[Federal Register Volume 75, Number 179 (Thursday, September 16, 2010)]
[Notices]
[Pages 56580-56595]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2010-23064]


=======================================================================
-----------------------------------------------------------------------

MILLENNIUM CHALLENGE CORPORATION

[MCC FR 10-10]


Notice of Quarterly Report (April 1, 2010-June 30, 2010)

AGENCY: Millennium Challenge Corporation.
SUMMARY: The Millennium Challenge Corporation (MCC) is reporting for 
the quarter April 1, 2010 through June 30, 2010, on assistance provided 
under section 605 of the Millennium Challenge Act of 2003 (22 U.S.C. 
7701 et seq.), as amended (the Act), and on transfers or allocations of 
funds to other federal agencies under section 619(b) of the Act. The 
following report will be made available to the public by publication in 
the Federal Register and on the Internet Web site of the MCC 
(www.mcc.gov) in accordance with section 612(b) of the Act.

    Dated: September 9, 2010.
T. Charles Cooper,
Vice President, Congressional and Public Affairs, Millennium Challenge 
Corporation.

[[Page 56581]]



                                      Assistance Provided Under Section 605
----------------------------------------------------------------------------------------------------------------
                                                                           Cumulative
            Projects                 Obligated          Objectives       disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                     Country: Madagascar Year: 2010 Quarter 3 Total Obligation: $87,998,166
           Entity to which the assistance is provided: MCA Madagascar Total Quarterly Disbursement: $0
----------------------------------------------------------------------------------------------------------------
Land Tenure Project.............      $30,123,098  Increase Land            $29,303,833  Area secured with land
                                                    Titling and                           certificates or titles
                                                    Security.                             in the Zones.
                                                                                         Legal and regulatory
                                                                                          reforms adopted.
                                                                                         Number of land
                                                                                          documents inventoried
                                                                                          in the Zones and
                                                                                          Antananarivo.
                                                                                         Number of land
                                                                                          documents restored in
                                                                                          the Zones and
                                                                                          Antananarivo.
                                                                                         Number of land
                                                                                          documents digitized in
                                                                                          the Zones and
                                                                                          Antananarivo.
                                                                                         Average time for Land
                                                                                          Services Offices to
                                                                                          issue a duplicate copy
                                                                                          of a title.
                                                                                         Average cost to a user
                                                                                          to obtain a duplicate
                                                                                          copy of a title from
                                                                                          the Land Services
                                                                                          Offices.
                                                                                         Number of land
                                                                                          certificates delivered
                                                                                          in the Zones during
                                                                                          the period.
                                                                                         Number of new guichets
                                                                                          fonciers operating in
                                                                                          the Zones.
                                                                                         The 256 Plan Local
                                                                                          d'Occupation Foncier--
                                                                                          Local Plan of Land
                                                                                          Occupation (PLOFs) are
                                                                                          completed.
Financial Sector Reform Project.       25,937,781  Increase                  23,535,170  Volume of funds
                                                    Competition in the                    processed annually by
                                                    Financial Sector.                     the national payment
                                                                                          system.
                                                                                         Number of accountants
                                                                                          and financial experts
                                                                                          registered to become
                                                                                          CPA.
                                                                                         Number of Central Bank
                                                                                          branches capable of
                                                                                          accepting auction
                                                                                          tenders.
                                                                                         Outstanding value of
                                                                                          savings accounts from
                                                                                          CEM in the Zones.
                                                                                         Number of MFIs
                                                                                          participating in the
                                                                                          Refinancing and
                                                                                          Guarantee funds.
                                                                                         Maximum check clearing
                                                                                          delay.
                                                                                         Network equipment and
                                                                                          integrator.
                                                                                         Real time gross
                                                                                          settlement system
                                                                                          (RTGS).
                                                                                         Telecommunication
                                                                                          facilities.
                                                                                         Retail payment clearing
                                                                                          system.
                                                                                         Number of CEM branches
                                                                                          built in the Zones.
                                                                                         Number of savings
                                                                                          accounts from CEM in
                                                                                          the Zones.
                                                                                         Percent of Micro-
                                                                                          Finance Institution
                                                                                          (MFI) loans recorded
                                                                                          in the Central Bank
                                                                                          database.
Agricultural Business Investment       13,687,196  Improve                   13,581,751  Number of farmers
 Project.                                           Agricultural                          receiving technical
                                                    Projection                            assistance.
                                                    Technologies and                     Number of marketing
                                                    Market Capacity in                    contracts of ABC
                                                    Rural Areas.                          clients.
                                                                                         Number of farmers
                                                                                          employing technical
                                                                                          assistance.
                                                                                         Value of refinancing
                                                                                          loans and guarantees
                                                                                          issued to
                                                                                          participating MFIs (as
                                                                                          a measure of value of
                                                                                          agricultural and rural
                                                                                          loans).
                                                                                         Number of
                                                                                          Mnist[egrave]re de
                                                                                          l'Agriculture, de
                                                                                          l'Elevage et de la
                                                                                          P[ecirc]che--Ministry
                                                                                          of Agriculture,
                                                                                          Livestock, and Fishing
                                                                                          (MAEP) agents trained
                                                                                          in marketing and
                                                                                          investment promotion.
                                                                                         Number of people
                                                                                          receiving information
                                                                                          from Agricultural
                                                                                          Business Center (ABCs)
                                                                                          on business
                                                                                          opportunities.
Program Administration* and            18,250,091  ...................       17,577,502
 Control, Monitoring and
 Evaluation.
Pending subsequent reports**....  ...............  ...................                0
----------------------------------------------------------------------------------------------------------------
* Program administration funds are used to pay items such as salaries, rent, and the cost of office equipment.
** These amounts represent disbursements made that will be allocated to individual projects in the subsequent
  quarter(s) and reported as such in subsequent quarterly report(s)


[[Page 56582]]


 
                                                                           Cumulative
            Projects                 Obligated          Objectives       disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                      Country: Honduras Year: 2010 Quarter 3 Total Obligation: $205,000,000
       Entity to which the assistance is provided: MCA Honduras Total Quarterly Disbursement: $20,070,438
----------------------------------------------------------------------------------------------------------------
Rural Development Project.......       67,762,685  Increase the              57,468,393  Number of program
                                                    productivity and                      farmers harvesting
                                                    business skills of                    high-value
                                                    farmers who                           horticulture crops.
                                                    operate small and                    Number of hectares
                                                    medium-size farms                     harvesting high-value
                                                    and their                             horticulture crops.
                                                    employees.                           Number of business
                                                                                          plans prepared by
                                                                                          program farmers with
                                                                                          assistance from the
                                                                                          implementing entity.
                                                                                         Total value of net
                                                                                          sales.
                                                                                         Total number of
                                                                                          recruited farmers
                                                                                          receiving technical
                                                                                          assistance.
                                                                                         Value of loans
                                                                                          disbursed to farmers,
                                                                                          agribusiness, and
                                                                                          other producers and
                                                                                          vendors in the
                                                                                          horticulture industry,
                                                                                          including Program
                                                                                          Farmers, cumulative to
                                                                                          date, Trust Fund
                                                                                          Resources.
                                                                                         Number of loans
                                                                                          disbursed
                                                                                          (disaggregated by
                                                                                          trust fund, leveraged
                                                                                          from trust fund, and
                                                                                          institutions receiving
                                                                                          technical assistance
                                                                                          from ACDI-VOCA).
                                                                                         Number of hectares
                                                                                          under irrigation.
                                                                                         Number of farmers
                                                                                          connected to the
                                                                                          community irrigation
                                                                                          system.
Transportation Project..........      119,887,240  Reduce                   102,606,515  Freight shipment cost
                                                    transportation                        from Tegucigalpa to
                                                    costs between                         Puerto Cortes.
                                                    targeted                             Average annual daily
                                                    production centers                    traffic volume--CA-5.
                                                    and national,                        International roughness
                                                    regional and                          index (IRI)--CA-5.
                                                    global markets.                      Kilometers of road
                                                                                          upgraded--CA-5.
                                                                                         Percent of contracted
                                                                                          road works disbursed--
                                                                                          CA-5.
                                                                                         Average annual daily
                                                                                          traffic volume--
                                                                                          secondary roads.
                                                                                         International roughness
                                                                                          index (IRI)--secondary
                                                                                          roads.
                                                                                         Kilometers of road
                                                                                          upgraded--secondary
                                                                                          roads.
                                                                                         Average annual daily
                                                                                          traffic volume--rural
                                                                                          roads.
                                                                                         Average speed--Cost per
                                                                                          journey (rural roads).
                                                                                         Kilometers of road
                                                                                          upgraded--rural roads.
                                                                                         Percent disbursed for
                                                                                          contracted studies.
                                                                                         Value of signed
                                                                                          contracts for
                                                                                          feasibility, design,
                                                                                          supervision and
                                                                                          program mgmt
                                                                                          contracts.
                                                                                         Kilometers (km) of
                                                                                          roads under design.
                                                                                         Number of Construction
                                                                                          works and supervision
                                                                                          contracts signed.
                                                                                         Kilometers (km) of
                                                                                          roads under works
                                                                                          contracts.
Program Administration* and            17,350,075  ...................       10,825,354
 Control, Monitoring and
 Evaluation.
Pending subsequent reports**....  ...............  ...................        1,521,767
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objectives       disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                     Country: Cape Verde Year: 2010 Quarter 3 Total Obligation: $110,078,488
       Entity to which the assistance is provided: MCA Cape Verde Total Quarterly Disbursement: $8,145,814
----------------------------------------------------------------------------------------------------------------
Watershed and Agricultural             12,031,549  Increase                   9,635,989  Productivity:
 Support Project.                                   agricultural                          Horticulture, Paul
                                                    production in                         watershed.
                                                    three targeted                       Productivity:
                                                    watershed areas on                    Horticulture, Faja
                                                    three islands.                        watershed.
                                                                                         Productivity:
                                                                                          Horticulture,
                                                                                          Mosteiros watershed.
                                                                                         Number of farmers
                                                                                          adopting drip
                                                                                          irrigation: All
                                                                                          intervention
                                                                                          watersheds (Paul, Faja
                                                                                          and Mosteiros)
                                                                                          (incremental).
                                                                                         Area irrigated with
                                                                                          drip irrigation: All
                                                                                          intervention
                                                                                          watersheds (Paul, Faja
                                                                                          and Mosteiros)
                                                                                          (incremental).
                                                                                         Irrigation Works:
                                                                                          Percent contracted
                                                                                          works disbursed. All
                                                                                          intervention
                                                                                          watersheds (Paul, Faja
                                                                                          and Mosteiros)
                                                                                          (incremental).
                                                                                         Number of reservoirs
                                                                                          constructed in all
                                                                                          intervention
                                                                                          watersheds (Paul, Faja
                                                                                          and Mosteiros)
                                                                                          (incremental).

