[Federal Register Volume 75, Number 157 (Monday, August 16, 2010)] [Notices] [Pages 49914-49915] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 2010-20140] ======================================================================= ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. IC10-511-000 and IC10-515-000] Commission Information Collection Activities (FERC-511 and FERC- 515); Comment Request; Extensions August 9, 2010. AGENCY: Federal Energy Regulatory Commission. ACTION: Notice of proposed information collections and request for comments. ----------------------------------------------------------------------- SUMMARY: In compliance with the requirements of section 3506(c)(2)(A) of the Paperwork Reduction Act of 1995, 44 U.S.C. 3506(c)(2)(A) (2006), (Pub. L. 104-13), the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the proposed information collections described below. DATES: Comments in consideration of the collections of information are due October 15, 2010. ADDRESSES: Comments may be filed either electronically (eFiled) or in paper format, and should refer to Docket Nos. IC10-511-000 and IC10- 515-000. (For comments that only pertain to one of the collections, specify the appropriate collection and the related docket number.) Documents must be prepared in an acceptable filing format and in compliance with Commission submission guidelines at http://www.ferc.gov/help/submission-guide.asp. eFiling instructions are available at: http://www.ferc.gov/docs-filing/efiling.asp. First time users must follow eRegister instructions at: http://www.ferc.gov/docs-filing/eregistration.asp, to establish a user name and password before eFiling. The Commission will send an automatic acknowledgement to the sender's e-mail address upon receipt of eFiled comments. Commenters making an eFiling should not make a paper filing. Commenters that are not able to file electronically must send an original and two (2) paper copies of their comments to: Federal Energy Regulatory Commission, Secretary of the Commission, 888 First Street, NE., Washington, DC 20426. Users interested in receiving automatic notification of activity in these dockets may do so through eSubscription at http://www.ferc.gov/docs-filing/esubscription.asp. In addition, all comments and FERC issuances may be viewed, printed or downloaded remotely through FERC's eLibrary at http://www.ferc.gov/docs-filing/elibrary.asp, by searching on Docket Nos. IC10-511 and IC10-515. For user assistance, contact FERC Online Support by e-mail at [email protected], or by phone at: (866) 208-3676 (toll-free), or (202) 502-8659 for TTY. FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by e-mail at [email protected], telephone at (202) 502-8663, and fax at (202) 273-0873. SUPPLEMENTARY INFORMATION: For the purpose of publishing this notice and seeking public comment, FERC requests comments on both FERC-511 (Application for Transfer of License; OMB Control No. 1902-0069), and FERC-515 (Hydropower Licensing: Declaration of Intention; OMB Control No. 1902-0079). The associated regulations, reporting requirements, burdens, and OMB clearance numbers will continue to remain separate and distinct for FERC-511 and FERC-515. FERC-511: The information collected under the requirements of FERC- 511 is used by the Commission to implement the statutory provisions of sections 4(e) and 8 of the Federal Power Act (FPA) (16 U.S.C. 797(e) and 801). Section 4(e) authorizes the Commission to issue licenses for the construction, operation and maintenance of reservoirs, powerhouses, and transmission lines or other facilities necessary for the development and improvement of navigation and for the development, transmission, and utilization of power.\1\ Section 8 of the FPA provides that the voluntary transfer of any license can only be made with the written approval of the Commission. Any successor to the licensee may assign the rights of the original licensee but is subject to all of the conditions of the license. The information filed with the Commission [[Page 49915]] is a mandatory requirement contained in the format of a written application for transfer of license, executed jointly by the parties of the proposed transfer. The transfer of a license may be occasioned by the sale or merger of a licensed hydroelectric project. It is used by the Commission's staff to determine the qualifications of the proposed transferee to hold the license, and to prepare the transfer of the license order. Approval by the Commission of transfer of a license is contingent upon the transfer of title to the properties under license, delivery of all license instruments, and a showing that such transfer is in the public interest. The Commission implements these filing requirements in the Code of Federal Regulations (CFR) under 18 CFR part 9. --------------------------------------------------------------------------- \1\ Refers to facilities across, along, from, or in any of the streams or other bodies of water over which Congress has jurisdiction under its authority to regulate commerce with foreign nations and among the several States, or upon any part of public lands and reservations of the United States, or for the purpose of utilizing the surplus water or water power from any Government dam. --------------------------------------------------------------------------- FERC-515: The information collected under the requirements of FERC- 515 is used by the Commission to implement the statutory provisions of Part I, Section 23(b) of the Federal Power Act (16 U.S.C. 817). Section 23(b) authorized the Commission to make a determination as to whether it has jurisdiction over a proposed water project \2\ not affecting navigable waters \3\ but across, along, over, or in waters over which Congress has jurisdiction under its authority to regulate commerce with foreign nations and among the several States. Section 23(b) requires that any person intending to construct project works on such waters must file a declaration of their intention with the Commission. If the Commission finds the proposed project will have an impact on interstate or foreign commerce, then the person intending to construct the project must obtain a Commission license or exemption before starting construction.