and
[[Page 49484]]
may also be accessed at http://www.Fortstewart-mmp.eis.com.
Dated: July 28, 2010.
Addison D. Davis, IV,
Deputy Assistant Secretary of the Army (Environment, Safety and
Occupational Health).
[FR Doc. 2010-19987 Filed 8-12-10; 8:45 am]