[[Page 56583]]

 
                                                                                         Number of farmers that
                                                                                          have completed
                                                                                          training in at least 3
                                                                                          of 5 core agricultural
                                                                                          disciplines: All
                                                                                          intervention
                                                                                          watersheds (Paul, Faja
                                                                                          and Mosteiros)
                                                                                          (incremental).
Infrastructure Improvement             82,630,208  Increase                  62,000,390  Travel time ratio:
 Project.                                           integration of the                    percentage of
                                                    internal market                       beneficiary population
                                                    and reduce                            further than 30
                                                    transportation                        minutes from nearest
                                                    costs.                                market.
                                                                                         Kilometers of roads
                                                                                          rehabilitated.
                                                                                         Percent of contracted
                                                                                          Santiago Roads works
                                                                                          disbursed
                                                                                          (cumulative).
                                                                                         Percent of contracted
                                                                                          Santo Antao Bridge
                                                                                          works disbursed
                                                                                          (cumulative).
                                                                                         Port of Praia: percent
                                                                                          of contracted port
                                                                                          works disbursed
                                                                                          (cumulative).
                                                                                         Cargo village: percent
                                                                                          of contracted works
                                                                                          disbursed
                                                                                          (cumulative).
                                                                                         Quay 2 improvements:
                                                                                          percent of contracted
                                                                                          works disbursed
                                                                                          (cumulative).
                                                                                         Access road: percent of
                                                                                          contracted works
                                                                                          disbursed
                                                                                          (cumulative).
Private Sector Development              1,931,223  Spur private sector        1,406,654  MFI portfolio at risk,
 Project.                                           development on all                    adjusted (level).
                                                    islands through
                                                    increased
                                                    investment in the
                                                    priority sectors
                                                    and through
                                                    financial sector
                                                    reform.
Program Administration* and            13,485,508  ...................       11,095,940
 Control, Monitoring and
 Evaluation.
Pending subsequent reports**....  ...............  ...................              480
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objectives       disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                     Country: Nicaragua Year: 2010 Quarter 3 Total Obligation: $113,599,751
       Entity to which the assistance is provided: MCA Nicaragua Total Quarterly Disbursement: $4,666,842
----------------------------------------------------------------------------------------------------------------
Property Regularization Project.        7,205,205  Increase Investment        5,386,594  Automated database of
                                                    by strengthening                      registry and cadastre
                                                    property rights.                      installed in the 10
                                                                                          municipalities of
                                                                                          Leon.
                                                                                         Value of land, urban.
                                                                                         Value of land, rural.
                                                                                         Time to conduct a land
                                                                                          transaction.
                                                                                         Number of additional
                                                                                          parcels with a
                                                                                          registered title,
                                                                                          urban.
                                                                                         Number of additional
                                                                                          parcels with a
                                                                                          registered title,
                                                                                          rural.
                                                                                         Area covered by
                                                                                          cadastral mapping.
                                                                                         Cost to conduct a land
                                                                                          transaction.
Transportation Project..........       57,999,999  Reduce                    53,642,992  Annual Average daily
                                                    transportation                        traffic volume: N1
                                                    costs between Leon                    Section R1.
                                                    and Chinandega and                   Annual Average daily
                                                    national, regional                    traffic volume: N1
                                                    and global markets.                   Section R2.
                                                                                         Annual Average daily
                                                                                          traffic volume: Port
                                                                                          Sandino (S13).
                                                                                         Annual Average daily
                                                                                          traffic volume:
                                                                                          Villanueva-Guasaule
                                                                                          Annual.
                                                                                         Average daily traffic
                                                                                          volume: Somotillo-
                                                                                          Cinco Pinos (S1).
                                                                                         Annual average daily
                                                                                          traffic volume:
                                                                                          Le[oacute]n-Poneloya-
                                                                                          Las Pe[ntilde]itas.
                                                                                         International Roughness
                                                                                          Index: N-I Section R1.
                                                                                         International Roughness
                                                                                          Index: N-I Section R2.
                                                                                         International Roughness
                                                                                          Index: Port Sandino
                                                                                          (S13).
                                                                                         International roughness
                                                                                          index: Villanueva-
                                                                                          Guasaule.
                                                                                         International roughness
                                                                                          index: Somotillo-Cinco
                                                                                          Pinos.
                                                                                         International roughness
                                                                                          index: Le[oacute]n-
                                                                                          Poneloya-Las
                                                                                          Pe[ntilde]itas.
                                                                                         Kilometers of NI
                                                                                          upgraded: R1 and R2
                                                                                          and S13.
                                                                                         Kilometers of NI
                                                                                          upgraded: Villanueva-
                                                                                          Guasaule.

[[Page 56584]]