\4\ The information is collected in the form of a written application, containing sufficient details to allow the Commission staff to research the jurisdictional aspects of the project. This research includes examining maps and land ownership records to establish whether or not there is Federal jurisdiction over the lands and waters affected by the project. A finding of non-jurisdictional by the Commission eliminates a substantial paperwork burden for the applicant who might otherwise have to file for a license or exemption application. The Commission implements these filing requirements under 18 CFR part 24. --------------------------------------------------------------------------- \2\ Dams or other project works (see 16 U.S.C. 817). \3\ See 16 U.S.C. 796 (8) for the definition of ``Navigable Waters''. \4\ Upon a finding of non-jurisdictional by the Commission, and if no public lands or reservations are affected, permission is granted upon compliance with State laws. --------------------------------------------------------------------------- Action: The Commission is requesting a three-year extension of the current expiration dates for FERC-511 and FERC-515, with no changes. Burden Statement: Total annual burden hours for these collections are estimated as: ---------------------------------------------------------------------------------------------------------------- Average No. of FERC data collection No. of respondents responses per Average burden Total annual annually respondent hours per response burden hours ---------------------------------------------------------------------------------------------------------------- (1) (2) (3) (1)x(2)x(3) ---------------------------------------------------------------------------------------------------------------- FERC-511........................ 23 1 40 920 FERC-515........................ 10 1 80 800 ---------------------------------------------------------------------------------------------------------------- Total annual costs for these collections are estimated as: ---------------------------------------------------------------------------------------------------------------- Cost burden per Total cost burden to FERC data collection respondent respondents \5\ ---------------------------------------------------------------------------------------------------------------- FERC-511...................................................... $2,651 $60,983 FERC-515...................................................... 5,303 53,028 ---------------------------------------------------------------------------------------------------------------- The reporting burden includes the total time, effort, or financial resources expended to generate, maintain, retain, disclose, or provide the information including: (1) Reviewing instructions; (2) developing, acquiring, installing, and utilizing technology and systems for the purposes of collecting, validating, verifying, processing, maintaining, disclosing and providing information; (3) adjusting the existing ways to comply with any previously applicable instructions and requirements; (4) training personnel to respond to a collection of information; (5) searching data sources; (6) completing and reviewing the collection of information; and (7) transmitting, or otherwise disclosing the information. --------------------------------------------------------------------------- \5\ Estimated number of hours an employee works each year = 2080, estimated average annual cost per employee = $137,874. Ex: $60,983 = (920 hours/2080 hours) * $137,874 --------------------------------------------------------------------------- The estimate of cost for respondents is based upon salaries for professional and clerical support, as well as direct and indirect overhead costs. Direct costs include all costs directly attributable to providing this information, such as administrative costs and the cost for information technology. Indirect or overhead costs are costs incurred by an organization in support of its mission. These costs apply to activities which benefit the whole organization rather than any one particular function or activity. Comments are invited on: (1) Whether the proposed collections of information are necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency's estimate of the burden of the proposed collections of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information to be collected; and (4) ways to minimize the burden of the collections of information on those who are to respond, including the use of appropriate automated, electronic, mechanical, or other technological collection techniques or other forms of information technology e.g. permitting electronic submission of responses. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2010-20140 Filed 8-13-10; 8:45 am] BILLING CODE 6717-01-P