 
                                                                                         Kilometers of S1 road
                                                                                          upgraded.
                                                                                         Kilometers of S9 road
                                                                                          upgraded.
Rural Development Project.......       32,897,500  Increase the value        25,828,413  Number of beneficiaries
                                                    added of farms and                    with business plans.
                                                    enterprises in the                   Numbers of manzanas (1
                                                    region.                               Manzana = 1.7
                                                                                          hectares), by sector,
                                                                                          harvesting higher-
                                                                                          value crops.
                                                                                         Number of beneficiaries
                                                                                          with business plans
                                                                                          prepared with
                                                                                          assistance of Rural
                                                                                          Business Development
                                                                                          Project.
                                                                                         Number of beneficiaries
                                                                                          implementing Forestry
                                                                                          business plans under
                                                                                          Improvement of Water
                                                                                          Supplies Activity.
                                                                                         Number of Manzanas
                                                                                          reforested.
                                                                                         Number of Manzanas with
                                                                                          trees planted.
Program Administration*, Due           15,497,047  ...................       11,980,280
 Diligence, Monitoring and
 Evaluation.
Pending subsequent reports**....  ...............  ...................        1,509,801
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objectives       disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                      Country: Georgia Year: 2010 Quarter 3 Total Obligation: $395,300,000
        Entity to which the assistance is provided: MCA Georgia Total Quarterly Disbursement: $25,160,477
----------------------------------------------------------------------------------------------------------------
Regional Infrastructure               315,600,000  Key Regional             163,853,797  Household savings from
 Rehabilitation Project.                            Infrastructure                        Infrastructure
                                                    Rehabilitated.                        Rehabilitation
                                                                                          Activities.
                                                                                         Savings in vehicle
                                                                                          operating costs (VOC).
                                                                                         International roughness
                                                                                          index (IRI).
                                                                                         Annual average daily
                                                                                          traffic (AADT).
                                                                                         Travel Time.
                                                                                         Road paved/completed.
                                                                                         Construction Works
                                                                                          completed (Contract
                                                                                          1).
                                                                                         Construction Works
                                                                                          completed (Contract
                                                                                          2).
                                                                                         Signed contracts for
                                                                                          feasibility and/or
                                                                                          design studies.
                                                                                         Percent of contracted
                                                                                          studies disbursed.
                                                                                         Kilometers of roads
                                                                                          under design.
                                                                                         Signed contracts for
                                                                                          road works.
                                                                                         Kilometers of roads
                                                                                          under works contracts.
                                                                                         Sites rehabilitated
                                                                                          (phases I, II, III)--
                                                                                          pipeline.
                                                                                         Construction works
                                                                                          completed (phase II)--
                                                                                          pipeline.
                                                                                         Savings in household
                                                                                          expenditures for all
                                                                                          RID subprojects.
                                                                                         Population Served by
                                                                                          all RID subprojects.
                                                                                         RID Subprojects
                                                                                          completed.
                                                                                         Value of RID Grant
                                                                                          Agreements signed.
                                                                                         Value of project works
                                                                                          and goods contracts
                                                                                          signed.
                                                                                         RID subprojects with
                                                                                          works initiated.
Regional Enterprise Development        47,350,000  Enterprises in            39,893,670  Jobs Created by
 Project.                                           Regions Developed.                    Agribusiness
                                                                                          Development Activity
                                                                                          (ADA) and by Georgia
                                                                                          Regional Development
                                                                                          Fund (GRDF).
                                                                                         Household net income--
                                                                                          ADA and GRDF.
                                                                                         Jobs created--ADA.
                                                                                         Firm income--ADA.
                                                                                         Household net income--
                                                                                          ADA.
                                                                                         Beneficiaries (direct
                                                                                          and indirect)--ADA.
                                                                                         Grant agreements
                                                                                          signed--ADA.
                                                                                         Increase in gross
                                                                                          revenues of portfolio
                                                                                          companies (PC).
                                                                                         Increase in portfolio
                                                                                          company employees.
                                                                                         Increase in wages paid
                                                                                          to the portfolio
                                                                                          company employees.
                                                                                         Portfolio companies
                                                                                          (PC).
                                                                                         Funds disbursed to the
                                                                                          portfolio companies.
Program Administration*, Due           32,350,000  ...................       18,641,284
 Diligence, Monitoring and
 Evaluation.

[[Page 56585]]

 
Pending subsequent reports**....  ...............  ...................       25,160,477
----------------------------------------------------------------------------------------------------------------
November 2008, MCC and the Georgian government signed a Compact amendment making up to $100 million of
  additional funds available to the Millennium Challenge Georgia Fund. These funds will be used to complete
  works in the Roads, Regional Infrastructure Development, and Energy Rehabilitation Projects contemplated by
  the original Compact. The amendment was ratified by the Georgian parliament and entered into force on January
  30, 2009.


 
                                                                           Cumulative
            Projects                 Obligated          Objectives       disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                       Country: Vanuatu Year: 2010 Quarter 3 Total Obligation: $65,690,000
        Entity to which the assistance is provided: MCA Vanuatu Total Quarterly Disbursement: $7,281,831
----------------------------------------------------------------------------------------------------------------
Transportation Infrastructure          60,162,579  Facilitate                50,820,986  Traffic volume (average
 Project.                                           transportation to                     annual daily traffic)--
                                                    increase tourism                      Efate: Ring Road.
                                                    and business                         Traffic Volume (average
                                                    development.                          annual daily traffic)--
                                                                                          Santo: East Coast
                                                                                          Road.
                                                                                         Kilometers of road
                                                                                          upgraded--Efate: Ring
                                                                                          Road.
                                                                                         Kilometers of roads
                                                                                          upgraded--Santo: East
                                                                                          Coast Road.
                                                                                         Percent of contracted
                                                                                          roads works disbursed
                                                                                          (USD disbursed): Total
                                                                                          (Cumulative).
Program Administration*, Due            5,527,421  ...................        3,323,066
 Diligence, Monitoring and
 Evaluation.
Pending subsequent reports**....  ...............  ...................        1,427,754
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objectives       disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                      Country: Armenia Year: 2010 Quarter 3 Total Obligation: $235,650,000
        Entity to which the assistance is provided: MCA Armenia Total Quarterly Disbursement: $13,029,733
----------------------------------------------------------------------------------------------------------------
Irrigated Agriculture Project         152,709,208  Increase                  57,588,723  Training/technical
 (Agriculture and Water).                           agricultural                          assistance provided
                                                    productivity                          for On-Farm Water
                                                    Improve and                           Management.
                                                    Quality of                           Training/technical
                                                    Irrigation.                           assistance provided
                                                                                          for Post-Harvest
                                                                                          Processing.
                                                                                         Loans Provided.
                                                                                         Percent of contracted
                                                                                          works disbursed.
                                                                                         Value of signed
                                                                                          contracts for
                                                                                          irrigation works.
                                                                                         Number of farmers using
                                                                                          better on-farm water
                                                                                          management.
                                                                                         Number of enterprises
                                                                                          using improved
                                                                                          techniques.
                                                                                         Value of irrigation
                                                                                          feasibility and/or
                                                                                          detailed design
                                                                                          contracts signed.
                                                                                         Additional Land
                                                                                          irrigated under
                                                                                          project.
                                                                                         Percent of contracted
                                                                                          irrigation feasibility
                                                                                          and/or design studies
                                                                                          disbursed.
Rural Road Rehabilitation              67,100,000  Better access to           7,870,945  Average annual daily
 Project.                                           economic and                          traffic on Pilot
                                                    social                                Roads.
                                                    infrastructure.                      International roughness
                                                                                          index for Pilot Roads.
                                                                                         Road Sections
                                                                                          Rehabilitated--Pilot
                                                                                          Roads.
                                                                                         Pilot Roads: Percent of
                                                                                          Works Completed.
Program Administration*, Due           15,840,792  ...................        9,572,123
 Diligence, Monitoring and
 Evaluation.
Pending subsequent reports**....  ...............  ...................        1,094,394
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objectives       disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                       Country: Benin Year: 2010 Quarter 3 Total Obligation: $305,761,550
         Entity to which the assistance is provided: MCA Benin Total Quarterly Disbursement: $21,720,603
----------------------------------------------------------------------------------------------------------------
Access to Financial Services           19,650,000  Expand Access to           4,203,641  Volume of credits
 Project.                                           Financial Services.                   granted by the Micro-
                                                                                          Finance Institutions
                                                                                          (MFI).
                                                                                         Volume of saving
                                                                                          collected by the Micro-
                                                                                          Finance Institutions.
                                                                                         Average portfolio at
                                                                                          risk >90 days of
                                                                                          microfinance
                                                                                          institutions at the
                                                                                          national level.
                                                                                         Operational self-
                                                                                          sufficiency of MFIs at
                                                                                          the national level.

[[Page 56586]]

 
                                                                                         Number of institutions
                                                                                          receiving grants
                                                                                          through the Facility.
                                                                                         Number of MFIs
                                                                                          inspected by CSSFD.
Access to Justice Project.......       34,270,000  Improved Ability of        3,256,735  Average time to enforce
                                                    Justice System to                     a contract.
                                                    Enforce Contracts                    Percent of firms
                                                    and Reconcile                         reporting confidence
                                                    Claims.                               in the judicial
                                                                                          system.
                                                                                         Passage of new legal
                                                                                          codes.
                                                                                         Average time required
                                                                                          for Tribunaux de
                                                                                          premiere instance--
                                                                                          arbitration centers
                                                                                          and courts of first
                                                                                          instance (TPI) to
                                                                                          reach a final decision
                                                                                          on a case.
                                                                                         Average time required
                                                                                          for Court of Appeals
                                                                                          to reach a final
                                                                                          decision on a case.
                                                                                         Percent of cases
                                                                                          resolved in TPI per
                                                                                          year.
                                                                                         Percent of cases
                                                                                          resolved in Court of
                                                                                          Appeals per year.
                                                                                         Number of Courthouses
                                                                                          completed.
                                                                                         Average time required
                                                                                          to register a business
                                                                                          (soci[eacute]t[eacute]
                                                                                          ).
                                                                                         Average time required
                                                                                          to register a business
                                                                                          (sole proprietorship).
Access to Land Project..........       35,645,826  Strengthen property       15,439,332  Total value of
                                                    rights and                            investment in targeted
                                                    increase                              urban land parcels.
                                                    investment in                        Total value of
                                                    rural and urban                       investment in targeted
                                                    land.                                 rural land parcels.
                                                                                         Average cost required
                                                                                          to convert occupancy
                                                                                          permit to land title
                                                                                          through systematic
                                                                                          process.
                                                                                         Share of respondents
                                                                                          perceiving land
                                                                                          security in the PH-TF
                                                                                          or PFR areas.
                                                                                         Number of preparatory
                                                                                          studies completed.
                                                                                         Number of Legal and
                                                                                          Regulatory Reforms
                                                                                          Adopted.
                                                                                         Amount of Equipment
                                                                                          Purchased.
                                                                                         Number of new land
                                                                                          titles obtained by
                                                                                          transformation of
                                                                                          occupancy permit.
                                                                                         Number of land
                                                                                          certificates issued
                                                                                          within MCA- Benin
                                                                                          implementation.
                                                                                         Number of PFRs
                                                                                          established with MCA
                                                                                          Benin implementation.
                                                                                         Number of permanent
                                                                                          stations installed.
                                                                                         Number of stakeholders
                                                                                          Trained.
                                                                                         Number of communes with
                                                                                          new cadastres.
                                                                                         Number of operational
                                                                                          land market
                                                                                          information systems.
Access to Markets Project.......      170,259,549  Improve Access to         44,448,945  Volume of merchandise
                                                    Markets through                       traffic through the
                                                    Improvements to                       Port Autonome de
                                                    the Port of                           Cotonou.
                                                    Cotonou.                             Bulk ship carriers
                                                                                          waiting times at the
                                                                                          port.
                                                                                         Port design-build
                                                                                          contract awarded.
                                                                                         Port crime levels
                                                                                          (number of thefts).
                                                                                         Average time to clear
                                                                                          customs.
                                                                                         Port meets--
                                                                                          international port
                                                                                          security standards
                                                                                          (ISPS).
Program Administration*, Due           45,936,175  ...................       24,737,283
 Diligence, Monitoring and
 Evaluation.
Pending subsequent reports**....  ...............  ...................          283,062
----------------------------------------------------------------------------------------------------------------


[[Page 56587]]


 
                                                                           Cumulative
            Projects                 Obligated          Objectives       disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                       Country: Ghana Year: 2010 Quarter 3 Total Obligation: $537,863,123
         Entity to which the assistance is provided: MCA Ghana Total Quarterly Disbursement: $42,061,572
----------------------------------------------------------------------------------------------------------------
Agriculture Project.............      211,750,193  Enhance                   88,344,318  Number of farmers
                                                    Profitability of                      trained in Commercial
                                                    cultivation,                          Agriculture.
                                                    services to                          Number of
                                                    agriculture and                       agribusinesses
                                                    product handling                      assisted.
                                                    in support of the                    Number of preparatory
                                                    expansion of                          land studies
                                                    commercial                            completed.
                                                    agriculture among                    Legal and Regulatory
                                                    groups of                             land reforms adopted.
                                                    smallholder farms.                   Number of landholders
                                                                                          reached by public
                                                                                          outreach efforts.
                                                                                         Number of hectares
                                                                                          under production.
                                                                                         Number of personnel
                                                                                          trained.
                                                                                         Number of buildings
                                                                                          rehabilitated/
                                                                                          constructed.
                                                                                         Value of equipment
                                                                                          purchased.
                                                                                         Feeder Roads
                                                                                          International
                                                                                          Roughness Index.
                                                                                         Feeder Roads Annualized
                                                                                          Average Daily Traffic.
                                                                                         Value of signed
                                                                                          contracts for
                                                                                          feasibility and/or
                                                                                          design studies of
                                                                                          Feeder Roads.
                                                                                         Percent of contracted
                                                                                          design/feasibility
                                                                                          studies completed for
                                                                                          Feeder Roads.
                                                                                         Value of signed works
                                                                                          contracts for Feeder
                                                                                          Roads.
                                                                                         Percent of contracted
                                                                                          Feeder Road works
                                                                                          disbursed.
                                                                                         Value of loans
                                                                                          disbursed to clients
                                                                                          from agriculture loan
                                                                                          fund.
                                                                                         Value of signed
                                                                                          contracts for
                                                                                          feasibility and/or
                                                                                          design studies
                                                                                          (irrigation).
                                                                                         Percent of contracted
                                                                                          (design/feasibility)
                                                                                          studies complete
                                                                                          (irrigation).
                                                                                         Value of signed
                                                                                          contracts for
                                                                                          irrigation works
                                                                                          (irrigation).
                                                                                         Rural hectares mapped.
                                                                                         Percent of contracted
                                                                                          irrigation works
                                                                                          disbursed.
                                                                                         Percent of people aware
                                                                                          of their land rights
                                                                                          in Pilot Land
                                                                                          Registration Areas.
                                                                                         Total number of parcels
                                                                                          surveyed in the Pilot
                                                                                          Land Registration
                                                                                          Areas (PLRAs).
                                                                                         Volume of products
                                                                                          passing through post-
                                                                                          harvest treatment.
Rural Development Project.......       73,436,385  Strengthen the            19,912,312  Number of students
                                                    rural institutions                    enrolled in schools
                                                    that provide                          affected by Education
                                                    services                              Facilities Sub-
                                                    complementary to,                     Activity.
                                                    and supportive of,                   Number of schools
                                                    agricultural and                      rehabilitated.
                                                    agriculture                          Number of basic school
                                                    business                              blocks constructed to
                                                    development.                          Ministry of Education
                                                                                          (MOE) construction
                                                                                          standards.
                                                                                         Distance to collect
                                                                                          water.
                                                                                         Time to collect water.
                                                                                         Incidence of guinea
                                                                                          worm.
                                                                                         Average number of days
                                                                                          lost due to guinea
                                                                                          worm.
                                                                                         Number of people
                                                                                          affected by Water and
                                                                                          Sanitation Facilities
                                                                                          Sub-Activity.
                                                                                         Number of stand-alone
                                                                                          boreholes/wells/
                                                                                          nonconventional water
                                                                                          systems constructed/
                                                                                          rehabilitated.
                                                                                         Number of small-town
                                                                                          water systems designed
                                                                                          and due diligence
                                                                                          completed for
                                                                                          construction.
                                                                                         Number of pipe
                                                                                          extension projects
                                                                                          designed and due
                                                                                          diligence completed
                                                                                          for construction.
                                                                                         Number of agricultural
                                                                                          processing plants in
                                                                                          target districts with
                                                                                          electricity due to
                                                                                          Rural Electrification
                                                                                          Sub-Activity.
Transportation Project..........      209,766,616  Reduce the                54,707,517  Trunk Roads
                                                    transportation                        International
                                                    costs affecting                       roughness index.
                                                    agriculture                          N1 International
                                                    commerce at sub-                      Roughness Index.
                                                    regional levels.                     N1 Annualized Average
                                                                                          Daily Traffic.
                                                                                         N1 Kilometers of road
                                                                                          upgraded.
                                                                                         Value of signed
                                                                                          contracts for
                                                                                          feasibility and/or
                                                                                          design studies of the
                                                                                          N1.
                                                                                         Percent of contracted
                                                                                          design/feasibility
                                                                                          studies completed of
                                                                                          the N1.
                                                                                         Value of signed
                                                                                          contracts for road
                                                                                          works N1, Lot 1.
                                                                                         Value of signed
                                                                                          contracts for road
                                                                                          works N1, Lot 2.
                                                                                         Trunk Roads Annualized
                                                                                          Average Daily Traffic.
                                                                                         Trunk Roads Kilometers
                                                                                          of roads completed.
                                                                                         Percent of contracted
                                                                                          design/feasibility
                                                                                          studies completed of
                                                                                          Trunk Roads.

[[Page 56588]]

 
                                                                                         Percent of contracted
                                                                                          Trunk Road works
                                                                                          disbursed.
                                                                                         Ferry Activity:
                                                                                          annualized average
                                                                                          daily traffic
                                                                                          vehicles.
                                                                                         Ferry Activity: annual
                                                                                          average daily traffic
                                                                                          (passengers).
                                                                                         Landing stages
                                                                                          rehabilitated.
                                                                                         Ferry terminal
                                                                                          upgraded.
                                                                                         Rehabilitation of
                                                                                          Akosombo Floating Dock
                                                                                          completed.
                                                                                         Rehabilitation of
                                                                                          landing stages
                                                                                          completed.
                                                                                         Percent of contracted
                                                                                          road works disbursed:
                                                                                          N1, Lot 2.
                                                                                         Percent of contracted
                                                                                          road works disbursed:
                                                                                          N1, Lot 2.
                                                                                         Percent of contracted
                                                                                          work disbursed: ferry
                                                                                          and floating dock.
                                                                                         Percent of contracted
                                                                                          work disbursed:
                                                                                          landings and
                                                                                          terminals.
                                                                                         Value of signed
                                                                                          contracts for
                                                                                          feasibility and/or
                                                                                          design studies of
                                                                                          Trunk Roads.
                                                                                         Value of signed
                                                                                          contracts for Trunk
                                                                                          Roads.
Program Administration*, Due           42,909,929  ...................       24,009,830
 Diligence, Monitoring and
 Evaluation.
Pending subsequent reports**....  ...............  ...................          218,946
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objectives       disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                    Country: El Salvador Year: 2010 Quarter 3 Total Obligation: $460,940,000
      Entity to which the assistance is provided: MCA El Salvador Total Quarterly Disbursement: $30,180,141
----------------------------------------------------------------------------------------------------------------
Human Development Project.......      101,753,001  Increase human and        21,017,837  Employment rate of
                                                    physical capital                      graduates of middle
                                                    of residents of                       technical schools.
                                                    the Northern Zone                    Graduation rates of
                                                    to take advantage                     middle technical
                                                    of employment and                     schools.
                                                    business                             Middle technical
                                                    opportunities.                        schools remodeled and
                                                                                          equipped.
                                                                                         Scholarships granted to
                                                                                          students of middle
                                                                                          technical schools.
                                                                                         Students of non-formal
                                                                                          training.
                                                                                         Cost of water.
                                                                                         Time collecting water.
                                                                                         Households benefiting
                                                                                          with water solutions
                                                                                          built.
                                                                                         Potable water and basic
                                                                                          sanitation systems
                                                                                          with construction
                                                                                          contracts signed.
                                                                                         Cost of electricity.
                                                                                         Households benefiting
                                                                                          with a connection to
                                                                                          the electricity
                                                                                          network.
                                                                                         Household benefiting
                                                                                          with the installation
                                                                                          of isolated solar
                                                                                          systems.
                                                                                         Kilometers of new
                                                                                          electrical lines with
                                                                                          construction contracts
                                                                                          signed.
                                                                                         Population benefiting
                                                                                          from strategic
                                                                                          infrastructure.
Productive Development Project..       71,824,000  Increase production       26,483,228  Number of hectares
                                                    and employment in                     under production with
                                                    the Northern Zone.                    MCC support.
                                                                                         Number of beneficiaries
                                                                                          of technical
                                                                                          assistance and
                                                                                          training--Agriculture.
                                                                                         Number of beneficiaries
                                                                                          of technical
                                                                                          assistance and
                                                                                          training--Agribusiness
                                                                                          .
                                                                                         Value of Agricultural
                                                                                          Loans to Farmers/
                                                                                          Agribusiness.
Connectivity Project............      246,122,001  Reduce travel cost        60,724,725  Average annual daily
                                                    and time within                       traffic.
                                                    the Northern Zone,                   International roughness
                                                    with the rest of                      index.
                                                    the country, and                     Kilometers of roads
                                                    within the region.                    rehabilitated.
                                                                                         Kilometers of roads
                                                                                          with Construction
                                                                                          Initiated.
Program Administration* and            41,240,998  ...................       14,233,352
 Control, Monitoring and
 Evaluation.
Pending Subsequent Report**.....  ...............  ...................       30,180,141
----------------------------------------------------------------------------------------------------------------


[[Page 56589]]


 
                                                                           Cumulative
            Projects                 Obligated          Objectives       disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                        Country: Mali Year: 2010 Quarter 3 Total Obligation: $451,611,164
         Entity to which the assistance is provided: MCA Mali Total Quarterly Disbursement: $27,750,705
----------------------------------------------------------------------------------------------------------------
Bamako Senou Airport Improvement  ...............  ...................  ...............  Employment at airport.
 Project.                                                                                Signature of design
                                                                                          contract.
                                                                                         Average number of
                                                                                          weekly flights
                                                                                          (arrivals).
                                                                                         Passenger traffic
                                                                                          (annual average).
                                                                                         Percent works complete.
                                                                                         Time required for
                                                                                          passenger processing
                                                                                          at departures and
                                                                                          arrivals.
                                                                                         Percent works complete.
                                                                                         Percent of airport
                                                                                          management and
                                                                                          maintenance plan
                                                                                          implemented.
                                                                                         Airport meets Federal
                                                                                          Aviation
                                                                                          Administration (FAA)
                                                                                          and International
                                                                                          Civil Aviation
                                                                                          Organization (ICAO)
                                                                                          security standards.
                                                                                         Technical assistance
                                                                                          delivered to project.
Alatona Irrigation Project......      234,884,675  Increase the              46,189,523  Main season rice
                                                    agricultural                          yields.
                                                    production and                       International roughness
                                                    productivity in                       index (IRI) on the
                                                    the Alatona zone                      Niono-Goma Coura
                                                    of the ON.                            Route.
                                                                                         Average daily vehicle
                                                                                          count.
                                                                                         Percentage works
                                                                                          completed on Niono-
                                                                                          Goma Coura road.
                                                                                         Number of hectares of
                                                                                          land irrigated in the
                                                                                          Alatona Canal.
                                                                                         Irrigation system
                                                                                          efficiency on Alatona
                                                                                          Canal during the rainy
                                                                                          season and the dry
                                                                                          season.
                                                                                         Completion rate of work
                                                                                          on the construction of
                                                                                          the main system (B03).
                                                                                         Percentage of
                                                                                          contracted irrigation
                                                                                          construction works
                                                                                          disbursed.
                                                                                         Number of titles
                                                                                          registered in the land
                                                                                          registration office of
                                                                                          the Alatona zone.
                                                                                         Number of market
                                                                                          gardens allocated in
                                                                                          Alatona zones (for
                                                                                          PAPs) (market garden
                                                                                          parcels allotted to
                                                                                          PAP women).
                                                                                         Decree transferring
                                                                                          legal control of the
                                                                                          project impact area is
                                                                                          passed.
                                                                                         Contractor implementing
                                                                                          the ``Mapping of
                                                                                          Agricultural and
                                                                                          Communal Land
                                                                                          Parcels'' contract is
                                                                                          mobilized.
                                                                                         Net school enrollment
                                                                                          rate (in Alatona
                                                                                          zone).
                                                                                         Percent of Alatona
                                                                                          population with access
                                                                                          to drinking water.
                                                                                         Number of schools
                                                                                          available in Alatona.
                                                                                         Number of health
                                                                                          centers available in
                                                                                          Alatona.
                                                                                         Number of affected
                                                                                          people who have been
                                                                                          compensated.
                                                                                         Resettlement Census
                                                                                          verified.
                                                                                         Adoption of Rate of
                                                                                          Extension Techniques.
                                                                                         Area planted with rice
                                                                                          during the rainy
                                                                                          season.
                                                                                         Area planted with
                                                                                          shallots during dry
                                                                                          season.
                                                                                         Number of farmers
                                                                                          trained.
                                                                                         Water management system
                                                                                          design and capacity
                                                                                          building strategy
                                                                                          implemented.
                                                                                         Amount of credit
                                                                                          extended to Alatona
                                                                                          farmers.
                                                                                         Number of farmers
                                                                                          accessing grant
                                                                                          assistance for first
                                                                                          loan from financial
                                                                                          institutions.
                                                                                         Financial institution
                                                                                          partners identified
                                                                                          (report on assessment
                                                                                          of the financial
                                                                                          institutions in the
                                                                                          Office du Niger--
                                                                                          Office of Niger zone
                                                                                          (ON zone).
                                                                                         Loan Portfolio quality
                                                                                          of Alatona MFIs:
                                                                                          portfolio at risk.
Program Administration* and            38,005,000  ...................       20,385,241
 Control, Monitoring and
 Evaluation.
Pending Subsequent Report**.....  ...............  ...................                9
----------------------------------------------------------------------------------------------------------------


[[Page 56590]]


 
                                                                           Cumulative
            Projects                 Obligated          Objectives       disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                      Country: Mongolia Year: 2010 Quarter 3 Total Obligation: $284,902,443
        Entity to which the assistance is provided: MCA Mongolia Total Quarterly Disbursement: $2,169,773
----------------------------------------------------------------------------------------------------------------
Property Rights Project.........       27,201,061  Increase security          1,628,930  Number of studies
                                                    and capitalization                    completed.
                                                    of land assets                       Legal and regulatory
                                                    held by lower-                        reforms adopted.
                                                    income Mongolians,                   Number of landholders
                                                    and increased peri-                   reached by public
                                                    urban herder                          outreach efforts.
                                                    productivity and                     Training to
                                                    incomes.                              Leaseholders--Intensiv
                                                                                          e and Semi-Intensive
                                                                                          Farming.
                                                                                         Number of Buildings
                                                                                          rehabilitated/
                                                                                          constructed.
                                                                                         Value of equipment
                                                                                          purchased.
                                                                                         Rural hectares Mapped.
                                                                                         Urban Parcels Mapped.
                                                                                         Leaseholds Awarded.
                                                                                         Hashaa Plots Directly
                                                                                          Registered by the
                                                                                          Property Rights
                                                                                          Project.
Vocational Education Project....       47,355,638  Increase employment        2,255,071  Rate of employment of
                                                    and income among                      TVET Graduates.
                                                    unemployed and                       Students completing
                                                    underemployed                         newly designed long-
                                                    Mongolians.                           term programs.
                                                                                         Percent of active
                                                                                          teachers receiving
                                                                                          certification
                                                                                          training.
                                                                                         Technical and
                                                                                          vocational education
                                                                                          and training (TVET)
                                                                                          legislation passed.
Health Project..................       38,974,817  Increase the               2,591,403  Diabetes and
                                                    adoption of                           hypertension
                                                    behaviors that                        controlled.
                                                    reduce non-                          Percentage of cancer
                                                    communicable                          cases diagnosed in
                                                    diseases (NCDIs)                      early stages.
                                                    among target                         Road and traffic safety
                                                    populations and                       activity finalized and
                                                    improved medical                      key interventions
                                                    treatment and                         developed.
                                                    control of NCDIs.
Program Administration* and            44,294,082  ...................        8,509,865
 Control, Monitoring and
 Evaluation.
Pending subsequent reports**....  ...............  ...................           43,201
----------------------------------------------------------------------------------------------------------------
In late 2009, the MCC's Board of Directors approved the allocation of a portion of the funds originally
  designated for the rail project to the expansion of the health, vocational education and property right
  projects from the rail project, and the remaining portion to the addition of a road project.


 
                                                                           Cumulative
            Projects                 Obligated          Objectives       disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                     Country: Mozambique Year: 2010 Quarter 3 Total Obligation: $503,444,341
       Entity to which the assistance is provided: MCA Mozambique Total Quarterly Disbursement: $6,505,733
----------------------------------------------------------------------------------------------------------------
Water Supply and Sanitation           203,585,393  Increase access to         4,836,403  Time to get to non-
 Project.                                           reliable and                          private water source.
                                                    quality water and                    Percent of urban
                                                    sanitation                            population with
                                                    facilities.                           improved water
                                                                                          sources.
                                                                                         Percent of urban
                                                                                          population with
                                                                                          improved sanitation
                                                                                          facilities.
                                                                                         Percent of rural
                                                                                          population with access
                                                                                          to improved water
                                                                                          sources.
                                                                                         Number of private
                                                                                          household water
                                                                                          connections in urban
                                                                                          areas.
                                                                                         Number of rural water
                                                                                          points constructed.
                                                                                         Number of standpipes in
                                                                                          urban areas.
                                                                                         Final detailed design
                                                                                          for 5 towns submitted.
                                                                                         Final detailed design
                                                                                          for 3 cities
                                                                                          submitted.
Road Rehabilitation Project.....      176,307,480  Increase access to         2,639,508  Kilometers of road
                                                    productive                            rehabilitated.
                                                    resources and                        Percent of Namialo-Rio
                                                    markets.                              L[uacute]rio Road-
                                                                                          Metoro feasibility,
                                                                                          design, and
                                                                                          supervision contract
                                                                                          disbursed.
                                                                                         Percent of Rio Ligonha-
                                                                                          Nampula feasibility,
                                                                                          design, and
                                                                                          supervision contract
                                                                                          disbursed.
                                                                                         Percent of Chimuara-
                                                                                          Nicoadala feasibility,
                                                                                          design, and
                                                                                          supervision contract
                                                                                          disbursed.
                                                                                         Percent of Namialo-Rio
                                                                                          L[uacute]rio Road
                                                                                          construction contract
                                                                                          disbursed.
                                                                                         Percent of Rio
                                                                                          L[uacute]rio-Metoro
                                                                                          Road construction
                                                                                          contract disbursed.
                                                                                         Percent of Rio Ligonha-
                                                                                          Nampula Road
                                                                                          construction contract
                                                                                          disbursed.

[[Page 56591]]

 
                                                                                         Percent of Chimuara-
                                                                                          Nicoadala Road
                                                                                          construction contract
                                                                                          disbursed.
                                                                                         Average annual daily
                                                                                          traffic volume.
                                                                                         Average annual daily
                                                                                          traffic volume.
                                                                                         Average annual daily
                                                                                          traffic volume.
                                                                                         Average annual daily
                                                                                          traffic volume.
                                                                                         Change in International
                                                                                          Roughness Index (IRI)--
                                                                                          on Namialo-Rio
                                                                                          L[uacute]rio Road.
                                                                                         Change in International
                                                                                          Roughness Index (IRI)--
                                                                                          on Rio Ligonha-Nampula
                                                                                          Road.
                                                                                         Change in International
                                                                                          Roughness Index (IRI)--
                                                                                          on Rio L[uacute]rio-
                                                                                          Metoro Road.
                                                                                         Change in International
                                                                                          Roughness Index (IRI)--
                                                                                          on Chimuara-Nicoadala
                                                                                          Road.
Land Tenure Project.............       39,061,959  Establish                  4,657,219  Total number of
                                                    efficient, secure                     officials and
                                                    land access for                       residents reached with
                                                    households and                        land strategy and
                                                    investors.                            policy awareness and
                                                                                          outreach messages.
                                                                                         Time to get land usage
                                                                                          rights (DUAT), urban.
                                                                                         Time to get land usage
                                                                                          rights (DUAT), rural.
                                                                                         Number of buildings
                                                                                          rehabilitated or
                                                                                          built.
                                                                                         Total value of procured
                                                                                          equipment and
                                                                                          materials.
                                                                                         Number of people
                                                                                          trained.
                                                                                         Rural hectares mapped
                                                                                          in Site Specific
                                                                                          Activity.
                                                                                         Rural hectares mapped
                                                                                          in Community Land Fund
                                                                                          Initiative.
                                                                                         Urban parcels mapped.
                                                                                         Rural hectares
                                                                                          formalized through
                                                                                          Site Specific
                                                                                          Activity.
                                                                                         Rural hectares
                                                                                          formalized through
                                                                                          Community Land Fund
                                                                                          Initiative.
                                                                                         Urban parcels
                                                                                          formalized.
                                                                                         Number of communities
                                                                                          delimited.
                                                                                         Number of households
                                                                                          having land
                                                                                          formalized, rural.
                                                                                         Number of households
                                                                                          having land
                                                                                          formalized, urban.
Farmer Income Support Project...       18,276,217  Improve coconut            2,893,414  Number of diseased or
                                                    productivity and                      dead palm trees
                                                    diversification                       cleared.
                                                    into cash crop.                      Number of coconut
                                                                                          seedlings planted.
                                                                                         Hectares under
                                                                                          production.
                                                                                         Number of farmers
                                                                                          trained in pest and
                                                                                          disease control.
                                                                                         Number of farmers
                                                                                          trained in crop
                                                                                          diversification
                                                                                          technologies.
                                                                                         Income from coconuts
                                                                                          and coconut products
                                                                                          (estates).
                                                                                         Income from coconuts
                                                                                          and coconut products
                                                                                          (households).
Program Administration* and            66,213,292  ...................       12,447,947
 Control, Monitoring and
 Evaluation.
Pending Subsequent Report**.....  ...............  ...................          126,168
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objectives       disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                      Country: Lesotho Year: 2010 Quarter 3 Total Obligation: $354,167,605
        Entity to which the assistance is provided: MCA Lesotho Total Quarterly Disbursement: $6,566,418
----------------------------------------------------------------------------------------------------------------
Water Project...................      162,365,440  Improve the water         10,208,610  School days lost due to
                                                    supply for                            waterborne diseases.
                                                    industrial and                       Diarrhea notification
                                                    domestic needs,                       at health centers.
                                                    and enhance rural                    Time saved due to
                                                    livelihoods                           access to water
                                                    through improved                      source.
                                                    watershed                            Rural household (HH)
                                                    management.                           provided with access
                                                                                          to improved water
                                                                                          supply.
                                                                                         Rural HH provided with
                                                                                          access to improved
                                                                                          ventilated latrines.
                                                                                         Rural population with
                                                                                          knowledge of good
                                                                                          hygiene principles.
                                                                                         Urban HH with access to
                                                                                          potable water supply.
                                                                                         Number of enterprises
                                                                                          connected to water
                                                                                          network.
                                                                                         Households connected to
                                                                                          improved water
                                                                                          network.

[[Page 56592]]

 
                                                                                         Cubic meters of treated
                                                                                          water from metolong
                                                                                          dam delivered through
                                                                                          a conveyance system to
                                                                                          Water and Sewerage
                                                                                          Authority (WASA).
                                                                                         Hydrological flows
                                                                                          variability.
                                                                                         Reclaimed area.
Health Project..................      121,523,962  Increase access to         7,841,121  People with HIV still
                                                    life-extending ART                    alive 12 months after
                                                    and essential                         initiation of
                                                    health services by                    treatment.
                                                    providing a                          TB notification (per
                                                    sustainable                           100,000 pop.).
                                                    delivery platform.                   Percentage of PLWA
                                                                                          receiving ARV
                                                                                          treatment (by age and
                                                                                          sex).
                                                                                         Deliveries conducted in
                                                                                          the health centers.
                                                                                         Immunization coverage
                                                                                          rate.
Private Sector Development             35,593,055  Stimulate                  3,805,180  Average time (days)
 Project.                                           investment by                         required to enforce a
                                                    improving access                      contract.
                                                    to credit,                           Value of commercial
                                                    reducing                              cases.
                                                    transaction costs                    Cases referred to ADR
                                                    and increasing the                    that are successfully
                                                    participation of                      completed.
                                                    women in the                         Portfolio of loans.
                                                    economy.                             Loan processing time.
                                                                                         Performing loans.
                                                                                         Electronic payments--
                                                                                          salaries.
                                                                                         Electronic payments--
                                                                                          pensions.
                                                                                         Debit/smart cards
                                                                                          issued.
                                                                                         Mortgage bonds
                                                                                          registered.
                                                                                         Value of registered
                                                                                          mortgage bonds.
                                                                                         Clearing time--Country.
                                                                                         Clearing time--Maseru.
                                                                                         Time to complete
                                                                                          transfer of land
                                                                                          rights.
                                                                                         Land transactions
                                                                                          recorded.
                                                                                         Land parcels
                                                                                          regularized and
                                                                                          registered.
                                                                                         People trained on
                                                                                          gender equality and
                                                                                          economic rights.
                                                                                         ID cards issued.
                                                                                         Monetary cost of a
                                                                                          lease transaction.
Program Administration* and            43,685,148  ...................       13,462,757
 Control, Monitoring and
 Evaluation.
Pending Subsequent Report**.....  ...............  ...................          207,297
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objectives       disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                      Country: Morocco Year: 2010 Quarter 3 Total Obligation: $693,797,181
        Entity to which the assistance is provided: MCA Morocco Total Quarterly Disbursement: $18,500,633
----------------------------------------------------------------------------------------------------------------
Fruit Tree Productivity Project.      298,622,393  Reduce volatility         20,851,833  Number of farmers
                                                    of agricultural                       trained.
                                                    production and                       Number of
                                                    increase volume of                    agribusinesses
                                                    fruit agricultural                    assisted.
                                                    production.                          Number of hectares
                                                                                          under production.
                                                                                         Value of agricultural
                                                                                          production.
Small Scale Fisheries Project...      116,168,028  Improve quality of         3,381,663  Landing sites and ports
                                                    fish moving                           rehabilitated.
                                                    through domestic                     Mobile fish vendors
                                                    channels and                          using new equipment.
                                                    assure the                           Fishing boats using new
                                                    sustainable use of                    landing sites.
                                                    fishing resources.                   Average price of fish
                                                                                          at auction markets.
                                                                                         Average price of fish
                                                                                          at wholesale.
                                                                                         Average price of fish
                                                                                          at ports.
Artisan and Fez Medina Project..      111,873,858  Increase value               809,472  Average revenue of SME
                                                    added to tourism                      pottery workshops.
                                                    and artisan                          Construction and
                                                    sectors.                              rehabilitation of Fez
                                                                                          Medina Sites.
                                                                                         Tourist receipts in
                                                                                          Fez.
                                                                                         Training of potters.
Enterprise Support Project......       33,850,000  Improved survival          3,399,422  Number of enterprises
                                                    rate of new SMEs                      in pilot project
                                                    and INDH-funded                       receiving coaching.
                                                    income generating                    Value added per
                                                    activities;                           enterprise.
                                                    increased revenue                    Survival rate after two
                                                    for new SMEs and                      years.
                                                    INDH-funded income
                                                    generating
                                                    activities.
Program Administration* and            87,082,902  ...................       15,148,665
 Control, Monitoring and
 Evaluation.
Pending Subsequent Report**.....  ...............  ...................        3,173,509
----------------------------------------------------------------------------------------------------------------


[[Page 56593]]


 
                                                                           Cumulative
            Projects                 Obligated          Objectives       disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                      Country: Tanzania Year: 2010 Quarter 3 Total Obligation: $698,240,000
       Entity to which the assistance is provided: MCA Tanzania Total Quarterly Disbursement: $28,800,268
----------------------------------------------------------------------------------------------------------------
Energy Sector Project...........      202,934,428  Increase value             5,392,310  New power customers:
                                                    added to                              Kigoma.
                                                    businesses.                          New power customers:
                                                                                          Morogoro.
                                                                                         New power customers:
                                                                                          Tanga.
                                                                                         New power customers:
                                                                                          Mbeya.
                                                                                         New power customers:
                                                                                          Iringa.
                                                                                         New power customers:
                                                                                          Dodoma.
                                                                                         New power customers:
                                                                                          Mwanza.
                                                                                         New power customers:
                                                                                          Zanzibar.
                                                                                         Energy generation--
                                                                                          Kigoma.
                                                                                         Transmission capacity:
                                                                                          Kigoma.
                                                                                         Transmission capacity:
                                                                                          Morogoro.
                                                                                         Transmission capacity:
                                                                                          Tanga.
                                                                                         Transmission capacity:
                                                                                          Mbeya.
                                                                                         Transmission capacity:
                                                                                          Iringa.
                                                                                         Transmission capacity:
                                                                                          Dodoma.
                                                                                         Transmission capacity:
                                                                                          Mwanza.
                                                                                         Transmission capacity:
                                                                                          Zanzibar.
                                                                                         Percentage disbursed
                                                                                          for design and
                                                                                          supervision contract
                                                                                          Consulting Engineer
                                                                                          (CE) year 1 budgeted:
                                                                                          Distribution
                                                                                          Rehabilitation and
                                                                                          extension activity.
                                                                                         Percentage disbursed
                                                                                          for design and
                                                                                          supervision contract
                                                                                          Consulting Engineer
                                                                                          (CE) year 1 budgeted;
                                                                                          Zanzibar
                                                                                          Interconnector
                                                                                          activity.
                                                                                         Percentage disbursed
                                                                                          for design and
                                                                                          supervision contract
                                                                                          Consulting Engineer
                                                                                          (CE) year 1 budgeted;
                                                                                          Malagarasi hydropower
                                                                                          and Kigoma
                                                                                          distribution activity.
Transport Sector Project........      366,847,428  Increase cash crop        28,507,733  International roughness
                                                    revenue and                           index: Tunduma
                                                    aggregate visitor                     Sumbawanga.
                                                    spending.                            International roughness
                                                                                          index: Tanga Horohoro.
                                                                                         International roughness
                                                                                          index: Namtumbo
                                                                                          Songea.
                                                                                         International roughness
                                                                                          index: Peramiho
                                                                                          Mbinga.
                                                                                         Annual average daily
                                                                                          traffic: Tunduma
                                                                                          Sumbawanga.
                                                                                         Annual average daily
                                                                                          traffic: Tanga
                                                                                          Horohoro.
                                                                                         Annual average daily
                                                                                          traffic: Namtumbo
                                                                                          Songea.
                                                                                         Annual average daily
                                                                                          traffic: Peramiho
                                                                                          Mbinga.
                                                                                         Kilometers upgraded/
                                                                                          completed: Tunduma
                                                                                          Sumbawanga.
                                                                                         Kilometers upgraded/
                                                                                          completed: Tanga
                                                                                          Horohoro.
                                                                                         Kilometers upgraded/
                                                                                          completed: Namtumbo
                                                                                          Songea.
                                                                                         Kilometers upgraded/
                                                                                          completed: Peramiho
                                                                                          Mbinga.
                                                                                         Percent disbursed on
                                                                                          construction works:
                                                                                          Tunduma Sumbawanga.
                                                                                         Percent disbursed on
                                                                                          construction works:
                                                                                          Tanga Horohoro.
                                                                                         Percent disbursed on
                                                                                          construction works:
                                                                                          Namtumbo Songea.
                                                                                         Percent disbursed on
                                                                                          construction works:
                                                                                          Peramiho Mbinga.
                                                                                         Percent disbursed for
                                                                                          feasibility and/or
                                                                                          design studies:
                                                                                          Tunduma Sumbawanga.
                                                                                         Percent disbursed for
                                                                                          feasibility and/or
                                                                                          design studies: Tanga
                                                                                          Horohoro.
                                                                                         Percent disbursed for
                                                                                          feasibility and/or
                                                                                          design studies:
                                                                                          Namtumbo Songea.
                                                                                         Percent disbursed for
                                                                                          feasibility and/or
                                                                                          design studies:
                                                                                          Peramiho Mbinga.
                                                                                         International roughness
                                                                                          index: Pemba.
                                                                                         Average annual daily
                                                                                          traffic: Pemba.
                                                                                         Kilometers upgraded/
                                                                                          completed: Pemba.
                                                                                         Percent disbursed on
                                                                                          construction works:
                                                                                          Pemba.
                                                                                         Signed contracts for
                                                                                          construction works
                                                                                          (Zanzibar Rural
                                                                                          Roads).
                                                                                         Percent disbursed on
                                                                                          signed contracts for
                                                                                          feasibility and/or
                                                                                          design studies: Pemba.
                                                                                         Passenger arrivals:
                                                                                          Mafia Island.
                                                                                         Percentage of upgrade
                                                                                          complete: Mafia
                                                                                          Island.

[[Page 56594]]

 
                                                                                         Percent disbursed on
                                                                                          construction works:
                                                                                          Mafia Island.
Water Sector Project............       62,562,144  Increase investment        1,993,722  Number of households
                                                    in human and                          using improved source
                                                    physical capital                      for drinking water
                                                    and to reduce the                     (Dar es Salaam).
                                                    prevalence of                        Number of households
                                                    water-related                         using improved source
                                                    disease.                              for drinking water
                                                                                          (Morogoro).
                                                                                         Number of businesses
                                                                                          using improved water
                                                                                          source (Dar es
                                                                                          Salaam).
                                                                                         Number of businesses
                                                                                          using improved water
                                                                                          source (Morogoro).
                                                                                         Volume of water
                                                                                          produced (Lower Ruvu).
                                                                                         Volume of water
                                                                                          produced (Morogoro).
                                                                                         Percent disbursed on
                                                                                          Feasibility Design
                                                                                          Update contract Lower
                                                                                          Ruvu Plant Expansion.
Program Administration* and            53,896,000  ...................        7,339,868
 Control, Monitoring and
 Evaluation.
Pending Subsequent Report**.....  ...............  ...................          206,197
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objectives       disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                    Country: Burkina Faso Year: 2010 Quarter 3 Total Obligation: $484,298,973
      Entity to which the assistance is provided: MCA Burkina Faso Total Quarterly Disbursement: $5,552,469
----------------------------------------------------------------------------------------------------------------
Roads Project...................      194,130,681  Enhance access to            404,332  To Be Determined (TBD).
                                                    markets through
                                                    investments in the
                                                    road network.
Rural Land Governance Project...       60,392,771  Increase investment        2,185,845  TBD.
                                                    in land and rural
                                                    productivity
                                                    through improved
                                                    land tenure
                                                    security and land
                                                    management.
Agriculture Development Project.      141,934,693  Expand the                 2,775,002  TBD.
                                                    productive use of
                                                    land in order to
                                                    increase the
                                                    volume and value
                                                    of agricultural
                                                    production in
                                                    project zones.
Bright 2 Schools Project........       26,829,669  Increase primary          28,745,770  TBD.
                                                    school completion
                                                    rates.
Program Administration* and            61,011,159  ...................        9,686,605
 Control, Monitoring and
 Evaluation.
Pending Subsequent Report**.....  ...............  ...................                0
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objectives       disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                      Country: Namibia Year: 2010 Quarter 3 Total Obligation: $304,477,819
        Entity to which the assistance is provided: MCA Namibia Total Quarterly Disbursement: $9,977,192
----------------------------------------------------------------------------------------------------------------
Education Project...............      144,976,559  Improve the                6,836,450  To Be Determined (TBD).
                                                    education sector's
                                                    effectiveness,
                                                    efficiency and
                                                    quality.
Tourism Project.................       66,959,292  Increase incomes           2,207,959  TBD.
                                                    and create
                                                    employment
                                                    opportunities by
                                                    improving the
                                                    marketing,
                                                    management and
                                                    infrastructure of
                                                    Etosha National
                                                    Park.
Agriculture Project.............       47,550,008  Sustainably improve          405,044  TBD.
                                                    the economic
                                                    performance and
                                                    profitability of
                                                    the livestock
                                                    sector and
                                                    increase the
                                                    volume of the
                                                    indigenous natural
                                                    products for
                                                    export.

[[Page 56595]]

 
Program Administration* and            44,991,960  ...................        6,708,661
 Control, Monitoring and
 Evaluation.
Pending Subsequent Report**.....  ...............  ...................          113,820
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objectives       disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                 Country: Moldova (PRE-EIF) Year: 2010 Quarter 3 Total Obligation: $262,000,000
            Entity to which the assistance is provided: MCA Moldova Total Quarterly Disbursement: $0
----------------------------------------------------------------------------------------------------------------
Road Rehabilitation Project.....      132,840,000  ...................                0  To Be Determined (TBD).
Transition to High Value              101,773,401  ...................                0  TBD.
 Agriculture Project.
Program Administration* and            27,386,599  ...................                0  TBD.
 Monitoring and Evaluation**.
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objectives       disbursements           Measures
----------------------------------------------------------------------------------------------------------------
                 Country: Senegal (PRE-EIF) Year: 2010 Quarter 3 Total Obligation: $540,000,000
         Entity to which the assistance is provided: MCA Moldova Total Quarterly Disbursement: $100,165
----------------------------------------------------------------------------------------------------------------
Road Rehabilitation Project.....          800,000  ...................                0  To Be Determined (TBD).
Transition to High Value                6,788,251  ...................                0  TBD.
 Agriculture Project.
Program Administration* and               382,691  ...................                0  TBD.
 Monitoring and Evaluation**.
----------------------------------------------------------------------------------------------------------------
* Program administration funds are used to pay items such as salaries, rent, and the cost of office equipment.
** These amounts represent disbursements made that will be allocated to individual projects in the subsequent
  quarter(s) and reported as such in subsequent quarterly report(s)
*** Moldova and Senegal are expected to be obligated in 2010 when they enter into force (EIF).


 
                 619(b) Transfer or Allocation of Funds
-------------------------------------------------------------------------
  U.S. Agency to which Funds                           Description of
were Transferred or Allocated        Amount          program or project
------------------------------------------------------------------------
USAID........................        $15,073,050   Liberia Threshold
                                                    Program.
------------------------------------------------------------------------


    Dated: September 10, 2010.
T. Charles Cooper,
Vice President, Congressional and Public Affairs, Millennium Challenge 
Corporation.
[FR Doc. 2010-23064 Filed 9-15-10; 8:45 am]
BILLING CODE 9211-03-P